2016-02-02 Planning & Organisation Committee Agenda

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                          AGENDA


   Planning & Organisation
     Committee Meeting


              Tuesday, 2 February 2016


                    commencing at 1.30pm
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Noel Playford, Tony Wellington, Frank Wilkie




    “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2016-02-02 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 80 sections

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA          2 FEBRUARY 2016


TABLE OF CONTENTS

ITEM                                                                       PAGE

ATTENDANCE & APOLOGIES                                                          -

PRESENTATIONS                                                                   -

PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                   3

Planning & Environment                                                         3

1      PLANNING & ENVIRONMENT COURT APPEAL 2/16 FOR A MATERIAL CHANGE
       OF USE FOR ANIMAL HUSBANDRY TYPE 2 (INTENSIVE POULTRY FARM) AND
       ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY FARMING)
       SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184                  3

2      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE -
       ENTERTAINMENT & DINING BUSINESS TYPE 1 - FOOD & BEVERAGES
       SITUATED AT 2 BOTTLEBRUSH AVENUE, NOOSA HEADS - MCU 15/0086              6

3      WATERWAYS MONITORING IN THE NOOSA SHIRE                                18

4      PROPOSED AUDIT OF ADVERTISING SIGNAGE                                  33

CORPORATE SERVICES DEPARTMENT REPORTS                                         40

5      CORPORATE SERVICES DEPARTMENT UPDATE - 2ND QUARTER 2015/16             40

6      2015-16 NATIONAL COMPETITION POLICY REFORM APPLICATION                 45

7      WASTE MANAGEMENT BUSINESS ACTIVITY PUBLIC BENEFIT ASSESSMENT           48

Revenue Services                                                              50

8      JANUARY 2016 RATE LEVY                                                 50

EXECUTIVE OFFICE REPORTS                                                      54

9      EXECUTIVE OFFICE DEPARTMENT UPDATE - 2ND QUARTER 2015/16               54

10     OPERATIONAL PLAN PROGRESS REPORT -2ND QUARTER 2015-16                  62

Economic Development                                                          75

11     LOCAL ECONOMIC PLAN IMPLEMENTATION PLAN                                75

CLOSED SESSION                                                            -




                                                                     Page 2 of 81

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         2 FEBRUARY 2016


PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

Planning & Environment
1                       PLANNING & ENVIRONMENT COURT APPEAL 2/16 FOR A MATERIAL CHANGE
                        OF USE FOR ANIMAL HUSBANDRY TYPE 2 (INTENSIVE POULTRY FARM) AND
                        ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY FARMING)
                        SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184
OCUMENT INFORM AT ION




Author                          Planning and Environment Manager, Kerri Coyle
                                Planning & Infrastructure Department

Index                           ECM / Application / MCU12/0184

Attachments                     Nil



         APPLICATION DETAILS

         Applicant                         W Donald Milligan Pty Ltd

         Proposal                          Development Permit for Material Change of Use for Animal
                                           Husbandry Type 2 (Intensive Poultry Farm); and
                                           Environmentally Relevant Activity (ERA 4 - Poultry Farming)

         Appeal Filed                      04/01/2016

         PROPERTY DETAILS

         Property Address                  136 Top Forestry Rd, Ridgewood

         RP Description                    Lot 21 SP 226606

         Land Area                         105.017ha

         Existing Use of Land              Avocado orchard, associated sheds and detached house

         STATUTORY DETAILS

         SEQRP Designation                 Regional Landscape and Rural Production

         Locality                          Mary River Catchment

         Zone                              Rural

         Assessment Type                   Impact


RECOMMENDATION
That Council note the report by the Planning & Environment Manager to the Planning &
Organisation Committee Meeting dated 2 February 2016, regarding Planning & Environment
Court Appeal 2/16 and agree to defend the appeal.



                                                                                                    Page 3 of 81

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         2 FEBRUARY 2016


REPORT
A report on the development application for Material Change of Use for a Development
Permit for Material Change of Use for Animal Husbandry Type 2 (Intensive Poultry Farm)
and Environmentally Relevant Activity (ERA 4 - Poultry Farming) situated at 136 Top
Forestry Road, Ridgewood was considered at its Ordinary Meeting on 19 November 2015.
Council resolved to refuse the application on a number of grounds.
The applicant lodged an appeal with the Planning and Environment Court on the 4 January
2016.
The appeal seeks the Court approve the application, subject to lawful conditions.

On the 11 January 2016, The Department of Transport and Main Roads acting as
concurrence agency to the original application advised that the Department will not be
joining the appeal.

On the 20 January 2016, three properly made submitters to the development application
advised that they elect to join the appeal as co-respondents.

It is in order for Council to defend the appeal and the recommendation is worded
accordingly.

Previous Council Consideration
Ordinary Meeting 19 November 2015, Item 1, Page 14
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 10 November 2015 regarding Application No. MCU12/0184 for a
Development Permit for Material Change of Use for Animal Husbandry Type 2 (Intensive
Poultry Farm) and Environmentally Relevant Activity (ERA 4 - Poultry Farming) situated at
136 Top Forestry Road, Ridgewood and refuse the application for the following reasons:
1.   The proposed poultry farm does not comply with the Overall Outcomes of The Noosa
     Plan’s Mary River Catchment Locality, Agricultural Uses and Transport, Roads and
     Drainage Codes;
2.   The proposed poultry farm does not achieve sufficient separation distance from
     surrounding residences and properties, so as to avoid adverse odour impacts on
     amenity;
3.   The odour modelling carried out by the applicant does not provide sufficient assurance
     that nearby residents will not be adversely impacted by odour;
4.   The proposal will result in actual and perceived loss of amenity to nearby residents;
5.   Traffic generated by the development will have significant adverse impacts on the
     existing road network and on the amenity of residents living along the haul route, as
     the route traverses Cooroy’s residential streets and bird collection will occur during
     normal sleeping hours;
6.   The proposed sheds and earthworks necessary for shed construction are likely to
     adversely impact on the scenic amenity of the area, as the applicant has not
     demonstrated that they will integrate satisfactorily with the landform and landscape;
7.   It has not been clearly demonstrated that the proposed poultry farm will not generate
     unacceptable levels of dust, other particulates and ammonia that may impact on the
     amenity of nearby residents and/or have adverse environmental outcomes.




                                                                                     Page 4 of 81

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               2 FEBRUARY 2016


Finance & Risk

There will be significant costs for Council involved in defending the appeal however it is
premature to advise on the appeal prospects at this stage.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Departments/Sections Consulted:

      Community Services                   X   Planning & Infrastructure
      Disaster Management & Public Order       Building & Plumbing Services
      Waste & Environmental Health         X   DA Planning
      Community Facilities                     Strategic Land Use Planning
      Cultural Facilities                      Asset Design & Investigations
                                               Asset Planning
                                               Civil Operations
                                               Environment

      Executive Office                         Corporate Services
      Community Engagement                     Finance
      Customer Service                         ICT
      Executive Support                        Procurement & Fleet
      Governance                               Property & Facilities
      Human Resources                          Revenue Services




                                                                                       Page 5 of 81

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           2 FEBRUARY 2016


2       DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE -
        ENTERTAINMENT & DINING BUSINESS TYPE 1 - FOOD & BEVERAGES
        SITUATED AT 2 BOTTLEBRUSH AVENUE, NOOSA HEADS - MCU 15/0086

Author              Coordinator Planning Assessment, Denis Wallace
                    Planning & Infrastructure Department

Index               ECM / Application / MCU15/0086

Attachments         Nil


 APPLICATION DETAILS

 Applicant                     Village Bicycle

 Proposal                      Development Permit for Material Change of Use - Entertainment &
                               Dining Business Type 1 - Food & Beverages

 Properly Made Date            15/10/2015

 Information Request Date      9/11/2015

 Information Response Date     14/12/2015

 Decision Due Date             11/02/2016

 Number of Submissions         Not Applicable

 PROPERTY DETAILS

 Property Address              2 Bottlebrush Ave NOOSA HEADS QLD 4567

 RP Description                Lot 157 RP 88772
                                      2
 Land Area                     546m

 Existing Use of Land          Office/Retail

 STATUTORY DETAILS

 SEQRP Designation             Urban Footprint

 Locality                      Noosa Heads

 Zone                          Business Centre

 Overlays                      Nil

 Assessment Type               Code



RECOMMENDATION
That Council note the report by the Coordinator Planning Assessment to the Planning &
Organisation Committee Meeting dated 2 February 2016 regarding Application No.
MCU15/0086 for a Development Permit for Material Change of Use for Entertainment &
Dining Business Type 1 – Food & Beverages situated at 2 Bottlebrush Avenue, Noosa
Heads and approve the application in accordance with the following conditions:




                                                                                      Page 6 of 81

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


PLANNING
      When Conditions Must be Complied With
1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
      prior to the use commencing, and then compliance maintained at all times while the
      use continues.
      Approved Plan
2.    Development undertaken in accordance with this approval must generally comply with
      the approved plan of development. The approved plan is listed in the following table
      and may be further amended by these conditions.
       Plan No.     Rev.    Plan/Document Name                                Date
       A0             -     SITE PLAN                                         October 2015

      Nature and Extent of Approved Use
3.    The approved use must not operate outside the hours of 5am to 12pm, with use of
      outdoor dining area permitted after 10pm only on Friday and Saturday nights.
4.    Patrons in the outdoor dining area must be seated and limited to 50.
5.    The outdoor dining areas within the site must be in accordance with those shown on
      the approved plan, with no more than 40m2 used at any one time.
6.    Service vehicle movements associated with the approved use (including loading and
      unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday and
      not at all on Sundays or public holidays.
      Noise
7.    External speakers or amplified music are not permitted.
8.    Internal amplified music must be directed away from the Bottlebrush Avenue frontage.
9.    Refuse disposal, particularly glass bottles and the like, must be considerate of noise at
      all times.
10.   Management must ensure patrons leave the premises and street frontage promptly
      after nightly closing time and do not mingle or otherwise cause noise nuisance to
      residents on Bottlebrush Avenue.
11.   The development must be undertaken in accordance with the recommendations of the
      Acoustic Report prepared by ATP Consulting Engineers (Reference ATP150314-NIA-
      02) dated 24 June 2015 and ATP’s addendum letters dated 9 October 2015 and 10
      December 2015.
12.   The 2.6m acoustic fence recommended by the approved Acoustic Report must be
      erected within 3 months of this approval taking effect. The fence must meet the
      construction standards required by the approved Acoustic Report.
13.   Noise emissions from any new mechanical equipment associated with the
      development shall comply with the following requirements:
      13.1. Air-conditioning and Refrigeration
            7am to 10pm: Background + 5dB(A)
            10pm to 7am: Background + 3dB(A)




                                                                                      Page 7 of 81

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              2 FEBRUARY 2016


14.   Written certification must be submitted from a suitably qualified person confirming
      noise levels from any new mechanical equipment comply when measured at either the
      residential boundary or outside the most exposed part of an affected building,
      whichever is the closest to the equipment.
      The assessment and certification is required immediately after installation of the
      equipment and in a format approved by Council. All equipment should be operating at
      the same time to test the overall noise level created.
      Advice: It is highly recommended the person you engage to certify the installation is involved
      prior to installation of any equipment so they can recommend where equipment is best located.
      They can also advise about noise enclosures and make other suggestions to avoid noise
      problems. It is a lot more costly to try and deal with noise problems after installation.
      Landscaping
15.   Dense native screening shrubs up to 3m in height must be established on the
      Bottlebrush Avenue side of the new acoustic fence for its full length to visually screen
      the fence.
      Refuse
16.   Refuse containers must be provided in accordance with the requirements of the
      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
      Regulation 2000, for the storage and collection of refuse.


