Council archive · source document
Apdx 2 - Landscape Plans · MCU24/0001
Plans and drawings: the text below has words only, no drawings.
2 JAN STREET, NOOSA HEADS Landscape Plan Package Drawing Schedule · Cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan prescribed 4.0 Planting 5.0 Maintenance Tasks proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater New Gardens · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement LD1 Drawing Schedule, Specifications than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. · See 1.0 Topsoil for cultivation and topsoil requirements. with Owner. LD2 Finishes and Planting Schedules · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall · Spread ameliorated site topsoil or A.S. 4419 imported organic topsoil to a depth of 300mm Irrigation and Watering percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately) LD3 Details providing a natural appearance with no abrupt edges. Trim topsoils for gardens and turfing 2% · Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry LP1 Planting Plan - Ground Floor minimum slope away from all structures to pits or swales. · Mulch gardens with LA approved A.S. 4454 imported organic mulch as specified 100mm deep (unless it rains adequately). LP2 Planting Plan - First Floor settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched · Once a week there after. 2.0 Landscape Construction areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. · If turf sprinklers are installed, check turf rotor head radius once per month to ensure spray Landscape Specifications · All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds head layout provides head to head coverage - adjust as required. Levels (specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. Mowing These landscape plans must be read in conjunction with the appropriate statutory approvals and · See plan for engineer's plan levels and proposed levels. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation and/or Australian Standards and with the Operational Works Landscaping Decision Notice once issued. · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a Tree Planting 50mm high. Do not remove more than 31 of grass height at any one time. These plans have been developed to comply with Council's Planning Scheme-Landscape Code. discrepancy occurs notify superintendent and/or LA. · Refer to street tree and tree planting details (as applicable) for information. · Mowing Thereafter - 40mm H remaining 11 weeks then 25mm thereafter. Mow once a week · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. · All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this during summer, once every two weeks in spring and autumn, and once a month in winter or as 1.0 General Notes · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage specification. required if there is a lot of growth or as desired. and no ponding areas. · Landscape contractor to peg street tree positions for approval by superintendent before Topdressing Abbreviations · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled excavation. · When lawn areas have become established, and immediately after the first cut, top-dress lawn · A.S. - Australian Standards · DBH - Diameter at breast height (1.4m) turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · All trees to have a full and even crown. lightly to a depth of 10mm with a light sandy loam-based topsoil. Rub the dressing well into the · E.P. - Establishment Period · H.D. - Hot Dipped design and finish levels. · Install trees at locations indicated on the plans, per notes and details herein. joints and correct any unevenness in the turf surface. Topdressing is not to be carried out · LA - Landscape Architect · MP - Maintenance Period · Co-ordinate establishment of levels with superintendent. · Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified during the winter months. · MPA - Megapascals · m² - square metre · m³ - cubic metre 100mm deep settled. Do not mulch within 50mm of trunk / plant stem. Weed Removal: As required to reduce competition and seeding. · NATA - National Association of Testing Authorities · N/A - Not applicable Drainage · Edge trees per details. Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, · O.C. - On centre · PE - Pool Equipment · S - Spread · All damaged stormwater pipes are replaced and relocated as necessary. · Tree staking - per details. with plants of the same species and of similar size and quality unless otherwise specified. · NC - Noosa Council · typ. - Typical · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · All trees to be located minimum; Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and · uPVC- Unplasticised Polyvinyl Chloride · VPZ - Vegetation Protection Zone buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before - 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing guying when instructed by the superintendent. continuing works. for service setbacks) or as dimensioned on