Skip to the record
Every meeting, every word.

Council archive · source document

Operational Works Application OPW18/0016

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                              Department of Infrastructure, Local Government and Planni



Section 2 - Further develo ment details

   Material change of use                    o Ves - complete division 1 if assessable against a local planning instrument
   Reconfiguring a lot                       o Ves - complete division 2
   Operational work                           IX! Ves - complete division 3
   Building work                             o Ves - complete DA Form 2 - Building work details
Division    1 - Material     change        of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
plann"n • "nstrument
   8.1) Describe the proposed material change of use
   Provide a general description of the                   Provide the planning scheme definition                Number of dwelling          Gross fioor
   proposed use                                           (include each definition in a new row)                units (if applicabla)       area (m2)
                                                                                                                                            (if applicabla)




   8.2) Does the proposed use Involve the use of existing bUildings on the premises?
   OVes
   DNa




   o Subdivision       (complala   10))                                 o Dividing land into parts by agreement              (complala   11))

   o Boundary realignment            (complala    12))                  o Creating or changing an easement giving access to a lot from
                                                                            a construction road (complala         13))



   10) Subdivision
   10.1) For this development,            how many lots are being created and what IS the Intended use of those lots.
   Intended use of lots created                  Residential            Commercial                 Industrial            Other, please specify:


   Number of lots created
   10.2) Will the subdivIsion be staged?
   o Ves - provide additional details below
   DNa
   How many stages will the works include?
   What stage(s) will this development application
   apply to?


   11) Dividing land into parts by agreement - how many parts are being created and what is the Intended use of the
   parts?
   Intended use of parts created                 Residential            Commercial                 Industrial            Other, please specify:


   Number of parts created




                                                                                                                                                        Page 4
                                                                                                                DA Form 1 - Development Application details
                                                                                                                                   Version 1.()-3    July 2017

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW18_0016.pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.