REPORT
1.    PROPOSAL
The application seeks development approval for a Material Change of Use of Premises for
an Entertainment & Dining Business - Type 1 Food & Beverages at 2 Bottlebrush Avenue,
Noosa Heads. The proposal seeks to ratify the use of outdoor dining areas currently being
used in front of the Village Bicycle and Bean Drop businesses. The food and beverages
business use of the existing internal tenancies can occur as-of-right, subject to self-
assessable provisions under The Noosa Plan. However, addition of new outdoor dining
areas triggers a code assessable development application.

The proposed outdoor dining areas comprise:
   A 40m2 L-shaped area around the front and side wall of Village Bicycle
   An 18m2 area in front of Bean Drop Cafe

The applicant indicates the businesses operate during the following hours:
   Bean Drop Café 5am – 2pm
   Village Bicycle 2pm – 12pm

The proposal plan shows a portion of shared outdoor dining area in front of the Village
Bicycle to be used at varying times, with no more than 40m2 to be used at any one time.
The proposal plan and site photographs are included as Figures 1–5 below. The application
is before Council due to noise concerns raised by neighbours.




                                                                                          Page 8 of 81

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA        2 FEBRUARY 2016




                        Figure 1 – Proposal Plan




                     Figure 2 – Proposal Plan Extract



                                                                Page 9 of 81

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA              2 FEBRUARY 2016




                          Figure 3 – Street View




                 Figure 4 – Village Bicycle Site Photograph




                                                                     Page 10 of 81

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         2 FEBRUARY 2016




       Figure 5 – Village Bicycle Outdoor Area Adjacent to Bottlebrush Ave frontage
                               (looking toward Noosa Drive)

2.   SITE DETAILS
2.1. Background
A Town Planning Consent was issued in 1976 for the use of the site as offices (TPC 578).

The Noosa Plan allows for shops, offices and restaurants to establish within existing
buildings within the Business Centre zone, subject to self assessment. Bean Drop cafe has
been operating from the site for 4 years and Village Bicycle opened in April 2014.

Discussions with the Village Bicycle owners indicate they sought verbal planning advice
about the requirements for changing the use of the existing office premises to food and
beverages prior to establishing but did not advise Council staff of the intention to add new
outdoor dining areas.

The Village Bicycle is a licensed premises and sought changes to its liquor license through
the State Office of Liquor & Gaming Regulation (OLGR) in July 2015 to allow patrons to
stand and vary the amplified entertainment restrictions. The OLGR sought Council’s advice
in relation to the change and Council officers objected on the basis the use of the outdoor
areas was occurring without a development permit. The current application has been lodged
in response.

The changes sought by the applicant to its liquor licence are understood to have originated
from compliance action undertaken by the OLGR in response to noise complaints from an
adjacent resident. OLGR officers have since attended site on a number of occasions to
monitor compliance with its liquor licence conditions, including requirements for patrons to
be seated when outside and on site noise limits. The complainant to OLGR and two other
adjacent unit residents/owners have written to Council about the application asking for noise
to be addressed with this application.


                                                                                   Page 11 of 81

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         2 FEBRUARY 2016


2.2. Site Description
The site is located on the corner of Noosa Drive and Bottlebrush Avenue in Noosa Junction
and is within the Business Centre zone. The site slopes moderately down along its Noosa
Drive frontage toward the south. The site has been developed with an existing single-storey
commercial building of 3 tenancies, being Village Bicycle, Bean Drop and a Backpacker
Travel Agency.

The Village Bicycle tenancy is setback 4m from the Bottlebrush Avenue frontage and
approximately 3m below the existing road level. The site has been terraced to provide a
paved level area around most of the building’s frontage.

A locality and zoning plan of the site and surrounding area is shown in Figure 6 below.




                             Figure 6 – Locality & Zoning Plan
2.3. Surrounding Land Uses
Adjoining the site to the west along Noosa Drive are three small shop and restaurant
tenancies.
Adjoining the site to the south fronting Bottlebrush Avenue is the Noosa Central professional
offices.
Across the road to the east is the Nomads backpacker accommodation and the Koala Bar.
The property has n 1993 approval for a Motel and Hostel including a bar and restaurant –
TPC 2474.
Approximately 30m across the road to the north east are 12 townhouse units at No.1
Bottlebrush Avenue shown in Figure 6 below. Further detached houses and units are along
Bottlebrush Avenue to the southeast.



                                                                                   Page 12 of 81

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016




                      Figure 6 – Adjacent Bottlebrush Terraces Units
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions; and
   The Noosa Plan;
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
The site is located within the Urban Footprint Area of the SEQ Regional Plan. The proposed
use is consistent with the regional policies and regulatory provisions of the SEQ Regional
Plan.
3.3. Statutory Instruments – Planning Scheme
The site is located in the Noosa Heads Locality and is zoned Business Centre. The
proposed use is identified as a consistent use within the zone and is required to follow a
code assessable application process.
Land Use & Works Provisions
The following codes which regulate land use and design are applicable to this application:
    Noosa Heads Locality Code;
    Business Uses Code;
    Landscaping Code; and
    Engineering Works Codes
The application has been assessed against each of the above applicable codes. The
pertinent issues arising out of the assessment against the codes are discussed below:


                                                                                   Page 13 of 81

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             2 FEBRUARY 2016


Carparking and Use Areas
The Driveways and Parking Code calculates parking demand for food and beverage
businesses based on net use areas, exclusive of kitchens and the like. The proposal seeks
to maintain the development’s existing net use by limiting the use of the outdoor dining area
to 40m2 at any one time. This is considered reasonable and a condition is recommended
accordingly.
Noise
Noise is the critical aspect of the assessment. The introduction of outdoor dining areas on
the site introduces new noise sources with the potential to negatively impact on the amenity
of existing residences in Bottlebrush Avenue. In particular, the areas are within the line of
sight of some units in the adjacent Bottlebrush Terraces at 1 Bottlebrush Avenue and noise
complaints have been received from residents. Outcome O20 of the Business Uses Code
requires:
Development is designed and sited to avoid noise emissions that unreasonably diminish the
amenity of the area or surrounding uses.
The Noosa Heads Locality Code similarly seeks to protect the amenity of existing residents.
The applicant engaged acoustic consultants, ATP Consulting Engineers, to assess the
development’s noise impacts. The originally submitted Noise Impact Assessment report
material applied a maximum noise criteria at the nearest receiver at the Bottlebrush Terraces
of Background+5dB(A) and modelled marginal compliance with this limit based on the
construction of a 2.0m acoustic fence along the site’s Bottlebrush Avenue boundary.
Council planning and health officers had concerns with the potential for noise impacts under
the modelled scenario and requested the applicant provided further noise assessment
addressing:
      More stringent noise criteria of Background + 3dB(A) after 10pm;
      Use of more robust noise attenuation measures;
      Consideration of relocating some parts of the outdoor dining area.
The amended acoustic assessment resulted in the following noise criteria at sensitive
receivers:




The assumed evening and night-time background levels of 45dB(A) and 40dB(A) are
considered reasonable and appropriate for the location. They correlate with urban settings
having some traffic and commerce noise and are supported by the ATP’s background noise
recordings in the area.
ATP’s assessment notes the existing OLGR liquor licence applies the following enforceable
limit:
Noise emanating from the premises including amplified and non-amplified noise and patron
noise must not exceed 75dB(C), fast response, when measured approximately 3 metres
from the primary source of the noise.



                                                                                    Page 14 of 81

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             2 FEBRUARY 2016


ATP’s assessment finds both the OLGR criteria and the sensitive receiver criteria listed
above can be achieved provided the following measures are undertaken:
 Erection of a 2.6m high acoustic fence constructed of ship-lapped timber, fibre cement or
   similar;
 To ensure compliance with the day-time/evening (6am to 10pm) noise limit the
   instantaneous volume level in dB(A), at 3m from any of the speakers, must not exceed
   80dB(A);
 To ensure compliance with the night-time (10pm to 6am) noise limit the instantaneous
   volume level in dB(C), at 3m from any of the speakers, must not exceed 84dB(C) with bi-
   fold glass doors open.
 No speakers or live entertainers to be located outside of the building perimeter at any-
   time. The speakers shall always be located along the north-eastern wall facing in the
   south-westerly direction.
A 2.6m fence exceeds a standard 2m fence height limit but is considered acceptable in this
location, given the fence sits below the footpath, as shown below.




                    Figure 7 – Existing Timber Fence (Approx. 1.5m high)


Overall, the assessment of noise impacts for this development is vexed. The site is within
Noosa Junction’s Business Centre zone and is unique in having a primary frontage to Noosa
Drive and a secondary frontage to Bottlebrush Avenue. The Noosa Drive end of Noosa
Junction is increasingly becoming a focal point for food and beverage businesses that add to
the vitality of the area and serve an important function for both locals and tourists. While it is
desirable to see the vitality of Noosa Junction continue to increase, The Noosa Plan also
seeks to protect the amenity of existing residences. Future development of sites east along
Bottlebrush Drive could potentially raise major noise conflicts for residents opposite.
The submitted noise assessments indicate reasonable noise criteria can be achieved but are
based on modelled predictions and there is risk actual levels will exceed modelled levels.
Council asked the applicant to consider additional attenuation measures such as an acoustic
roof and wall to better enclose the outdoor area, as well as reduced business hours but the
applicant only proposed the acoustic fence and requests existing business hours be
maintained. In regard to business hours it submits:



                                                                                       Page 15 of 81

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


“Our current trading hours are 4pm-midnight Mon-Sat, and 12.30-midnight Sun. Our kitchen
is open every night to 11.30pm. We cater to a lot of the hospitality staff who work in Noosa
that don't usually finish work until after 10pm when most other kitchens in Noosa are closed
apart from McDonald's. We have worked very hard to establish late night dining, so to lose
this would be very detrimental to our business. We feel a restriction on our trading hours
would be slightly unfair considering other businesses within very close proximity are allowed
to trade until midnight (and beyond). It was always our goal to create a relaxed social
environment within our community and in our short time of trading have secured a rather
large local following. The majority of which are made up of local hospitality workers who
know they can have an after work drink with something to eat.”
Discussions with State Liquor Licencing officers indicate they consider the business location
to be problematic and currently causing unacceptable levels of patron noise for adjacent
residents.   They advise patron noise is pervasive late at night and difficult to
contain/manage. To date OLGR investigation and resolution of complaints about the Village
Bicycle remain unresolved and OLGR is awaiting the outcome of this application.
On balance, use of the outdoor area to midnight 7 days a week in this location is not
supported by Council officers because of the likely ongoing amenity impacts on residents.
Outdoor use to midnight is only recommended on Fridays and Saturdays, which is consistent
with The Noosa Plan’s provisions for the Visitor Mixed Used zoned areas along Gympie
Terrace and Hastings Street and provides residents with some respite.
Further noise management measures should comprise:
   Construction of the 2.6m high acoustic fence to the Bottlebrush Avenue.
   Planting of dense native shrubs to 3m high to screen the acoustic fence.
   External speakers or amplified music are not permitted.
   Internal amplified music to be directed away from the Bottlebrush Avenue frontage.
   Patrons in the outdoor use area to be seated and limited to 50 (per current seating).
Conditions are included in the recommendation accordingly.