plans, from underground services (confirm Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are · These plans are not for tender or construction. There are no existing trees to be removed. · Drainage works to correlate with and not disturb adjacent land. locations on-site prior to pit excavation) and stormwater pipes established or Off-maintenance respectively. · See legend for plan symbols and plans for locations. - 1500mm from concrete paths and pavement profiles, horizontally and vertically from Monitoring: Provide a monthly report on completed tasks. Preliminaries · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped sewer lines, and property connections · Refer to plans by others for all services locations, footpath works, levels (other than those galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements - 2m from stormwater catch pits Warranties indicated on these plans) and boundaries. All services and related infrastructure including on-site in addition to those on plans. - 3m from fire hydrants, driveway crossovers, adjoining, new, or perpendicular lot · Warranties or guarantees specified shall name the Owner as warrantee. Register with street lighting shown on these plans are indicative only. · All drainage pits and subsurface drains to be connected to existing stormwater drainage boundaries manufacturers as necessary. Retain copies delivered with and components and equipment to · Call 'Dial Before You Dig 11 00' prior to any excavation. system. Refer engineer's drawings for drains and hydraulic services. the Owner. · Before work commences the subcontractor is to organise a pre-start meeting with the LA to · Stormwater drainage to be Ø100mm minimum uPVC SN8 AS 1260.2017 solid drainage pipe. General Planting · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within establish scope of works management procedures and clarify any issues. · Subsurface drainage to be Ø100mm minimum black slotted HDPE AS2439.1 pipe centred in · Refer to detail(s) herein respectively. fourteen (14) days after practical completion. · Install tree protection measures as per plans and detail. 300mm x 300mm gravel trench. Gravel to be Ø6 - 10mm No-fines aggregates surrounded by · Supply and place plants according to plant schedule, plant setout notes and plan locations. · Commence Warranty periods at practical completion or at acceptance of installation, if · Prior to commencing construction works, verify dimensions, levels and location of site LA approved permeable bidim or geotextile fabric. See Detail(s) for more information. · Where discrepancies occur advise superintendent prior to planting. acceptance is not concurrent with practical completion. services, refer engineer's drawings generally. · Furnish and install 1m³ of Ø75mm - 150mm washed, sound, rounded Mary River · Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated · If installation is not by manufacturer and product warranty is conditional on the manufacturer's · Dimensions take precedence over scale. gravel cobbles / spalls over pinned permeable geo-fabric at all new landscape drainage on plans. approval of the installer, submit the manufacturer's written approval of the installing firm. · Contractor to review all schedules herein to confirm their correlation to these plans. Where daylight points. · Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups discrepancies occur within landscape documentation refer to LA prior to provision of tender · Where and if additional drainage is required the following applies: to achieve optimum cover related to mature plant size and form. Deliverables pricing and/or construction. - Allow for seepage interception sub-surface drainage where paths and landscape works · Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs, · Warranties impede drainage (to be coordinated on site). garden edges and paths to allow for mature plant form. Confirm with LA which require more · Irrigation System As-built plans in .dwg and PDF formats Erosion and Sediment Control - Allow for 300mm x 300mm gravel trench with Ag-line under path, discharge to natural distance. · The landscape contractor to implement and maintain for the contract duration, best practice drainage lines. · All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate Certifications erosion and sediment control measures in accordance with the manual for erosion and - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock. Furnish LA with the following certifications prior to Practical Completion: sediment control (Maroon Manual), good environmental practice and the consulting civil of low point. Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons. · A.S. 2303:2018 Tree Stock for Landscape Use engineer's specification for erosion and sediment control. Penalties and fines for · Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls. · A.S. 4419 Topsoil non-compliance will apply. Fencing · Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours, · A.S. 4454 Mulch · Install silt control fencing in accordance with site environmental management plan and local · Supply and construct fencing per plans, details, and Finishes Schedule. notify superintendent and correct drainage. · Turf authority regulations. · Soak plants thoroughly before removing from container. · Sediment and erosion control devices to be installed where necessary and as directed on site Edging · Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted Sources by superintendent. · Supply, install, and maintain edges as specified and shown on the plans and details and and coiled roots to expose young roots. All stock to be free of structural defects above and · Survey: Focus on Surveying · All sediment and erosion control devices are to be installed in accordance with manufacturer's Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie below soil line (i.e. no girdled roots). · Architecture: qldBUILT specifications. off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. · Do not mix soil from hole with mulch and do not compact plant pit. · Civil Engineering: Arcos · The contractor is responsible for ensuring sediment and erosion control devices are inspected · Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported and maintained as follows; 3.0 Irrigation - If Installed A.S. 4419 topsoil. a) During construction: Daily during dry weather, prior to predicted storm events, twice · Water plant in well and maintain soil moisture levels through E.P. daily during prolonged rain Preliminaries b) During establishment period: Weekly during dry weather, prior to predicted storm · Liaise with relevant Noosa Council authorities and obtain any approval as required. New Turfed Areas events, twice weekly during prolonged rain · Comply with government standards and co-ordinate with other trades.· · See 1.0 Topsoil for cultivation and topsoil requirements. · All stockpiles are to be protected with suitable erosion control devices and graded to ensure · Check locations of penetration/conduits and install where required. · Trim topsoil, fill depressions and provide even falls as indicated on drawings. control of runoff. · Contractor to provide qualifications and insurances before construction. · Finished turf grades/contours shall be smooth and undulating, free from deleterious materials, · Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Irrigation system is a 'Design + Build' system. debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and compatibility and consistency in control measures. no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. Provide: laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow · Supply and install a new: Automatic electronic controller with a lockable stainless steel case, unimpeded over laid turf to low area respectively. Site Works rain sensor, backflow preventer per Council standards with a stainless steel enclosure, · Supply and lay 'A' grade turf per plans and schedules. · Remove all unwanted material, deleterious and operational debris from site. isolation valves, pressure regulator(s) as required, Irritrol System control valves for drip, check · Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is · If provided levels are not functional refer to the site superintendent and/or LA. valves, black plastic valve boxes, looped mainline, thrust blocks (as required), fittings, and drip well established. · Civil engineering designs have provided a positively drained site. If there are drainage issues lines and emitters for gardens. If sprinklers are installed for turf areas (i.e. overhead spray), · Water turf in well and apply water to maintain soil moisture until established. refer site superintendent. sprinklers / rotors shall be Hunter or LA approved equal. · Refer to 2.0 Landscape Construction - Drainage for more information. · Turf area irrigation to have head to head coverage and no overspray onto hard surfaces. Check head radius once per month to ensure spray head layout provides head to head Conduits coverage. · Furnish and install 2 - 150mmØ solid A.S. 1260:2017 uPVC SN8 or SN10 piping · Install uPVC conduits, 2xØ of pipe used, under all hard surfaces prior to hard surface perpendicularly under all footpaths that bisect landscape areas for irrigation and landscape construction. Extend ends of conduits 300mm beyond surfaces, cap (do not glue caps to drainage purposes. Extend ends 300mm beyond paths, each side and cap (do not glue caps). conduits) and install used survey pegs at ends for reference. Mark and install recycled surveyor's pegs at end caps for identification. · All valve boxes to be located in gardens (not in turf or swales) 300mm from and perpendicular to surfaces. Topsoil - Harvesting, Stockpiling, Amelioration, Re-use and Spreading · All mainlines to have 450mm of topsoil cover and 300mm for lateral lines. · Harvested and stockpiled site topsoils if practical and reinstall per the following specifications · Align all mainlines and lateral lines 1m from