Text Figure 2: Footing depth required to prevent undermining
Site drainage should be designed to readily remove surface water and to prevent ponding of water on
subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction
is completed.
If any soil conditions encountered during construction are found to differ from those noted above, Tectonic
should be notified immediately and an inspection carried out to determine if changes to footing design are
required.
Your attention is drawn to the attached document, Limitations.
Please contact the undersigned if you have any questions regarding this letter.
Yours faithfully,
TECTONIC GEOTECHNICAL PTY LTD
Michael Cocks BEng (Civil/Geotechnical) NER RPEQ 27540
Senior Geotechnical Engineer
Attachments: Figure 1
Borehole & DCP Reports & Explanatory Notes
Limitations
3/3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20220109 - 21236-002-Rev0 Maher Tce.pdfRelated documentApplication case desk ↗
20220109 - 21 Maher Tce, Sunshine Beach - Construction of Detached Dwelling and Swimming Pool - 21236-002-Rev0 Maher Tce.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.