4.   CONSULTATION

4.1. IDAS Referral Agencies
Not Applicable

4.2. Other Referrals
The application was forwarded to the following internal Council specialists:
   Environmental Health Officer

4.3. Public Notification
Not Applicable




                                                                                   Page 16 of 81

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   2 FEBRUARY 2016


5.     CONCLUSION
The application is for a consistent food and beverages use within the Business Centre zone
and triggers code assessment due to the addition of outdoor dining areas. The site’s
secondary frontage to Bottlebrush Avenue raises specific noise concerns and complaints
about patron noise have previously been received from adjacent residents in Bottlebrush
Avenue.

The noise assessment for this development is considered vexed. Food and beverages uses
add to the vitality of Noosa Junction and the area toward Noosa Drive increasingly supports
restaurant and bar businesses valued by locals and tourists. It is desirable to see the area
continue to revitalise, provided new uses respect the amenity of existing residents.

The applicant’s acoustic modelling indicates the development can comply with relatively
strict noise limits at the nearest residences via the construction of an acoustic fence and
other measures. However, the noise assessment is a modelled scenario only and patron
noise at licensed premises is known to be difficult to control. The current daily use of the
outdoor area to midnight is not considered appropriate in this location close to adjacent
residents and The Noosa Plan seeks to limit late night trading to Fridays and Saturdays in
similar circumstances within the Visitor Mixed Use zone. As such it is recommended use of
the outdoor area be limited to those two nights and the following noise management
measures be required:

     Construction of the 2.6m high acoustic fence to the Bottlebrush Avenue.
     Planting of dense native shrubs to 3m high to screen the acoustic fence.
     External speakers or amplified music not permitted.
     Internal amplified music to be directed away from the Bottlebrush Avenue frontage.
     Patrons to be seated in the outdoor dining area and limited to 50, per current seating
       numbers.

The application is recommended for approval, subject to conditions.

Departments/Sections Consulted:

     Chief Executive Officer                x   Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                            x   Waste & Environmental Health       Revenue Services

x    Executive Office                       x   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                             x   Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                               Page 17 of 81

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     2 FEBRUARY 2016


3                        WATERWAYS MONITORING IN THE NOOSA SHIRE
DOCUMENT INFORM AT ION




Author                           Environment Officer (Rivers and Coast) Jan Maddin
                                 Planning & Infrastructure Department

Index                            ECM / Waterways / Rivers / Lakes / Canals / Dams / Foreshore

Attachments                      1.   Details of current monitoring activities in the Noosa Shire
                                 2.   Map of river catchments in the Noosa LGA
                                 3.   Noosa River’s Environment Values & Water Quality Objectives
                                      (40 pages - provided separately to this agenda – 2 hard copies are
                                      available in the Councillors Room)
                                 4.   Mary River Environmental Values and Water Quality Objectives
                                      (37 pages - provided separately to this agenda – 2 hard copies are
                                      available in the Councillors Room)



EXECUTIVE SUMMARY
Waterways monitoring in the Noosa Shire provides support in meeting Council’s legislative
responsibilities. Under the Environment Protection Act 1994 and Sustainable Planning Act
2009, Council has the responsibility to protect the water quality of the Shire’s rivers, streams,
wetlands, lakes, aquifers, estuaries and coastal waters.

There are a number of waterways monitoring activities undertaken by Council, or on behalf
of Council, which contribute to the protection of the quality of natural waters in the Noosa
Shire. Although this occurs, population growth, changes in land use and industry
development across many sectors present ever increasing pressures affecting the resilience
of natural systems, particularly waterways.

Those pressures are outlined in this report together with some options for mitigation
measures, as well as emerging modelling technologies which can assist decision making
regarding future catchment management investment.

This report seeks to provide background and information about the current waterways
monitoring activities in the Noosa Shire, and to present future catchment management
recommendations which support healthy aquatic ecosystems and important human uses
such as drinking water, recreation, irrigation and aquaculture.


RECOMMENDATION
That Council note the report by the Environment Officer (Rivers and Coast) to the Planning
and Organisation Committee dated 2 February 2016 providing an overview of waterways
monitoring in the Noosa Shire.




                                                                                              Page 18 of 81

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


REPORT
The purpose of this report is to provide Council with an overview of the waterways
monitoring obligations and activities currently underway in the Noosa Shire.
In Queensland, the quality of natural waters is protected under the Environment Protection
(Water) Policy 2009. This policy achieves the object of the Environmental Protection Act
1994 (EP Act) to protect Queensland’s waters while supporting ecologically sustainable
development. This is a legislative responsibility of Council and is achieved primarily through
the management of land use and operational activities.
Waterways monitoring also provides information about the health of Noosa’s river
catchments, and helps Council manage the risk to public health from primary recreational
use of Noosa’s bathing reserves, particularly following rainfall events.
In addition, community-based waterways monitoring provides educational opportunities for
local residents and school students to learn more about their local creeks and rivers through
active participation in water quality testing and frog monitoring.
1.   Waterways monitoring in the Noosa Shire
The waterways related monitoring activities currently undertaken by Council or on behalf of
Council include:
   site specific monitoring relating to new residential developments;
   operational specific monitoring relating to the Eumundi Road landfill;
   project specific monitoring relating to dredging operations and other waterways related
     projects;
   annual inspections of businesses with an Environmentally Relevant Activity (ERA)
     licence;
   complaint-driven investigations of pollution incidents, particularly occurring via the
     stormwater network;
   seasonal monitoring of Noosa’s bathing reserves for microbial pollution;
   annual ecosystem health assessments of the Noosa River catchment, lakes and
     estuary;
   monthly Waterwatch monitoring of the Noosa and Mary River catchments;
   seagrass and mangrove monitoring; and
   frog (threatened species) monitoring.
In 2012 a monitoring investigation of Lake Cootharaba’s high nitrogen concentrations was
also undertaken, which was flagged as a result of the annual ecosystem health assessments
of the Noosa River catchment.
For more details regarding these monitoring activities refer to Attachment 1.
2.   How the quality of natural waters is protected
The natural waters of the Noosa Shire include the Noosa River catchment, lakes and estuary
which cover 63% of the Shire; some tributaries of the Mary River catchment which cover
36% of the Shire; and minor tributaries of the Maroochy River catchment which cover 1% of
the Shire (refer Attachment 2).
For these natural waters of the Shire, a suite of Environmental Values (EVs) and Water
Quality Objectives (WQOs) have been established under the Environment Protection
(Water) Policy by the State Government in consultation with local communities (refer
Attachments 3 and 4).
EVs set out the qualities that make natural waters suitable for supporting aquatic
ecosystems and human uses such as drinking water, recreation, irrigation and aquaculture.




                                                                                   Page 19 of 81

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        2 FEBRUARY 2016


These EVs need to be protected from the effects of habitat alteration, waste releases,
contaminated runoff and changed flows to ensure that aquatic ecosystems remain healthy
and waterways are safe for community use
The WQOs are long-term goals for water quality management. They are technically-derived
numbers, measures or narrative statements regarding particular indicators of water quality,
such as:
   physical indicators of water quality (e.g. turbidity, suspended sediment, temperature)
   chemical indicators (e.g. nitrogen, phosphorus);
   biological indicators (e.g. macro invertebrates, fish);
   pathogens; and
   measures of waterway condition (e.g. erosion, riparian vegetation extent and
     condition).
The WQOs are used to assess whether the EVs are being maintained. They apply to
receiving waters such as rivers, streams, wetlands, lakes, aquifers, estuaries and coastal
waters and are not end-of-pipe objectives.
(Source: Department of Environment and Heritage Protection, Environmental values and
water quality objectives under the Environmental Protection (Water) Policy 2009 fact sheet).
EVs and WQOs provide government, industry and other groups with a single set of agreed
water quality targets for statutory and non-statutory planning and water quality management.
These EVs and WQOs support current and planned future investments by government,
industry and the community in built and natural environments, and meet the increasing
public expectation that governments will protect the State’s waterways from pollution and
minimise the environmental, economic and social risks (including public health) associated
with documented declines in water quality across Queensland.
Figure 1 below provides an overview of linkages between EVs and WQOs and
planning/development assessment activities for a selection of statutory and non-statutory
categories of use.




.



                                                                                  Page 20 of 81

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                       2 FEBRUARY 2016


     Statutory activities
   Point source emissions – under the EP Act, activities with the potential to release
     contaminants into the environment are referred to as environmentally relevant
     activities (ERAs). These often involve a discharge or outflow from an identifiable
     location due to industrial or intensive agricultural activities such as chemical
     manufacturing, cement manufacturing, poultry farming, sewage treatment etc.
   Urban diffuse emissions – under the Sustainable Planning Act 2009, State interest
     regarding water quality seeks to ensure EVs and WQOs are protected and enhanced
     by:
      Integrating the State interest regarding water quality into planning schemes.
      Requiring urban development (e.g. residential, commercial and industrial) be
        located, designed, constructed and/or managed in ways that avoid/minimise
        water quality impacts.
      Adopting applicable stormwater management design objectives relevant to the
        climatic region and demonstrating current best practice environmental
        management.
      Supporting local governments in developing innovative and locally appropriate
        solutions for urban stormwater management.
      Addressing impacts on EVs and WQOs in water supply catchments.
     Non-statutory activities
   Rural activities (i.e. rural diffuse emissions) – under the Environment Protection
     (Water) Policy, governments and communities pursue adoption of Best Management
     Practices (BMP) for rural activities to improve rural land management. This approach
     covers a wide range of farm management and production issues, with soil health,
     grazing land management and use of fertilisers and chemicals directly relevant to
     water quality improvement. In some instances producers and industry organisations
     (e.g. AgForce) who adopt BMPs are supported through extension and education
     programs.
   Other non-statutory activities – supported under the Environment Protection (Water)
     Policy include:
      Development of regional natural resource management plans and healthy waters
        management plans to guide and prioritise investment in works to protect EVs
        and WQOs.
      Water quality monitoring and aquatic ecosystem report card programs which
        provide a benchmark against which water quality health can be compared.
      Commitments to the Reef Water Quality Protection Plan 2013 which set regional
        and subregional water quality and management action targets.