all trees and in close approximation to new paths in respective landscaping areas. / hard surfaces as possible. · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of · Do not irrigate road reserve areas. preserved vegetation driplines. · For practical completion ensure whole system is operational. · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer · Irrigate plants and turf ensuring adequate plant moisture is maintained during establishment. or owner which will not hinder visibility for inspection of the work. · Adjust system post establishment so it operates during dry and hot periods so plants and turf · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with areas are adequately watered to maintain healthy and vibrant conditions. results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape · Contractor to provide a twelve month guarantee, maintain against faulty workmanship and contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted materials for system from date of practical completion. by a NATA accredited lab. · Provide CAD 'As-built' drawing and PDF of same to Owner and a laminated copy in the · Should amended site topsoils be insufficient in quantity, contractor to import AS4419 topsoil controller door for reference when applying for practical completion clearly showing main-line and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have runs and sizes, valve types / station numbers / valve design pressure, head types and soils analyses test as per above. Amend Imported soils per test results prior to spreading. locations. NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 23104 Proposed Duplex Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. 2 Jan Street, Noosa Heads, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia Do not scale from PDF plans. M: +614 7705 5222 LD1 Drawing Schedule, Specifications E: [email protected] 16.12.23 A For Application BB BB Sheet Title Sheet 1 of 5 Client: qldBUILT Pty Ltd W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity SC6.3.4.1-3 species, Native, Notes
Hardscape Trees
STE Garden Edge Steel Garden Edging 'FormBoss' 'Redcor', 150mm H x 2mm gauge including tapered 300mm stakes. Install per manufacturer's Formboss, local representative: ACR imp ACRONYCHIA imperforata - Fraser Island Apple 45 L 1 Yes
specifications. Refer to Specifications and Detail. Set edging 25mm into property when adjacent to road Tranquil Building and
reserve boundary. Landscapes BAN int BANKSIA integrifolia -Coastal Banksia 45 L 1 Yes
07 5497 8774
CAL vim CALLISTEMON viminalis - Weeping Bottle Brush 45 L 1 Yes
TE Garden Edge Timber Garden Edging Refer to Specifications and Detail Nominated by contractor and
approved by superintendent CIT eur CITRUS lemon 'Eureka' 15 L 1 Food source
Softscape CIT lim CITRUS aurantifolia 'Tahitian Lime' 15 L 1 Food source
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and Shrubs
import A.S. 4419 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with ameliorated site topsoil or approved by superintendent.
areas. Provide soil testing results for topsoil and A.S. 4419 topsoil. Refer to details. ALP cae ALPINIA caerula - Native Ginger 140mm 4 Yes
certification to Landscape Architect.
BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 200mm 2 Yes
Podium Soil Raised Planters and Podium Planters at Podium Planter Profile, Water Proofing, Protection Board, Drainage Cell, Geotextile Fabric and Sand: By builder Podium Soil: Fytogreen
Levels 1 Soil: Light weight, purpose suited 1 300 182 341 BAN obl BANKSIA oblongifolia - Dwarf Banksia 140mm 8 Yes
Nominated by contractor and
approved by superintendent BAN rob BANKSIA robur - Swamp Banksia 140mm 2 Yes
Gravel Mulch Gravel mulch with pavers and around pits Install Ø40-70mm drainage gravel mulch, 300mmØ around and 150mm deep surrounding hydraulic yard drains/pits Nominated by contractor and COR rub CORDYLINE 'Rubra' 200mm 2 Yes
presenting 100% cover over pinned geo-fabric, and kept 50mm away from plant stems. approved by superintendent
HEL fus HELICONIA psittocroum 'Fuchsia' 180mm 6 Around pool areas, < 25%
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent HEL jam HELICONIA stricta 'Jamaican Dwarf' 180mm 16 Around pool areas, < 25%
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and HEL sas HELICONIA psittocroum 'Sassy' 180mm 10 Around pool areas, < 25%
approved by superintendent
SYZ san SYZYGIUM australe 'Straight and Narrow' 200mm 18 Native
Groundcovers
BAL tet BALOSKION tetraphylla -Tassel Cord Rush 140mm 2 Yes
CAS gla CASUARINA glauca 'Cousin It' 140mm 19 Yes, 350mm O.C.
CIS rho CISSUS rhombifolia 'Ellen Danica' 140mm 34 Around pool areas, < 25%
GRE coo GREVILLEA 'Cooroora Cascade' 140mm 16 Native
JUN usi JUNCUS usitatus - Common Rush Tubes 25 Yes
LOM lit LOMANDRA 'Little Con' Tubes 51 Yes
LOM ver LOMANDRA 'Verday' 140mm 16 Native
ROS pro ROSEMARINUS officianallis 'Prostratus' -
Prostrate Rosemary 140mm 2 Edible herb
VIO hed VIOLA hederacea Tubes 66 Yes, 375mm O.C.
