Council archive · source document
Reference Document OPW19 0098 Acid Sulphate Investigation · OPW19/0098
August 2003 -1- 03683042(AA) 4.0 “INTRODUCTION This report details the results of an acid sulfate soil (ASS) investigation carried out by Golder Associates for a proposed commercial development described as “Precinct N” and Socated north of Eumundi — Noosa Road, Noosaville. The investigation was undertaken for Mintgrove Pty Ltd at the request of Noosa Town Planning. The development includes filling more than 500 m’, with an average fill depth of greater than 0.5 m, on land below the RL 5 m AHD contour. The investigation was undertaken in order to _ assess the extent of acid sulfate soils and acid ground water across the development site in accordance with the requirements of the State Planning Policy 2/02 “Planning and Managing Development involving Acid Sulfate Soils” (SPP 2/02). This report details the results of the fieldwork and laboratory testing together with an assessment of the extent of ASS. 2.0 SITE DESCRIPTION “Precinct N” (‘the site’) is located in the northern part of an allotment described as Lot 311 on SP114182 that covers a total area of 4.368 hectares. Access to Lot 311 is via Gateway Drive off Eumundi — Noosa Road in the south, and via a track that traverses the adjacent Lot 23 on RP867628 from Venture Drive in the east. A residential development is located to the west of the site, with vacant land located to the north and an industrial subdivision to the east. The site covers an area of about 1.33 hectares and is mostly covered by dense regrowth vegetation including she-oak and melaleuca. Some vegetation had been cleared from the western part of the site at the time of the investigation. The remainder of Lot 311 had been recently cleared. The ground surface generally slopes at about 2° to 3° towards the north, before increasing up to about 10° adjacent to a break-in-slope which defines the southern edge of a relatively level, low-lying area. The break-in-slope intersects the north-eastern part of the site and is shown in Figure 1, together with the approximate extent of vegetation. Vegetation at the southern fringe of the low-lying area is similar to that described across the sloping part of the site, however changes to short (sedge) grasses together with scattered melaleuca about 20 m to 30 m towards the north. It is inferred that the low-lying area is part of the flood plain associated with Lake Doonella, which is located about 300 m to the north of the site. 3.0 PROPOSED DEVELOPMENT A drawing prepared by Herwig Hartl shows the proposed development layout together with proposed site levels and drainage (ref. Figure 2). The proposed development will comprise three childcare buildings, a swim school, gymnasium and an indoor entertainment and education building together with car parking areas. Earthworks will consist of mostly filling to depths of up to about 2 m, with some cutting up to about 1 m depth in the south-western corner of the site (above RL 5 m AHD). Given the proposed filling and design invert levels for the stormwater drains, trench excavations within in situ soils will be minimal. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document OPW19 0098 Acid Sulphate Investigation.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.