                             POST ACTIVITY REPORT

                               UXO INVESTIGATION

                                27 HILL STREET
REPORT




                             SUNSHINE BEACH, QLD
                                             V1.01



                               G-tek Australia Pty Limited
                                       [ABN 47 099 519 034]




                                  Unit 5K, 256 New Line Road
                                        Dural NSW 2158
                                        Ph 02 9651 6838
                                         www.g-tek.biz




         Project Ref:    19042ADSP

         Prepared For:   Adam & Sparkes Town Planning &
                         Sunshine Coast Regional Council
Log in to download the original file

UXO Report by G Tek.pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

 UXO Clearance
 Sunshine Beach, Qld
 Project No: 19042ADSP
 19042190428SCRC


                                        DISCLAIMER AND COPYRIGHT NOTICE
DISCLAIMER
Please Read This Disclaimer
This Document is an important legal document. The use of this report is governed by and subject to this disclaimer.
G-tek’s Client
The entity that commissioned this report, and who is G-tek Australia Pty Limited’s (G-tek’s) client is Sunshine Coast Regional
Council (The “Client”).
Purpose of This Report
This report was commissioned for the purpose of detailing the activities undertaken by G-tek on the Client’s site and the results
of those activities (The Purpose).
Disclaimer
G-tek accepts no responsibility or liability for any use of this report or any reliance upon this report by any person, other than the
use of the whole of this report by the Client consistent with the Purpose. G-tek accepts no responsibility or liability to any person
who relies upon a part of this report. This report must at all times be considered in its entirety.

COPYRIGHT
Copyright
G-tek is the owner of the copyright subsisting in this report.
Intellectual Property
This confidential report contains Intellectual Property that is owned by G-tek. No part of this document shall be reproduced
without the express permission in writing of G-tek.
License
G-tek grants to the Client a non-exclusive license for the full term of copyright throughout the world to use and reproduce this
Report for internal purposes only.
Infringement
The reproduction of any part of this Report by any person other than the Client, or for any reason not consistent with the Purpose
is an infringement of copyright, and will be prosecuted by G-tek.




Prepared by:

                               Ernie Hovey
                               Project Manager



Released by:
                               Greg Guthrie
                               Chief Operating Officer



                                               DOCUMENT VERSION CONTROL
                 Version                          Date                        Raised By                     Released By
                  1.01                        19 July 2019                    E Hovey                       G Guthrie


                                                 DOCUMENTATION CONTROL
                  Copy Number                                                Issued To
                       1                         Adam & Sparkes Town Planning & Development
                       2                         G-tek Australia Pty Limited

                                                             Copy 1 of 2


                                                 © G-tek Australia Pty Limited, 2019

Page 3

 UXO Clearance
 Sunshine Beach, Qld
 Project No: 19042ADSP
 19042190428SCRC


The following Definitions apply within this Report:
Ammunition: A device charged with explosives, propellants, pyrotechnics, initiating composition, or nuclear,
biological or chemical material for use in connection with defence or offence including demolitions. Certain
ammunition can be used for training, ceremonial or other non-operational purposes.
Ammunition Produce: Non-explosive stores and components used in the assembly or the initiation of ammunition.
Explosive Ordnance (EO): All munitions containing explosives, nuclear fission and fusion materials and biological
and chemical agents. This includes bombs and warheads; guided and ballistic missiles; artillery, mortar, rocket and
small arms ammunition; all mines, torpedoes and depth charges; demolition charges; pyrotechnics; clusters and
dispensers; cartridges and propellant actuated devices; electro-explosive devices; clandestine and improvised
explosive devices; and all similar or related items or components explosive in nature.
Explosive Ordnance Waste (EOW): Inert material remnant from the initiation or functioning of explosive ordnance.
Field Validation Survey (FVS): A percentage field sampling activity designed to determine whether an area is
affected by UXO, the boundaries of any affected area, the location of impact points within any affected area and the
nature and concentration of UXO within any affected area (see also UXO Assessment).
Fragmentation: Metallic fragments of the fractured casing of EO resultant from the initiation of high explosive filling
and often projected at high velocities over considerable distances from the point of initiation.
Hazard Reduction Operation (HRO): An operation designed to reduce the EO hazard within the boundaries of an
affected area (see also UXO Remediation).
Military Produce: Any item identified as military in origin that is not ammunition-related.
Safeguarding: An operation designed to monitor excavation or drilling processes in an area of potential UXO risk.
Small Arms: All arms, including automatic weapons of less than 20 mm in calibre and all gauges of shotguns.
Small Arms Ammunition (SAA): Ammunition for small arms, ie all ammunition of less than 20 mm in calibre, and
all gauges of shotgun cartridges.
Small Arms Ammunition Waste (SAAW): Inert material remnant from the transport, packaging, preparation, and
use of SAA.
Unexploded Ordnance (UXO): Explosive ordnance that has been primed, fused, armed or otherwise prepared for
action and which has been fired, dropped, launched, projected or placed in such a manner as to constitute a hazard
to operations, installations, personnel or material but remains unexploded either by malfunction or design or for any
cause. UXO includes items of military ammunition or explosives removed from their original resting-place for any
reason, including souveniring by members of the public.
UXO Assessment: An activity designed to determine whether an area is affected by UXO, the boundaries of any
affected area, the location of impact points within any affected area and the nature and concentration of UXO within
any affected area (see also Field Validation Survey).
UXO Investigation: A systematic examination to determine whether an area is affected by UXO. UXO Investigation
may include historical research, field assessment/survey activities and/or remedial works.
UXO Remediation: An operation designed to reduce the EO hazard within the boundaries of an affected area (see
also Hazard Reduction Operation).