TURF ZOYSIA 'Empire' Rolls
'A' Grade, healthy, weed and pest free
Total plants = 304
Total native plants = 234 or 77%
Total non-native plants = 66 or 22%
Total food source plants = 4 or 1%
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 23104 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 2 Jan Street, Noosa Heads, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD2 Finishes and Planting Schedules E: [email protected]
16.12.23 A For Application BB BB
Sheet Title Sheet 2 of 5 Client: qldBUILT Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 3
Determining the Radius of the TPZ (Tree Protection Zone)
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required)
· TPZ = DBH X 12
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m
· Variations and encroachments to the TPZ in accordance with A.S. 4970-2009
Fluorescent orange 5.5k.g
barrier fencing mesh secured
/ tied 100mm below top of star Plant pit 2x width of respective pot.
Measurement pickets at 300mm centres STREET TREE PLANTING DETAIL PLAN Scarify all pit walls and bottom, typ.
2x pot Ø Shrub / groundcover / tufty
taken for DBH grass plant species per plan
Yellow plastic capped Pot Ø
Fencing
star pickets
painted yellow Backfill plant pit with specified 100mm deep and settled organic
Vegetation to 1200mm
1.4m
50mm x 150mm H4 F14 hardwood timber topsoil, avoid compaction, typ. mulch as specified, keep minimum
be protected
Topsoil with mulch edge, refer detail, typical 50mm from plant stem. Form shallow
Ground line above - mulch to back Fix edging with 3x F14 hardwood dish drain to base of plant, typ.
Crown DBH Garden topsoil as specified,
600mm of kerb, typical 50mm x 25mm x 450mm stakes, with 2x
TPZ avoid compaction, typ.
Rootball galvanised nails to fix stakes to edging, typical
1800
NOTES: Street tree,
refer detail below 100mm, typ.
· Protective fencing to be installed around the TPZ to the commencement of any site works
· Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with Slow release fertiliser as specified.
'Figure 8' hessian tree tie, typical
A.S.1319. 2x rootball depth, typ. Use phosphorus free tablets for
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots Hardwood stakes (2), see section set parallel Banksia, Callistemon and Grevillea
KERB INVERT
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project to road, typical species.
Arborist in accordance with A.S.4970-2009 150mm, typ. 150mm deep cultivated
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land subgrade, typ.
ROAD
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by
appropriate use of herbicide 2x hot dipped galvanised triple grip screw to fix Existing subgrade, typ.
· TPZs to be monitored, inspected and certified by the project Arborist mitred timber edging together, typical
· Removal of tree protection measures at practical completion or as indicated by the project Arborist
NOTES:
1 Tree and Vegetation Protection Detail N.T.S.
Extent of tree pit excavation to be 1800mm x 1800mm in area, minimum (subject to footpath location). Remove all excavated fill off-site.
Place tree, 1000mm from back of kerb, or between kerb and footpath as applicable. 6 Potted Shrub, Groundcover Planting
LD3 Garden areas to extend from back kerb to footpath, typ. LD3 Typical Section Detail
Typical Detail Edging to extend to footpaths where applicable with street tree centrally located within garden (allowing for services setbacks), refer to
N.T.S.
plans for path locations.
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Full and even crown, typical
Notes
2 - 50mm x 50mm x 2400mm F14 hardwood
· Refer to architect's plans for planter wall heights/widths/materials and podium planter bed widths.
centrally pointed non-treated stakes (shown
· Refer to hydraulic engineer's plans for planter drainage and irrigation designs, and sealing.
perpendicular to kerb for graphic clarity only)
· Refer to irrigation designer's plans for irrigation system design.