3.   Are we doing enough to protect EVs and WQOs?
The 2015 Healthy Waterways Report Card highlighted that since monitoring of South East
Queensland’s waterways began in 2000, reducing point source emissions (i.e. nutrients) had
been a key focus.
Over the intervening years, point source emissions have improved significantly and are now
a reduced pressure on SEQs natural waters that continue to be managed. This reduction in
emissions can be directly attributed to the upgrade of Sewage Treatment Plants (STP) in
many local government areas. These upgrades have reduced nutrients and improved the
quality of treated effluent discharged to natural waters.



                                                                                Page 21 of 81

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


On the downside, Healthy Waterways, which is an independent not for profit organisation
based in south-east Queensland, state that the increasing amount of mud (i.e. sediment) in
waters has now become a critical issue across South East Queensland waters.

Statutory responsibilities

In the Noosa Shire, statutory management responsibilities to protect EVs and WQOs still
focus on point source emissions, as well as urban diffuse emissions. These include:
   ensuring the Eumundi Road landfill is compliant with its ERA licence conditions;
   ensuring other ERA licenced businesses are compliant;
   ensuring dredging operations and other waterways related projects are compliant with
     State approvals and conditions;
   ensuring the quality of stormwater quality leaving new residential developments is the
     best it can be; and
   investigating complaints relating to pollution incidents, particularly occurring via the
     stormwater network.

Could more be done?

Business activities and individual practices

Council currently undertakes annual inspections of nine ERA licensed businesses across the
Shire to ensure compliance with their licence conditions. These include three boat
maintenance and repair businesses, one metal recovery business, one surface coating
business and four plastic product manufacturing businesses.

Prior to the State Government’s introduction of the Green Tape Reduction Act 2012, Council
undertook inspections of 128 ERA licensed businesses in the Shire. The subsequent
reductions in licenced businesses mean that many no longer need to hold an environmental
authority with Council, although they still need to comply with the standards. As a result, in
most cases whilst Council is still responsible for investigating pollution incidents and
environmental nuisances, these are complaint driven.

One option for consideration therefore, may be to consider establishing an inspection
programme to check compliance of the now non-ERA licensed businesses. This could be
achieved through prioritisation of existing resources. These businesses formerly had the
potential to release contaminants to the environment which could impact on the EVs and
WQOs of the Shire’s natural waters. Examples of these non-ERA businesses include:
   asphalt manufacturing (< 1000 tonnes/yr);
   concrete batching;
   chemical storage;
   boilermaking or engineering;
   motor vehicle workshop operations; and
   wooden and laminated product manufacturing.

In addition there are a number of individual and/or business practices that release sediment
and other contaminants to receiving waters of the Shire, predominantly via the stormwater
network.


                                                                                   Page 22 of 81

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           2 FEBRUARY 2016


Examples of these practices include:
   sediment runoff from building sites due to lack of erosion and sediment controls;
   car washes (runoff of hydrocarbons and cleaning substances);
   back washing of pools and spas (chemical releases);
   cleaning and painting roofs (runoff of paint and cleaning substances); and
   littering (including cigarette butts) particularly around commercial areas.

Without compliance monitoring of these types of business activities and practices it is
feasible to consider they may be releasing contaminants which are likely to impact on the
EVs of the Shire’s natural waters. These impacts may over time be cumulative and
significant.

Compliance monitoring of these activities can be achieved through prioritisation of existing
resources.

New residential developments

With regard to stormwater quality leaving new residential developments, over the past 5
years ‘bio retention basins’ have become the most common stormwater quality treatment
device installed in new residential developments.

These bio basins are considered best practice and are a hybrid engineered and vegetated
filtration device used to remove sediment, nutrients, and litter from urban stormwater runoff.

Bio basins do not remove all the additional pollutants generated by a development, but are
sized and selected to achieve the best cost to efficiency ratio.

This ratio is 80% reduction in total Suspended Solids, 45% reduction in Total Nitrogen, 60%
Reduction in Total Phosphorous and 100% reduction in Gross Pollutants (i.e. litter)
compared to if there were no bio basins incorporated into the development.

To perform effectively, bio basins must be maintained.

Earlier on in the year, Council agreed to a review of both Council-owned and privately-
owned bio basins with a focus on maintenance. This decision ensures there will be:
   ongoing compliance with development conditions that require bio basin maintenance;
   the quality of stormwater runoff from developments with bio basins is the best it can
     be; and
   the owners of bio basins are educated about their purpose and how to maintain them.

The bio basins review is now underway and approximately 25% of Council-owned bio basins
have been audited.

Existing urban areas

As opposed to new urban developments, within existing urban areas stormwater
infrastructures such as Gross Pollutant Traps (GPTs) were put in place long before bio
basins (or other Water Sensitive Urban Design (WSUD)) technologies existed.
These GPTs have been installed throughout the Shire in public and privately developed
areas.



                                                                                   Page 23 of 81

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


The purpose of GPTs is to intercept gross pollutants such as soil, silt, rubbish and leaves
before these contaminants make their way to the Shire’s receiving waters. A lack of
maintenance results in the trapped material flushing into the stormwater system.

These infrastructures may require an upgrade and/or an ongoing and regular maintenance
regime if they are to be effective.

The current annual program cost for scheduled GPT cleaning throughout the Shire is
$25,000. It is estimated that 80 tonnes of sediment is removed annually through this
process.

The current capital renewal program for stormwater assets is $550,000. These assets
consist of piped assets which include culverts, and structures which include pits, manholes,
field inlets / outlets, headwalls, Gross Pollutant Traps (GPTs) and other Water Sensitive
Design (WSUD) devices. The renewal program is based on condition assessments of these
stormwater assets and prioritises renewal activities as a result of asset failure and defect
detection.

In existing urban developments, there may be an opportunity to include in the capital
renewal program, upgrades to stormwater infrastructure (e.g. GPTs) based on risk to
receiving water quality, in addition to condition assessments.

It may also be possible to include stormwater infrastructure upgrades in the future
amendments of the Local Government Infrastructure Plan.

If achievable, these upgrades will potentially improve the ‘quality’ of stormwater runoff from
existing residential, commercial and industrial areas to receiving waters.

This approach may be supported by the State Government as ‘innovative and locally
appropriate solutions to urban stormwater management’ which mitigates urban diffuse
emissions to ensure EVs and WQOs are protected and enhanced (refer statutory activities in
Section 2).

Non-statutory responsibilities

With regard to rural activities within the Shire, the level of adoption of Best Management
Practices (BMP) by landholders to improve rural land management is largely unknown.

There are several not-for-profit incorporated community groups who provide extension
services to rural landholders which promote sustainable land management and
conservation. This service is often achieved through property visits, field days and
workshops which cover a range of farm management and production issues such as grazing
land management, soil health and fertilizer and chemical use (see table below for more
details).

These groups also support Council’s conservation programs, notably Land for Wildlife and
Voluntary Conservation Agreements which have a predominately rural focus.




                                                                                    Page 24 of 81

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             2 FEBRUARY 2016


Council offers a level of support to these groups through grants funding.

Community Group                  Extension services
Country Noosa              Promotes sustainable agriculture, horticulture and other rural
                             enterprises in the Noosa Hinterland through field days, workshops,
                             and social events to support and strengthen community cohesion.
                           The Country Noosa website connects interested people, allows them
                             to interact through a knowledge base and a marketplace, and links
                             them to the latest in rural news.
                           The website also provides a downloadable copy of the 1981 Noosa
                             Shire Handbook: An inventory of the Agricultural Resources and
                             Production of Noosa Shire Queensland - this handbook was used
                             by the officers of the Department of Primary Industries to assist them
                             in their planning of research and extension programs.
Mary River Catchment       Promotes a common view of a sustainable and productive catchment.
Coordinating               Partners with the Gympie District Beef Liaison Group, AgForce, the
Committee (MRCCC)            Burnett Mary Regional Group, Department of Agriculture and Forestry
                             to deliver the Reef Water Quality Grants Program in the Mary River
                             catchment.
                           Works with interested graziers to implement improved land
                             management practices to reduce the amount of nutrients, chemical
                             and sediments leaving their farms and impacting on Reef Water
                             Quality.
                           The MRCCC website is a resource for the coordinating committee
                             (including multiple-sector representation) and rural landholders. The
                             website is a portal for information on projects, events and threatened
                             species recovery initiatives.
Noosa and District         Promotes the value, protection and rehabilitation of the Noosa
Landcare                     Biosphere Reserve.
                           Encourages the adoption of best management practices and
                             sustainable land uses.
                           Assists in the preservation of water quality and ecosystem health in
                             the region.
                           Educates and raises awareness through community programs,
                             workshops and traineeships.
                           Provides a native plant nursery and environmental consultancy.
                           The N&DL website provides information on contract services, plant
                             sales, Waterwatch testing and volunteering opportunities.


Rural activities

Council does not currently offer extension services to rural landholders to improve rural land
management and protect the EVs of the Shire’s natural waters.

Therefore a greater level of support for the not-for-profit community groups mentioned
above, who have an interest and experience in providing this service, may be an appropriate
avenue for Council to do more to protect the water quality in rural areas.

These not-for-profit groups often deliver extension initiatives in conjunction with the Federal
and State governments, largely through regional bodies such as SEQ Catchments and the
Burnett-Mary Regional Body – the Reef Water Quality Grants Program is one such initiative.

There are synergies linking sustainable land management, the adoption of BMP for rural
activities, and Council’s conservation programs, notably the Land for Wildlife (LFW) Program
and the Voluntary Conservation Agreement (VCA) Program.



                                                                                        Page 25 of 81

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         2 FEBRUARY 2016


In addition, many rural landholders who have land under production have also registered
their properties as LFW. Some of these landholders have taken land conservation one step
further and have applied a VCA to their land title. In most instances the LFW Program is the
catalyst for the adoption of VCAs.

Within the Noosa Shire there are over 300 rural properties registered as LFW and 20 rural
properties with a VCA. Currently the Council resources dedicated to LFW are minimal whilst
the VCAs (which incorporate a rebate to landholders) are funded via the Environment Levy.

Sustainable agriculture, conservation land management and water quality protection are not
mutually exclusive environmental outcomes.

Boosting support for the not-for-profit groups, as well as the LFW Program would help to
consolidate the extension work undertaken by these groups and could potentially be a
strategic investment in sustainable land management, biodiversity conservation and water
quality protectionthe protection of the EVs of natural waters throughout the Shire.