                                            © G-tek Australia Pty Limited, 2019

Page 4

    UXO Clearance
    Sunshine Beach, Qld
    Project No: 19042ADSP
    19042190428SCRC




Table of Contents

1.0       INTRODUCTION                                                          1
2.0       AUTHORITY TO UNDERTAKE THE TASK                                       1
3.0       OBJECTIVES                                                            1
.4.0      NATURE OF THIS REPORT                                                 1
5.0       DATES OF CONDUCT                                                      2
6.0       CONTRACTOR DETAILS                                                    2
6.1        Personnel                                                            2
7.0       SITES DETAIL                                                          2
8.0       SITES CHARACTERISTICS AND PREPARATION                                 2
9.0       UXO CLEARANCE Task                                                    2
10.0 UXO INVESTIGATION METHODOLOGY                                              3
12.0 CONFIDENCE LEVELS                                                          3
13.0 CONCLUSIONS                                                                3
14.0 RECOMMENDATIONS                                                            3

Attachments:
1       Search Equipment Specifications




                                          © G-tek Australia Pty Limited, 2019

Page 5

 UXO Clearance
 Sunshine Beach, Qld
 Project No: 19042ADSP
 19042190428SCRC



1.0      INTRODUCTION
Adam & Sparkes Town Planning & Development contracted G-tek Australia Pty Limited (G-tek) to conduct
unexploded ordnance (UXO) Investigation within 27 Hill Street Sunshine Beach on the Sunshine Coast. These UXO
Investigations are considered necessary because of a “Substantial” potential for UXO contamination in these areas
because of the military training conducted during World War Two (WWII).


2.0      AUTHORITY TO UNDERTAKE THE TASK
Email Andy Pannifex (property owner)/Greg Guthrie Thursday 27Jun19.

3.0      OBJECTIVES
The objectives of this task were:
1.     Unexploded Ordnance (UXO) investigation and clearance work of the residential site at 27 Hill Street,
       Sunshine Beach,
2.     Appropriate liaison for the disposal of any identified UXO in a timely and safe manner which will not impact
       the proposed development;
3.     The removal of explosive ordnance waste (EOW) from site;
4.     Provide a Post Activity Report (PAR) detailing investigation/remediation methodology, results of all activities;
       UXO/EO register and handover and recommendations of any further actions required. Confirmation of
       confidence level regarding the results of all activities

4.0      NATURE OF THIS REPORT
This Report details the conduct of the Investigation and the results obtained. All relevant documentation is included
as part of this report.

5.0      DATES OF CONDUCT
Site investigation using a Foerster Ferex 4.032 Magnetometer was conducted on the 11th July 2019.

6.0      CONTRACTOR DETAILS
The contracting firm is G-tek Australia Pty Limited (G-tek) ABN 47 099 519 034; G-tek is a member of the current
Department of Defence Environmental & Heritage Panel (DEHP) and is qualified to conduct UXO related works.
6.1      Personnel
The following personnel were directly involved in this operation:
Project Supervisor                   Greg Guthrie
Ammunition Technician                Ernie Hovey                                                                          tt

7.0      SITES DETAIL
The following areas were the requested UXO investigation sites.
       Residential allotment located at 27 Hill Street Sunshine Beach.