50mm wide hessian tree ties to be driven vertically into ground outside of the
· Water proofing and independent certification of water proof membrane by others.
wrapped loosely around trunk, rootball and shall have a finished height lower
· Refer to Finishes Schedule for product specifications and Planting Schedule for plant selections.
then a figure 8 and secured to than the tree's lower lateral limbs
stake with galvanised nails or Form shallow saucer shaped depression
staples. Position tree tie between
around base of plant and keep mulch 50mm Plant per plan and Plan Schedule
1/3 to 1/2 overall height of tree.
from trunk base
Drip irrigation emitter and tube
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect Slotted inspection grate, do not glue
water to fall down edges of plant pit.
Mulch as specified, 100mm deep settled, 50mm from plant stem, typ.
Turf as specified Turf as specified 100mmØ uPVC slotted drainage / inspection pipe - 1m from tree rootball, typ.
Timber Edge Detail 1 - LD3 1) Planter wall, typ.
150mm Topsoil as specified
2) Waterproofing as specified to all interior planter wall surfaces, typ.
Metal Edging as specified 3) Protection board as specified
600
Tree pit to be excavated to nominal depth of 4) Geo-textile membrane as specified
600mm. Backfill hole with 100% friable Drainage cell as specified
100mm mulch as specified ameliorated site topsoil firming progressively.
50mmØ pvc drip irrigation conduit
Tapered Edging Stake as specified All excavated fill to be removed off site. Scarify
Slow release fertilizer all sides of plant pit, typical.
300mm Topsoil as specified as specified Proprietary podium drainage unit and carry-off pipe by builder
150mm cultivated subgrade, typ. 150mm cultivated subgrade 100mm deep uniform gravel layer. Provide Podium slab bottom to slope minimum 3% to low point, typ.
Existing subgrade and pit walls clean connection to road drainage as advised Podium soil as specified
on site by civil engineer.
2 Metal Garden Edge N.T.S. 4 Street Tree Planting - Timber Edges 1:30 7 Podium Planter 1:30
LD3 Typical Detail LD3 Typical Section Detail LD3 Typical Section
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Timber Specification:
Unseasoned hardwood, Class 1 Select Grade F17, ACQ or Tanalith E minimum H4 treatment, Full and even crown, typical
with one coat of timber coating.
2 - 50mm x 50mm x 2400mm F14 hardwood
Galvanised timber centrally pointed non-treated stakes to be
fixing screws, typ. driven vertically into ground outside of the
50mm wide hessian tree ties rootball and shall have a finished height lower
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression 600mm
staples. Position tree tie between typical
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
ELEVATION
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect
water to fall down edges of plant pit. Varies,
1200mm, maximum refer
Turf as specified Plans
PLAN
150mm x 50 mm timber edging 50mm x 25mm x 450mm Tree pit to be excavated to nominal depth of
hardwood peg 600mm. Backfill hole with 100% friable
20mm @1200mm centres Slow release fertilizer ameliorated site topsoil firming progressively.
Turf as specified as specified All excavated fill to be removed off site. Scarify
Mulch as specified
all sides of plant pit, typical.
2x hot dipped galvanised
triple grip screw to fix mitred
100mm deep uniform gravel layer. Provide
timber edging together,
clean connection to road drainage as advised
typical.
on site by civil engineer. Road
SECTION Back of kerb or hardstand Turf Roll, typical
3 Hardwood Treated Garden Edge N.T.S. 5 Tree Planting - in Garden or Turf 1:30 8 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 23104 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 2 Jan Street, Noosa Heads, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
All dimensions in millimetres unless noted otherwise.
