2. APPLICATION BACKGROUND
2.1 Application Process
The application was lodged on 29 September 2025, and an Information Request was issued on 14
October 2025. The request required further information regarding plan detail, building design,
landscaping, car parking, waste collection, access, and earthworks.
Further items for clarification were sought and sent via email on 25 November 2025, relating to the
Lake Macdonald Drive elevation, parking spaces with persons with disability and discrepancies
between plans.
All items have since been appropriately addressed and further discussed below.
2.2 Funding Arrangement and Security in Perpetuity
The applicant has advised:
The project is subject to a Capital Funding Agreement (CFA) with the Queensland
Government Department of Housing. The CFA commits the project to Social Housing in
perpetuity, with a State mortgage over the land.
As social housing owned by a Registered Community Housing Provider (RCHP), the
dwellings will be registered as Community Housing Assets under the Housing Act 2003 (Qld)
and will be subject to regulatory requirements under the National Regulatory System for
Document Set ID: 24496425
Version: 5, Version Date: 29/01/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Report - MCU25 0118 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.