                                           © G-tek Australia Pty Limited, 2019
                                                                                                                 Page 5

Page 6

 UXO Clearance
 Sunshine Beach, Qld
 Project No: 19042ADSP
 19042190428SCRC




        Figure 1. Site location and limits (Site survey supplied by client).




8.0     SITES CHARACTERISTICS AND PREPARATION
On arrival at the site, the G-tek team contacted Andy Pannifex (property owner) and was advised that the contracted
UXO clearance could proceed.
The site had been cleared of demolition materials, graded and enclosed by temporary fencing to restrict access and
outline limits of search.




                                         © G-tek Australia Pty Limited, 2019
                                                                                                           Page 6

Page 7

 UXO Clearance
 Sunshine Beach, Qld
 Project No: 19042ADSP
 19042190428SCRC




.
Figure 2 – Site characteristics.


9.0     UXO CLEARANCE TASK
This task was conducted to ensure that the proposed development of this site involving intrusive works could be
conducted without risk of injury from unexploded ordnance to contractors and other involved parties..




                                        © G-tek Australia Pty Limited, 2019
                                                                                                        Page 7

Page 8

 UXO Clearance
 Sunshine Beach, Qld
 Project No: 19042ADSP
 19042190428SCRC


10.0     UXO INVESTIGATION METHODOLOGY
The task was conducted by trained UXO operator applying a Foerster Ferex 4.032 Magnetometer along 0.5-metre-
wide parallel transects, over 100% of the site. The Foerster Ferex 4.032 provides the operator with both aural and
visual cues in the presence of ferrous metal. Each cue was intrusively investigated using manual digging tools with
the source positively identified and removed from its located area. The exception was a reinforced concrete pier that
could not be removed by manual excavation to a depth of 600mm and was left in situ.
Once the identified item was removed, the location was re-searched to ensure that the removed item was not
“masking” additional items; once this check indicated no additional items, search of the transect continued until it was
clear. This process was continued until 100% of each Site was investigated.




 Figure 3 – 4.032 Magnetometer                                Figure 4 – Guide chain layout.


11.0 OUTCOMES
No items of unexploded ordnance (UXO) were identified during these investigations.
No items of Explosive Ordnance Waste (EOW) were identified during these investigations.

12.0 CONFIDENCE LEVELS
The personnel and equipment used for this investigation were appropriate for the task. In view of the capabilities of
the detection equipment, and search methodology applied to these Sites, a high level of confidence has been
achieved.

13.0     CONCLUSIONS
As a result of the UXO clearance, it is considered that the Site contains no remnant unexploded ordnance, explosive
ordnance or explosive ordnance waste that may impact required works.

14.0     RECOMMENDATIONS
As a result of these UXO Investigations, it is recommended that proposed development works proceed:




                                           © G-tek Australia Pty Limited, 2019
                                                                                                                Page 8

Page 9

UXO Investigations
Sunshine Coast, Qld
Project No: 19038SCRC




                                   ATTACHMENT 1

                        SEARCH EQUIPMENT SPECIFICATIONS




                              © G-tek Australia Pty Limited, 2019

Page 10

 UXO Investigations
 Sunshine Coast, Qld
 Project No: 19038SCRC




         FORSTER FEREX 4.03 MAGNETIC GRADIOMETER
                TECHNICAL SPECIFICATIONS




TECHNICAL SPECIFICATIONS
 Operating Voltage                                6 to 12v DC
 Batteries                                        4 mono-cells each 1.5v IEC R 20
 Sensitivity range operation modes 1-3            Sensitivity range x full scale value
                                                  10 = full scale deflection
                       0.3                                                 3 nT
                       1                                                  10 nT
                       3                                                  30 nT
                      10                                                100 nT
                      30                                                300 nT
                     100                                               1000 nT
                     300                                               3000 nT
                    1000                                            10,000 nT
 Operating threshold for acoustic
 transducer                                       20% of scale value
 Probe tube with sealing plug watertight to
 a pressure of                                    10 bar - 100 m depth underwater
 Base clearance of the probes                     600 mm
 Operational conditions                           Accords with STANAG 2831

PHYSICAL SPECIFICATIONS
 Temperature                                            -30º to +55ºC
 Humidity                                               Up to 100%
 Dimensions                                             LxWxD
 Power supply                                           104 x 315 x 100 (mm)
 Control unit                                           104 x 252 x 96 (mm)
 Probe                                                  600 mm long x 45 mm Ø
 Carrying handle                                        1055 mm long
 Transit case                                           1120 x 310 x 175 (mm)

(Specifications can be amended by Foerster without notice)




                                     © G-tek Australia Pty Limited, 2019

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.