LD3 Details E: [email protected]
16.12.23 A For Application BB BB
Sheet Title Sheet 3 of 5 Client: qldBUILT Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 4
Planting Plan Legend Detail
Overhead Electric Service
Refer to plans by others to confirm locations and
E
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
1 BAN int T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Jan Stre
1 CAL vim et Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
1 ACR imp
Stormwater
SW
Refer to plans, confirm existing locations and
TE
locate on-site prior to commencing works
TE
TE
TE
Existing Vegetation to Remain 1
TE
Refer to Detail
TE LD3
TE
TE
TE
1 Tree Protection Fencing 1
FT
TE
Refer to Specifications, Detail LD3
Garden Steppers
· Refer to Specifications and Finishes Schedule
Gravel Mulch
Refer to Specifications, Finishes Schedule, Details
STE
·
2 LOM lit Steel Garden Edge 2
6 LOM ver
STE
E
ST
STE
Refer to Specifications, Detail LD3
7 GRE coo 9 GRE coo
venue
2 LOM ver
1 CIT eur 1 CIT lim 3
3 BAN obl Timber Garden Edge
5 BAN obl 17 CIS rho TE Refer to Specifications, Detail
10 HEL jam 4 COR rub LD3
A
6 HEL jam
17 CIS rho
2 BAL tet Street Trees 3, 4
Banksia
4 LOM ver Refer to Specifications, Plant Schedule, Detail(s) LD3
2 COR rub 16 LOM lit 4 LOM ver 8 LOM lit
10 HEL sas
8 CAS gla 6 HEL fus
Trees 5
Unit A Refer to Specifications, Plant Schedule, Detail(s)
LD3
·
7 CAS gla 4 CAS gla
5 JUN usi Shrubs, Climbers / Vines 6, 7
9 JUN usi 2 ALP cae
·
Unit B Refer to Specifications, Plant Schedule, Detail LD3
2 BAN rob 7 SYZ san
26 VIO hed 2 ALP cae
15
RP90014 Groundcovers 6, 7
11 SYZ san Refer to Specifications, Plant Schedule, Detail LD3
40 VIO hed
25 LOM lit
Turf 8
Refer to Specifications, Plant Schedule, Detail LD3
· 2 BAC myr
11 JUN usi
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
Scale in metres PLAN NOTES:
See Sheet LD2 for Schedules
Contour Interval: 500mm (existing)
0 1 2 5 10 NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 23104 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 2 Jan Street, Noosa Heads, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services Do not scale from PDF plans. M: +614 7705 5222
(underground and overhead) from the responsible authority All dimensions in millimetres unless noted otherwise.
LP1 Planting Plan - Ground Floor E: [email protected]
16.12.23 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 4 of 5 Client: qldBUILT Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Page 5
Planting Plan Legend Detail
Overhead Electric Service
Refer to plans by others to confirm locations and
E
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Jan Stre
et Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
Existing Vegetation to Remain 1
Refer to Detail
LD3
1 Tree Protection Fencing 1
FT Refer to Specifications, Detail LD3
Garden Steppers
Refer to Specifications and Finishes Schedule
Gravel Mulch
Refer to Specifications, Finishes Schedule, Details
Steel Garden Edge 2
E
ST Refer to Specifications, Detail LD3
Avenue
Timber Garden Edge 3
TE Refer to Specifications, Detail
LD3
Street Trees 3, 4
Banksia
2 ROS pro Refer to Specifications, Plant Schedule, Detail(s) LD3
Trees 5
Refer to Specifications, Plant Schedule, Detail(s)
LD3
DN
Shrubs, Climbers / Vines 6, 7
Refer to Specifications, Plant Schedule, Detail LD3
6, 7
DN
Groundcovers
Refer to Specifications, Plant Schedule, Detail LD3
Turf 8
Refer to Specifications, Plant Schedule, Detail LD3
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
Scale in metres PLAN NOTES:
See Sheet LD2 for Schedules
Contour Interval: 500mm (existing)
0 1 2 5 10 NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 23104 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 2 Jan Street, Noosa Heads, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services Do not scale from PDF plans. M: +614 7705 5222
(underground and overhead) from the responsible authority All dimensions in millimetres unless noted otherwise.
LP2 Planting Plan - First Floor E: [email protected]
16.12.23 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 5 of 5 Client: qldBUILT Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Used in these records
Apdx 2 - Landscape Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.