Healthy Waterways recently announced their intention to create a new entity with SEQ
Catchments which may also help deliver improved strategic on ground outcomes in rural
areas in partnership with Council and these not-for-profit community groups.

4.   Modelling to inform waterways management

Noosa River Flood Study

Council has commissioned an upgrade and extension of the existing flood study of the
Noosa River incorporating predictive flood height, velocity and erosion forecasts.

The existing study was completed in 1995 and utilises a combination of RAFTS hydrological
modelling and MIKE11 hydraulic modelling.

The upgraded flood study will provide Council with a confident basis for ongoing planning
and decision making regarding land use planning, development assessment, disaster
management and waterway management.

The specific project objectives for the upgrade include:
   developing an improved understanding of anticipated areas of inundation for existing
     and future climate scenarios;
   developing an understanding of anticipated channel shifts and sand erosion/deposition
     for potential dredging, maintenance and construction activities; and
   developing an understanding of flood flow velocity distributions within the waterway
     and throughout the adjacent floodplains.
Council is expecting the updated flood model to incorporate best practice methods, the latest
modelling techniques and be prepared with accepted industry software applications that
reflect the nature of the catchment and river system and have a broad industry user base.

The ability for Noosa Council to administer the associated models beyond the completion of
the flood study upgrade is also an expected outcome.

Through upgrading the Noosa River Flood Study, Council is seeking to apply the findings of
the upgraded hydraulic model to investigate management strategies for shoreline erosion in
the lower river estuary.



                                                                                   Page 26 of 81

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


eWater Source Catchment Modelling
eWater Source is a predictive tool used to indicate the resilience of natural waters to absorb
more development while theoretically maintaining EVs and WQOs.

The tool has been built by collaborative industry and research development teams from
leading Australian universities and water industry organisations, with the help of significant
funding from the Australian Government.

The software provides a framework for modelling the amounts of water and contaminants
flowing through a catchment and into major rivers, wetlands, lakes, or estuaries.

eWater Source integrates an array of models, data and knowledge that can be used to
simulate how climate and catchment variables (rainfall, evaporation, land use, vegetation)
affect runoff, sediment and contaminants. The output can be used to offer clear scenarios
and options for making improvements in a catchment.

It allows users to answer a range of management questions, such as where to place on-
ground works to maximise water quality. It can predict the flow and constituent loads at any
location in any catchment over time. Scenarios can include actual or planned changes in
land use, land management, climate variability and climate change. For example, eWater
Source can be used to understand issues such as:
   quantity and quality of rainfall-driven runoff and groundwater reaching streams in the
     catchment under present conditions;
   alterations made to quantity and quality of runoff by climate variability, different land
     uses, or riverbank restoration – now, or in the future;
   optimal locations for on-ground work to maximise water quality improvement;
   impacts of bushfire, flood, drought, construction activity or water extractions on the
     quality of receiving waters; and
   the effect of land use change on water quality and quantity into receiving waters.
In the future, and with improved data input accuracy, it is anticipated that the eWater model
will be able to theoretically identify whether parts of Noosa River catchment are or are not
likely meet their EVs and WQOs over the long term, and whether any changes in upstream
land use practice scenarios, including for example retrofitting of (WSUD) or other offset
strategies will help.

The eWater model could apply predictive scenarios relating to the Shire’s industrial and
commercial areas, rural lands, unsealed rural roads and upgrades to existing stormwater
infrastructure.

Healthy Waterways will rely heavily on the eWater model for future annual River Health
Report Cards.

5.   Potential Future Initiatives
1.   Establishment of an inspection and educational program to check compliance of the
     now non-ERA licensed businesses.
2.   Establishment of an inspection and educational program to prevent sediment runoff
     from building sites; runoff from car washes; backwashing pools and spas; cleaning and
     painting roofs; and to prevent littering (including cigarette butts) particularly around
     commercial areas.



                                                                                    Page 27 of 81

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        2 FEBRUARY 2016


3.      Inclusion in the capital renewal program prioritisation for stormwater assets, an
        assessment of risk to receiving water quality as well as the current condition
        assessment approach.
4.      Inclusion of upgrades to the stormwater infrastructure in existing urban developments
        in the future amendment of the Noosa Local Government Infrastructure Plan.
5.      Consideration of increasing support for those community groups providing extension
        services to rural landholders to improve the uptake of best management practices for
        rural land management.
6.      Consideration of increasing support for the Land for Wildlife (LFW) Program to
        adequately service the conservation interests of rural landholders registered in the
        Program.
7.      Utilising the capabilities of the eWater Source Catchment Model to test scenarios
        relating to future investment in green infrastructure within the Shire’s river catchments
        to maintain EVs and WQOs.
Officers will develop these options (including costs) for consideration as part of the 2016/17
budget development process.

Previous Council Consideration

Ordinary Meeting 7 May 2015, Item 8, Page 7
That Council note the report by the Environment Officer to the Planning & Organisation
Committee Meeting dated 28 April 2015 and agree to a review of both Council and privately
owned Bioretention Basins with a focus on maintenance of those Bioretention Basins.

Finance & Risk

Nil

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Departments/Sections Consulted:

      Chief Executive Officer                X   Community Services                 X   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

      Executive Office                       X   Planning & Infrastructure
      Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Infrastructure Planning & Design
      Governance                                 Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                    Page 28 of 81

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   2 FEBRUARY 2016



                                                                                  Attachment 1
Current monitoring activities underway in the Noosa LGA.

   Statutory activities                                           Details
Site specific monitoring      The following developments were required to undertake water quality
relating to new residential   monitoring for a period of time following completion of their development:
developments.                  Noosa Civic
                               Doonella Estate
                               Noosa Springs
                               RACV Resort (nee Noosa Sanctuary)
                              Water quality monitoring is no longer sought from new developments
                              because it did not facilitate for prevention of problems to water quality.
                              Financial efforts are now focused on ensuring any water quality treatment
                              measures within new developments are constructed and maintained as
                              required. This method allows for operation of the developments to be
                              consistent with the planned impacts to the receiving water quality. A
                              review of all Council bioretention basins has commenced and it has
                              shown that these bio basins have not been maintained. More detailed
                              assessments of the bio basins are now underway to facilitate for
                              adequate funding to be sourced in the next budget to rectify the basins
                              and ensure they operate as designed.

Operational specific          Surface and groundwater monitoring undertaken quarterly to confirm that
monitoring relating to the    the Landfill does not impact on the Environment Values (EVs) of
Eumundi Road landfill.        receiving waters. Constituents that are monitored are indicators of
                              leachate or other chemical releases from the landfill.

Project specific              Upstream and downstream monitoring is required during the operation of
monitoring relating to        Environmentally Relevant Activities (ERA) i.e. dredging operations to
dredging operations or        monitor for pollutants most likely to be generated from the activity. Other
other waterways related       waterways related projects have to comply with State approvals and
projects.                     conditions in order to protect the EVs of the natural waters in Noosa
                              Shire.

Annual inspections of         Council’s Environmental Health Officers (EHOs) inspect 9 businesses per
businesses with an            year across the Shire to ensure compliance with their ERA license
Environmentally Relevant      conditions. These include
Activity (ERA) license.       - 3 boat maintenance/repair businesses;
                              - 1 metal recovery business;
                              - 1 surface coating business;
                              - 4 plastic product manufacturing businesses.
Complaint-driven              Council’s EHOs investigate approximately 40 complaints per year relating
investigations of pollution   to water quality including public health issues, contamination and
incidents                     accidents. Investigations often involve tracing back through the
                              stormwater network to the point source.

Seasonal monitoring for       The program aims to ensure our popular river and ocean bathing
microbial pollution within    beaches are bacterially safe for swimming. Council’s EHOs conducted
Noosa’s bathing reserves      this program annually from 1994 to 2008. It was picked up again by the
(i.e. river and beach).       Sunshine Coast Council during 2012-13. Monitoring involves taking water
                              samples on a regular basis during peak swimming seasons. Obtaining
                              laboratory test results for enterococci (bacterial indicator), investigating
                              catchment areas when very poor results are obtained. In worst case
                              scenarios, erecting public warning signs to avoid swimming near
                              stormwater outlets e.g. Noosa Heads Lions Par, Little Cove. This
                              monitoring minimizes the public health risks under the Public Health Act
                              2005.



                                                                                              Page 29 of 81

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  2 FEBRUARY 2016


Upgrade of Noosa River     The existing flood study was completed in 1995. This upgrade will
Flood model                provide a confident basis for ongoing planning and decision making
                           regarding land use planning, development assessment, disaster
                           management and waterways management.
                           Specific objectives for the upgrade include developing an improved
                           understanding of:
                           - anticipated areas of inundation for existing and future climate
                               scenarios;
                           - anticipated channel shifts and sand erosion/deposition for potential
                               dredging, maintenance and construction activities; and
                           - flood flow velocity distributions within the waterway and throughout
                               the adjacent floodplains.
                           Council will also seek to apply the findings of the upgraded hydraulic
                           modeling (a component of the existing flood study) to investigate
                           management strategies for shoreline erosion in the lower estuary.

Non-statutory activities                                            Details
Annual ecosystem health    Healthy Waterways manages this program on behalf of Noosa Council
assessments of the         and other local governments in South East Queensland.
Noosa River catchment      The Noosa River catchment is regarded as a ‘reference’ catchment in
lakes and estuary (i.e.    terms of ecosystem health for SE Qld.
Report Card).              Since 2001, health grades for the Noosa River catchment has fluctuated
                           between an A (excellent condition) to a B (good condition). These
                           fluctuations are often linked to rainfall intensity and duration as a general
                           rule each assessment year. Freshwater streams have better health
                           ratings during a wet year, indicating a positive influence of high water
                           flows. In contrast, estuaries often have poorer grades in wet years, when
                           significant quantities of sediment and nutrients are washed down from
                           the upper catchment.
                           There are 5 freshwater and 17 estuarine monitoring sites assessed twice
                           per year. The indicators of ecosystem health used include nutrients
                           (nitrogen & phosphorus); habitat (quality of bed/banks streamside
                           vegetation); aquatic processes (rates of plant/algal growth); biota
                           (variety/health of fish & macro invertebrates); physical-chemical status
                           (oxygen availability, temperature, water clarity, salinity, acidity).

                           In 2015, Healthy Waterways introduced a new Waterway Benefits Rating
                           to the annual Report Card.

                           The Noosa River received an A- grade & 4.5 stars Waterway Benefit
                           Rating. The community rates their ability to use, and satisfaction with, the
                           waterways very highly. Excellent freshwater riparian and estuarine
                           habitats.

