Original source · versioned page text
6.0 Planning Report
Attached to the e-mail Plans and Planning Report - MCU16/0098 & OPW16/0183.
Earthworks Code
The proposed development achieves the specific outcomes of the Earth Works Code as
detailed in the attached Engineering Drawings.
Erosion and Sediment Control Code
The proposed development achieves the specific outcomes of the Erosion and Sediment
Control Code as detailed in the attached Engineering Drawings.
Existing Services Code
The proposed development achieves the specific outcomes of the Existing Services Code as
detailed in the attached Engineering Drawings
Transport, Roads and Drainage Code
The proposed development achieves the specific outcomes of the Transport, Roads and
Drainage Code as detailed in the attached Engineering Drawings. There is no existing
pedestrian/cycle path infrastructure completed at present, however the proposed
development has been designed to accommodate such infrastructure in this proposal. Refer
to Empire Engineers civil drawings.
Waste Management Code
The proposed development achieves the specific outcomes of the Waste Management Code
as contained within Table 14-60. Please refer to the attached Building Design Drawings
prepared by us reflecting the detail, location, storage and waste management receptor as
required within the applicable table
Water Sensitive Design Code
The proposed development achieves the specific outcome of the Water Sensitive Design
Code as detailed in the attached Engineering Drawings.
APPLICABLE CODE AND OVERLAY ASSESSMENT TABLES
Division 26. Specific Outcomes and Probable Solutions for the Industry Zone
Building Suncoast Green (07) 5448 8500
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.