6.0 Planning Report
Attached to the e-mail Plans and Planning Report - MCU16/0098 & OPW16/0183.
BUSINESS USES CODE
14.12 Specific Outcomes and Probable Solutions for the Business Uses Code
column 1 Specific Outcomes column 2
Probable solutions (if code assessable)
14.16 Effects of use
Electricity infrastructure S18.1 No solution provided
O18 The development does not Complies - Existing building
adversely impact on existing or does not adversely impact on
future electricity supply electricity infrastructure. Initial
infrastructure; detail surveys indicated
underground mains running
AND through the middle of the site. A
recent DBYD search with
O19 All uses and works maintain an
Energex appears to contradict
adequate safe distance from
this with Energex plans
electrical infrastructure including
substations, overhead power lines, indicating the service runs
power poles and transformers. around the site within the
nature strip. We have included a
copy of the DBYB search with
application
S19.1 Development for uses adjacent
to or within 50m of an existing Complies - Premises is not
electricity substation incorporates located within 50m of an
noise attenuation measures to electricity substation.
mitigate noise impacts;
AND
S19.2 Buildings and structures Complies – Is not built
(including swimming pools, sheds, within easement or overhead
tennis courts and outbuildings) are power lines.
not constructed under overhead
electricity transmission lines, or
within electricity easements
Building Suncoast Green (07) 5448 8500
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.