Monthly Waterwatch         Noosa Waterwatch is a community based network of volunteers who
monitoring of Noosa and    monitor local creeks and rivers on a monthly basis. The Program is
Mary River catchments.     coordinated by Noosa and District Landcare and has been running for
                           over 10 years.
                           There are 40 volunteers collecting data on 45 sites across the Noosa
                           River and Mary River (i.e. Six Mile Creek) catchments. Hinterland
                           volunteers monitor 21 sites throughout Cooroy, Pomona and Kin Kin;
                           whilst the coastal volunteers monitor 24 sites throughout Noosa,
                           Peregian and Boreen Point. Aquatic macroinvertebrate or water bug
                           surveys are also conducted at selected sites or as requested by school
                           groups. Water quality indicators at each site are monitored and compared
                           to the recommended guidelines for healthy waterways.
                           Council has supported this program in the past as an educational
                           initiative through the Community Grants Program.




                                                                                             Page 30 of 81

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   2 FEBRUARY 2016


Seagrass and mangrove         This program was launched by the Noosa Integrated Catchment
monitoring in the Noosa       Association (NICA) in 2006 and it is part of an international scientific
River.                        program initiated in Australia in 1998 called Seagrass Watch.
                              Approximately 15 sites in the lower estuary are assessed each year by
                              volunteers. Council supports this program through the Community Grants
                              Program & receives annual monitoring reports.
Frog monitoring               The Mary River Catchment Coordinating Committee (MRCCC)
                              coordinate this program to determine the presence (or not) of threatened
                              frog species in riparian areas. The rare frog species surveyed included
                              the Giant Barred Frog, Cascade Tree Frog and the Tusked Frog.
                              Information from monitoring provides an indication of the quality of
                              stream habitat, enabling on-ground works to be targeted and threatened
                              species habitat to be protected and conserved.
Investigative monitoring      This investigation was sparked by community concerns about the high
of high nitrogen              nitrogen levels in Lake Cootharaba. The lake sediments contain a huge
concentrations in Lake        pool of nitrogen which is released through sediment porewater mixing
Cootharaba (flagged as a      and wind driven resuspension. The study took a closer look at how
result of the annual health   sediments and nutrients are delivered to and cycled within the Lake.
assessments).                 Findings of the study revealed the conversion of in-sediment total organic
                              nitrogen (TN) to dissolved inorganic nitrogen (DIN) was the main driver of
                              elevated water column DIN in the lake. It also confirmed that the Upper
                              Noosa River delivers a higher volume but carries lower nutrient, sediment
                              and coliform loan than Kin Kin Creek. Because of the lake’s size position
                              in the catchment, it fulfils a range of ecosystem services that protect the
                              health of the Lower Noosa River. The basin acts as an efficient trap for t
                              sediment and pollutant inputs, and plays an important role in increasing
                              water residence time which allows for greater microbial processing of
                              pollutant loads. Whereas other catchments have dams, weirs or
                              impoundments, Noosa has Lake Cootharaba, and to a lesser extent Lake
                              Cooroibah, absorbing sediment and nutrient naturally, for free.

eWater Source                 eWater Source is a predictive tool used to indicate the resilience of
Catchment Modeling            natural waters to absorb more development while theoretically
                              maintaining EVs and WQOs. The software provides a framework for
                              modelling the amounts of water and contaminants flowing through a
                              catchment and into major rivers, wetlands, lakes, or estuaries.

                              Scenarios can include actual or planned changes in land use, land
                              management, climate variability and climate change e.g. eWater Source
                              can be used to understand issues such as:
                              - quantity and quality of rainfall-driven runoff and groundwater
                                  reaching streams in the catchment under present conditions;
                              - alterations made to quantity and quality of runoff by climate
                                  variability, different land uses, or riverbank restoration – now, or in
                                  the future;
                              - optimal locations for on-ground work to maximise water quality
                                  improvement;
                              - impacts of bushfire, flood, drought, construction activity or water
                                  extractions on the quality of receiving waters; and
                              - the effect of land use change on water quality and quantity into
                                  receiving waters.

                              Healthy Waterways will rely heavily on the eWater model for future
                              annual River Health Report Cards.




                                                                                              Page 31 of 81

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 32 of 81

a                     CHS OE           a              ie                    :         es                       pF                                   i                 =
 a                         Qn         gh ie                           -      385             $                         F                            Or-                2
 <x                   PS      4  NS 2 (= if       wr fot,  8                            g 2                     g      é                             A
 WL        <x        4                                                                           &       §
 ©         N
 Wi                          coal       Sa                                   —              xe       i                                               !                 ©
 nN                  AG                                                                   2      2g      4
  So       —           ee          1    ras                  a                  2          aS                                                     z—
[aa        =           C          Mp    SG                                                          pF         od
 >        Lu          aD           G        4   of         8                             fH         :    a     3       $
 N          ,           og ee                                                            re      5  8
 O                  R~       ah       ”                  /             a                      i)      A                      (                        :                ‘©
 z                   Lea         |    (                5                        a       os   FESS                  !                                                    S
 <         2                se    Ae                   sb               Ww —      é~      3            ;           }                                                    oD
 =                       eis      e,              Pt                     EY       ke         a8                                                                         2
 =         oO
 E                          aN                    :                      i                   =                  ,                                                      a
 ao        <x          7      »       se                                                  PAS  =    Jn          AA       :
tH        ES          j
 ud                  ; — i          Ds            3                    AS      i‘ ~8 >        I~                                                      wo
                         Sih ee      ~~           3     1S}            ysis     Qs           OF      {           r
 Ww                                                         8           AR) —    ie      4                                                            wo
 EF                                                        a.             :  ) 2   \     ‘                          2                   g
 =          <q                       A                                       toes   oN J—                           w                    8   g
                              x    oe                       2.           om            ther, <             4
 =           Oo                                                                   —cs          |                    site                ce 2          a
                                                            5.            : Bu      —~   {                          -
            _l                                                                    ae       SG:             :             6              2     8
 wi                                ¢                        a          | os; fe ~       \
             =                                                                     UN if        A        g\         5    2                 =
 >           5                                                                     \        ,  b    x               °    3              f             °
 oO          °                                            0                         }       2                       i    =                   0
 =          .                                             o'                          (i                 7          Se                     =
 ©           °                        f                  in                                LACAN                    s    &
 <                                                        ©                          We   acs Neato                      3              522
 G          s                                         Pon                 :           ee        (i                       s               a7
 2                                                    :                 Aa              EARS           EY                8               23g
 a          2                       AVG},                                os             Ds ye x A           7            2              3 5 z
                                    $f                                  Z                     :         O°                                 =
 < |         |§                '                                         LO         3 4            RU                    :                 14
 co                            9                                    Pe BE re            w~         1    >    2           2              s$3s
            E                  :                                 Pak                of                a                  2              TT
 Oo          £                 =                                 a     “a 47 (3)       ;                Ss               2
             Oo                S                             pep is      CS          wae           [RS                                   G
 oO         ~                  3            Lx“             8s           Aa         2                Sa,          b                     §
             ©                  wu              x      P     ae    4 Met          aS      7         ee oh YFP     i                     a     gs
 =z                            &               WN      ST IP GLE    fiat                  ap YP    ee bY? sok    “PD                       o
 5           oO                w                      V4 Dk “aD pe FE oR              )   z    EBL! “fC.            .                    3 z S
08                             =                                  ,    7D  Z  a     6   [one            “4
             an                                          AG    ie! Wises ys          Z ALiZ,    hes  ey     Yee ;                       2 83
 =           @®                =                          * eS    mat Gp   8   .   ae fy NS  ; pl   On I \ >. Ke 7,                      5 8 8
 <           >                 o                                 :   ME       Pr     A A        my” | EDs      ay                        38 9
                                                                 i”                 BS        a      eg} ob    Late    y                 go   2
_I           2                                                  i /     oa      sna f= yom Fi Q GER Ae BS ES 7 aA                       s & 5
 a                                                                   Mees   Whe Bo EN             (ee            Vy                     ll   J
                                                                     3  Let 4 a ape     ees BS f- anaes  5%                               {] ll
                                                                  -   Prat og 4   y (hf   Atidh oe 27  aye FT  g's
                                                                                bole (as   és] 9    Mf       2                           8
                                                                      @          anf      sl PoP 6     OfPre       Eblrer                2.3
                                                                                      52 A Fe aed Les ?             EY,                  5 3
                                                                     ees Ca Haj                                   YY
                                                                                   (}  E  ‘e   ‘    i¢   ?     5	1	1	1	68	8	2734	1791	14	13	92	8
4	1	1	1	69	0	1660	1784	1136	305	-1	
5	1	1	1	69	1	1660	1988	67	101	76	a
5	1	1	1	69	2	1745	1959	245	74	30	Mee
5	1	1	1	69	3	2100	1910	107	54	42	igi
5	1	1	1	69	4	2329	1910	3	3	12	etl
5	1	1	1	69	5	2367	1878	5	8	44	é
5	1	1	1	69	6	2763	1780	21	81	0	Ee
4	1	1	1	70	0	1657	1833	1144	234	-1	
5	1	1	1	70	1	1657	2065	4	2	71	:
5	1	1	1	70	2	1748	2021	105	35	54	AF
5	1	1	1	70	3	1911	2007	38	13	32	2
5	1	1	1	70	4	2063	1968	51	27	14	woe
5	1	1	1	70	5	2137	1963	12	43	18	sf
5	1	1	1	70	6	2320	1932	4	3	65	‘
5	1	1	1	70	7	2730	1842	18	19	66	zs
5	1	1	1	70	8	2776	1833	25	19	59	2
4	1	1	1	71	0	1718	1853	1078	260	-1	
5	1	1	1	71	1	1718	2059	89	54	52	ar
5	1	1	1	71	2	2729	1853	67	34	52	$s
4	1	1	1	72	0	1920	1905	867	177	-1	
5	1	1	1	72	1	1920	2060	32	22	42	A)
5	1	1	1	72	2	2737	1905	3	58	92	|
5	1	1	1	72	3	2784	1905	3	58	96	|
4	1	1	1	73	0	2655	1982	141	34	-1	
5	1	1	1	73	1	2673	1978	14	53	37	ao
5	1	1	1	73	2	2729	1982	67	33	49	a8
4	1	1	1	74	0	2660	2005	136	36	-1	
5	1	1	1	74	1	2660	2008	18	33	46	Ce
5	1	1	1	74	2	2777	2005	19	6	57	2
4	1	1	1	75	0	2729	2013	67	21	-1	
5	1	1	1	75	1	2737	2008	9	31	68	Oo
5	1	1	1	75	2	2781	2013	15	12	20	&
4	1	1	1	76	0	2355	2025	441	129	-1	
5	1	1	1	76	1	2355	2092	69	62	50	a”
5	1	1	1	76	2	2661	2040	30	41	0	g
5	1	1	1	76	3	2729	2037	20	12	7	-
5	1	1	1	76	4	2776	2025	20	26	7	=
4	1	1	1	77	0	2661	2083	22	20	-1	
5	1	1	1	77	1	2661	2083	22	20	57	®
4	1	1	1	78	0	2552	2069	248	79	-1	
5	1	1	1	78	1	2552	2117	79	31	79	——
5	1	1	1	78	2	2654	2105	30	18	64	4
5	1	1	1	78	3	2771	2069	29	57	0	y

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                2 FEBRUARY 2016


4                        PROPOSED AUDIT OF ADVERTISING SIGNAGE
DOCUMENT INFORM AT ION




Author                           Manager, Planning & Environment, Kerri Coyle
                                 Planning & Infrastructure Department

Index                            ECM /Subject / Signage Survey /Audit

Attachments                      Nil


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Manager, Planning & Environment to the Planning &
Organisation Committee Meeting dated 2 February 2016 regarding a proposed audit of
advertising signage.



REPORT
1.                       Background

The character and feel of Noosa’s towns and villages is a significant influence on resident
and visitor perception of Noosa. Features such as human scale development; integration
with the natural landform and landscape; low key informal atmosphere; low stress traffic
environments; and high proportions of vegetated land compared to developed land all play a
key role in characterising Noosa Shire. This means that in Noosa, buildings are low rise of
predominantly 2 storeys, development is largely secondary to the natural environment,
natural landscapes are conserved and reinforced, roundabouts are preferred to traffic lights
and advertising signage is subdued.

These features are recognised and distinguish Noosa Shire from other parts of South East
Queensland. These features are incorporated into the provisions of The Noosa Plan, Local
Laws and Council policies and are key issues when assessing new development proposals.
However some development matters do not require an approval from Council before
proceeding, subject to meeting a prescribed set of requirements and are largely self-
regulated. One of these matters includes advertising devices and it is evident that the extent
of advertising signage throughout the Shire has increased over time, with some signage
erected in breach of The Noosa Plan and the Local Law.

Signs in Noosa should advertise a place of business or give directions and or information.
They should be architecturally attractive and be compatible with the character of the area
and not dominate streetscapes. Well designed and maintained signs which respect the scale
and character of the street do serve an important function and role. When signs do not relate
to the area, are excessive in size, numbers and feature large designs, they reflect poorly
upon the overall quality of the area and can detract from the function they are intended to
serve.




                                                                                       Page 33 of 81

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         2 FEBRUARY 2016


The Noosa Plan’s Advertising Devices Code seeks that:
   Advertising devices complement and do not detract from the desirable characteristics
     of the natural and built environment in which the advertising devices are exhibited;
   Advertising devices are designed and integrated so as to minimise visual clutter;
   Advertising devices do not detract from the visual amenity of the major road network
     nor from the rural or residential amenity enjoyed by residents of and visitors to Noosa;
     and
   Advertising devices are safety constructed and secured and do not create a hazard.
This means neon lights, bunting, blind signs, moving signs, flashings signs, roof signs,
3-dimensional signs, signs with a sign face area exceeding 4m2 and any combination of
signs on one premise of more than 10m2 are generally not consistent with these outcomes
sought by The Noosa Plan. Similarly, real estate signage and A-frame signage is also limited
in size, placement and numbers by the Local Law.

Currently, one staff member undertakes some auditing of new advertising devices erected in
the Shire, although this is largely on an ad hoc basis, with no systematic checks being
undertaken. Any complaints received by Council are also addressed and since 2010
approximately 300 complaints have been received in relation to signage. Signage complaints
are mostly received from similar type businesses raising issue with the quantity of a
competitor’s sign and whether it is complying with the Noosa Plan and/or Local Law. Often
when auditing a new sign or addressing a complaint received, it is evident that some
business operators are unaware of the signage requirements and act on the basis of the
amount of signage erected by their neighbours or competitors in the area. However, some
businesses seek to attract business by erecting larger or a greater amount of signage,
creating an unfair advantage between businesses.

Since 1 January 2014 some excessive signage has been addressed but there is still a
significant amount of signage that is non-compliant, and in some areas the signage is
starting to dominate the streetscape. The photos below taken mid 2014 indicate how
signage can proliferate over the years if left unchecked.




Photo.1 A large amount of A frames, kites, 3 dimensional and pylon signs being used.


                                                                                   Page 34 of 81

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                      2 FEBRUARY 2016




Photo 2: - Three A frame signs being used for one tenancy on Hastings Street




Photo. 3 A large amount of signs used to advertise upcoming events on one wall.


                                                                                  Page 35 of 81

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                      2 FEBRUARY 2016




Photo 4. Proliferation of A Frame signs on Noosa Eumundi Road.




Photo 5: Noosaville car yard with “Wholesale” sign measuring approximately 18m²



                                                                                  Page 36 of 81

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           2 FEBRUARY 2016


While much of the non-compliant signage shown in the photos above has now been
addressed by the business operators, excessive signage continues to be erected by some
businesses. This creep of excessive signage is likely to be an ongoing problem and where
left unchecked is likely to significantly impact on the character and feel of Noosa’s towns and
villages over time.

2.    Current Advertising Device Requirements
Advertising devices or signage is currently managed by The Noosa Plan and the Local
Laws, with signage primarily managed via the planning scheme’s Advertising Devices Code.
The Noosa Plan’s Advertising Device Code includes requirements for all signage on private
and public property that is not of a temporary nature such as pylon signs, roof signs, below
awning signs, window signs, signs on sports fields etc. Where signage complies with the
acceptable solutions of the Advertising Devices Code the sign is self-assessable and may be
erected with a development application to Council. An application for a Development Permit
for Operational Work is otherwise required to be lodged with Council where a sign does not
comply with the acceptable solutions of the Code.
The Local Law manages advertising devices not regulated by the planning scheme including
signage on road reserves or of a temporary nature such as A-Frames, Event Direction, Real
Estate and Garage Sale signs. Under the Local Law these types of signs do not require an
application to be lodged with Council provided the signs comply with identified criteria (i.e.
such as size, location, maximum number of size etc.).

3.    Options for Regulating Advertising Devices
There are number of options for Council to regulate advertising devices into the future and
the following have been developed for consideration by Council. Officers will develop these
options further for consideration as part of the 2016/17 budget process.
Option 1: Do Nothing
Council officers could continue to regulate signage under the current Noosa Plan and Local
Law requirements addressing non-compliant signage on ad-hoc basis and as signage
complaints are received. However, this is likely to lead to a creep of excessive signage over
time.
Option 2. Educate, Audit & Compliance
 Provide educational material on signage requirements to support businesses achieving
   compliance with the signage requirements. This could include the development of an
   information sheet for businesses and improved information on Council’s website.
   Information could also be tailored to address representative organisations such as the
   Chamber of Commerce and particular groups such real estate agents and car yards.
   Distributing information sheets to local sign writers may also be useful in communicating
   the signage requirements and reduce the extent of non-compliant signage erected.
 Undertake an audit of all advertising devices to develop a database of all existing
   advertising devices in the Shire; identifying compliant and non-compliant signage and
   assist in ongoing monitoring of signage in the future. This audit is likely to provide useful
   background data for future planning purposes, including the development of the next
   planning scheme for Noosa Shire and review of current Local Laws, and in determining
   the effectiveness of the current signage requirements.
 Provide follow-up information and advice to operators where breaches of the signage
   requirements are identified by the audit. This would take the form of a letter providing
   information on the signage requirements, identification of the non-compliant signage and
   options on how to address the breach of the signage requirements.



                                                                                     Page 37 of 81

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         2 FEBRUARY 2016


 Carry out enforcement of the signage requirements where education and negotiation has
   been unsuccessful in achieving compliance with the signage requirements. Prior to
   commencing any enforcement action, a number of opportunities would be provided to
   the operator to discuss with officers what is required to comply with the signage
   requirements and why the action is necessary and a reasonable time to address the
   matter.
It is anticipated that these actions would take a minimum of 2 years to complete by one full
time officer and require input by other officers in the DA Planning team.
This option is likely to result in a significant improvement in the current situation and be
reasonably effective for some time, but in the long term if signage is not continuously
proactively regulated the creep of excessive signage is likely to continue.

Option 3. Ongoing Regulation and Amendment to Local Laws
 All of the above actions outlined in Option 2.
 To effectively regulate signage into the future it is anticipated that a 0.5EFT would be
   required on an ongoing basis.
 Re-introduce a registration process for signage under the Local Laws. This would
   require amendment to the current Local Laws, take 3 to 6 months to complete, and could
   be applied to signage currently regulated both by the Local Law and The Noosa Plan.
   Amendment to the Local Law would require community consultation and be subject to
   submissions and feedback from the community.
Prior to 2008 signage was more effectively regulated through a registration process under a
Local Law, wherein an annual fee was charged for signage on the basis of a sliding scale
fee (i.e. fee increased as the amount of signage increased), with some minor types of
signage excluded (i.e. such as signs for home-based businesses). This enabled Council to
maintain signage records for each business, including details of the number, size and
general description of signs, and conduct annual inspections. At the time over 450 signs
were registered, with the average cost per business for registration of signs being
approximately $200 per annum.
A legal opinion was recently provided by King and Company at no charge to Council as part
of Council’s LGAQ membership entitlements. The legal opinion provided outlined the legal
context and requirements should Council in the future wish to amend its Local Laws to
require the registration of signage within the Shire. The advice received confirms the Local
Laws cannot duplicate a development process under the Sustainable Planning Act 2009
(SPA) but that “…there is scope for Council to make a local law dealing with the ongoing use
and management of advertising devices that were installed pursuant to an approval given
under the SPA provided that the specific subject matter of the local law is not covered by
Council’s planning scheme…”. Further “…Council is entitled to make a local law that
requires a person responsible for the display of an advertising device (whether installed
pursuant to an approval under the SPA or Local Law No. 1) to apply to register their device
on a Council maintained register, on the basis the requirement appears to relate to ongoing
use, rather than development…”.
The advice received does caution that there are some limitations on what matters can be
included in the local laws, as compliance inspection activities must fall within the scope of
cost-recovery fees and relate to the local law requirements.
Option 3 is likely to be the most effective in the ongoing regulation of signage in the Shire
and address the creep of excessive signage into the future.




                                                                                   Page 38 of 81

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        2 FEBRUARY 2016


Previous Council Consideration

Nil

Finance & Risk

To undertake an audit of all advertising devices in the Shire would require 1 full time officer
for 6 to 8 months at a cost of $29,547 to $39,397. The measuring tool has been costed at
$1,763.75 plus GST.

To complete all of the steps, the cost for 1 full time officer (level 3.1) would be $59,094 (plus
on costs) x 2 years.

These options will be presented to Council as part of the 2016/17 budget process.

Consultation

External Consultation - Community & Stakeholder

Prior to undertaking the audit, information would be sent out to all business owners advising
of the proposed audit and its purpose, and providing information on the current signage
requirements in Noosa.

Internal Consultation

Departments/Sections Consulted:

      Chief Executive Officer                    Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities               x   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

      Executive Office                       x   Planning & Infrastructure
      Community Engagement                   x   Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                   x   Infrastructure Planning & Design
      Governance                             x   Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                    Page 39 of 81

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              2 FEBRUARY 2016


CORPORATE SERVICES DEPARTMENT REPORTS

5                      CORPORATE SERVICES DEPARTMENT UPDATE - 2ND QUARTER 2015/16
DOCENT INFORM AT ION




Author                           Director Corporate Services, Michael Shave
                                 Corporate Services

Index                            ECM/ Branch Management/ Corporate Services

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Corporate Services to the Planning &
Organisation Committee Meeting dated 2 February 2016 providing an update on operations
of the Corporate Services Department for the period 1 October 2015 to 31 December 2015.


REPORT
The adopted organisation structure includes the following sections under the Corporate
Services Department:

                     Financial Services;
                     Revenue Services;
                     ICT (including Records);
                     Procurement & Fleet; and
                     Property & Facilities.

Corporate Services primarily provides internal support to the other Council Departments,
with the exception of the Property team that deals primarily with land and property
management issues.

The following table provides a brief summary regarding recent achievements, current
priorities and items on the agenda moving forward for the Corporate Services Department.




                                                                                     Page 40 of 81

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


CORPORATE SERVICES DEPARTMENT

SECTION            RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           LOOKING AHEAD
Finance             Audit planning for 2015/16 statements      Loading of adopted asset                   Analysis of 2016/17 budget bids and
                      by Queensland Audit Office.                  components to reflect change in              revision of long term financial
                    Assistance with internal audit review        accounting standards.                        forecast.
                      of cash handling and waste                 Revaluation of other infrastructure        Banking services tender process.
                      management.                                  assets.                                    Implementation of changes to
                    Review of corporate overhead               Revision of the non-current asset            accounting standards requiring
                      distribution model for service review.       policy.                                      reporting for related parties.
                    Budget system established and open         December quarter budget review.            Technology One CI anywhere
                      for 2016/17 budget development.            Draft related parties disclosure             implementation for supply chain and
                                                                   guideline in preparation for                 financial modules.
                                                                   implementation from 1 July 2016.           Budget development for the branch.
                                                                 Development of budget for 2016/17.
                                                                 Preparation of tender specification for
                                                                   banking services review.
                                                                 Update of accounting manual and
                                                                   review of policies.



Revenue Services      Bi-annual pensioner verification           Responding to customer queries             Rates collection.
                        completed.                                   resulting from issue of rates.             Loading of new valuations from the
                      Provision of data and information for      Prompt processing of agency                  Department of Natural Resources and
                        waste management internal audit.             payments.                                    Mines in February and modelling of
                      January rate levy issued.                                                                 new figures for the budget.
                      Supplementary rate notices issued.                                                      Technology One CI anywhere
                                                                                                                  implementation for rates and property
                                                                                                                  module.




                                                                                    Page 41 of 81

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               2 FEBRUARY 2016


SECTION               RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                          LOOKING AHEAD
ICT                    Record keeping training delivered.           Implementation of new mobile              Planning migration from current
                       New training resources on the                  infringements system.                       mapping systems to new Technology
                         intranet.                                    Development of digital strategy             One mapping system.
                       Improvements to the Council website            including ongoing improvements to         Cloud based storage of user working
                         to simplify requests.                          the Council website and intranet.           files.
                       Twenty old printers replaced.                Implementation of Technology One          Technology One business intelligence
                       Old Library public internet PCs                HR CI anywhere modules.                     module implementation.
                         replaced.                                    Implementation of Technology One          Technology One Property and Rating
                       Email moved to Microsoft Office 365            Supply Chain and Financials CI              CI anywhere module implementation.
                         reducing email costs and increasing            anywhere modules.                         Further research and planning
                         size limits for email and mailboxes.         Technology One Eplan module                 towards thin client potential for
                       Presentation to ECM users group of             implementation.                             desktops.
                         TechnologyOne ECM product                    Support for mobility rollout for asset    Investigation of Eservices changes by
                         roadmap.                                       inspection program.                         Technology One.
                                                                                                                  Implementation of Technology One
                                                                                                                    bin register for new waste contract.
                                                                                                                  Budget development for the branch.

Procurement & Fleet      Branch Plan actioned.                        Numerous procurement panel                Leased vehicle replacement strategy
                         Procurement Reports constructed in             arrangements ongoing either under           ongoing.
                           conjunction with Technology One and            development or under evaluation.          Contract management and
                           audit recommendations.                       2015/16 year fleet capital                  procurement training to be scheduled.
                         Electricity power factor correction            replacement delivery ongoing.             Finalisation of Hastings Street CCTV
                           work undertaken and completed at             Ongoing support for capital works           review.
                           four large Council sites. Savings to be        delivery in conjunction with              Budget development for the branch.
                           monitored monthly.                             Infrastructure Services.
                         Fleet Management, Unity Water and            LG Vendor Panel Marketplace draft
                           Electricity reports provided to the            strategy developed and timetable
                           Leadership Team for information.               established.
                         Procurement support for                      Banking Services tender under
                           Infrastructure Services to deliver             development in conjunction with
                           capital program.                               Gympie Regional Council and Local
                         Procurement manual updated.                    Buy.
                                                                        SES vehicle purchased and waiting
                                                                          fit-out.




                                                                                          Page 42 of 81

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              2 FEBRUARY 2016


SECTION                 RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                       LOOKING AHEAD
Property & Facilities    Reconciled and issued monthly water         Property Service Review                Investigation into vacant land asset
                           and sewerage on charge invoices to          Renewal of expired community tenure      holdings and opportunities.
                           community and commercial tenure               arrangements.                          Development of formal approach for
                           holders.                                    Noosa Sports Complex lease               consideration of events and
                         Rifle Street land acquisitions for flood      renewals.                                commercial and other activities on
                           mitigation works.                           Asset condition inspections.             public land.
                         Franz land settlement.                      Capital projects delivery.             Holiday Parks new management
                         Cooroy RV stopover operational.             Footpath dining audit.                   agreements.
                                                                                                                Holiday Parks business models and
                                                                                                                  strategic planning including North
                                                                                                                  Shore redevelopment.
                                                                                                                Technology One CI anywhere
                                                                                                                  implementation for property module.
                                                                                                                Budget development for the branch.




                                                                                        Page 43 of 81

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     2 FEBRUARY 2016


Previous Council Consideration

Nil.

Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Nil.

Departments/Sections Consulted:

       Chief Executive Officer                Community Services                 X   Corporate Services
       Executive Officer to the Mayor & CEO   Community Facilities               X   Financial Services
       Executive Support                      Community Development              X   ICT
                                              Libraries & Galleries              X   Procurement & Fleet
                                              Local Laws                         X   Property & Facilities
                                              Waste & Environmental Health       X   Revenue Services

       Executive Office                       Planning & Infrastructure
       Community Engagement                   Building & Plumbing Services
       Customer Service                       Civil Operations
       Economic Development                   Infrastructure Planning & Design
       Governance                             Planning & Environment
       Human Resources                        Strategic Land Use Planning
       Sustainability




                                                                                                 Page 44 of 81

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          2 FEBRUARY 2016


6                        2015-16 NATIONAL COMPETITION POLICY REFORM APPLICATION
DOCUMENT INFORM AT ION




Author                              Director Corporate Services, Michael Shave
                                    Corporate Services Department

Index                               ECM/Subject/Financial Management/Accounting/National Competition
                                    Policy

Attachments                         Nil


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Director Corporate Services to the General Committee
Meeting dated 2 February 2016 and
A.                       Apply the Full Cost Pricing reform option to the Waste Management business activity
                         for the 2015/16 financial year in accordance with section 44(1)(b) of the Local
                         Government Act 2009; and
B.                       Apply the Code of Competitive Conduct to the Holiday Parks business activity for the
                         2015/16 financial year in accordance with section 47 of the Local Government Act
                         2009.


REPORT
Background

The Local Government Act 2009 requires Council to decide each financial year whether to
apply National Competition Policy (NCP) reform to its identified business activities.

Certain activities of Council are required to be identified as business activities if they trade in
goods and services that could potentially be delivered by a private sector firm for the
purposes of earning profits in the absence of Council’s involvement. They do not include the
non-business, non-profit activities of Council such as libraries, swimming pools, parks
maintenance etc.

The primary purpose for Councils to apply NCP reforms to its business activities is to assist
in removing anti-competitive conduct, encourage greater transparency in the operation of its
competitive activities and improve the allocation of Council’s limited resources.

A number of different reform options are provided under legislation for application to
identified business activities. Commercialisation or Full Cost pricing reforms are generally
applied to larger or financially significant business activities, whereas the Code of
Competitive Conduct is applied to the smaller or prescribed business activities.

The general premise to consider is that the larger the Council business activity the larger the
potential financial impact on the local economy and potential competitors, and hence greater
level of reform applied to ensure ongoing competitive neutrality.




                                                                                                   Page 45 of 81

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        2 FEBRUARY 2016


1. Business Activity Classification

Expenditure thresholds are published each financial year by the Department of Local
Government, Community Recovery and Resilience, and Councils are required to determine
if any of their activities deemed competitive in nature are classified as either a significant
business activity based on the definition under the Local Government Regulation 2012, or a
prescribed or smaller business activity when implementing the Competitive Code of
Conduct. The announced expenditure thresholds applicable for the 2015/16 financial year
are as follows:

     $9.2 million for significant business activities; and
     $325,000 for Code of Competitive Conduct business activities.

2. Application to Noosa Identified Activities for 2015/16

Two of Council’s activities have been identified as competitive in nature that meet the criteria
and relevant threshold levels for identification as business activities. The activities that have
been identified and reform levels to apply (based on the estimated annualised budgeted
expenditure) are:

 Business Activity             Expenditure                 Reform Level
 Waste Management              $10.0 million               Significant
 Holiday Parks                 $2.2 million                Code of Competitive Conduct
Note: annualised expenditure for significant activities includes total operating expenses less depreciation less
competitive neutrality costs plus interest and loan redemption. Expenditure for code of competitive conduct
activities includes total operating expenses plus interest.

3. Public Benefit Assessments

Section 46 of the Local Government Act 2009 requires that a public benefit assessment
(PBA) be undertaken for a new significant business activity. A PBA is an assessment of
whether the benefit to the public (in terms of service quality and cost) of applying competitive
neutrality in relation to a significant business activity outweighs the costs.

Council needs to undertake a PBA for the waste management business activity this financial
year. The PBA is currently in progress and is nearing finalisation.

Previous Council Consideration

Council previously adopted NCP reforms to the Waste Management and Holiday Parks
business activities consistent with those recommended in this report at its meeting on 25
September 2014.

Finance & Risk

Financing implications primarily revolve around administrative effort in ensuring ongoing
competitive neutrality compliance (i.e. budget preparation, reporting, full cost pricing
modelling).

Failure to appropriately review and apply competition reforms annually is a breach of the
Local Government Act 2009, and could also potentially result in competitive neutrality
complaints should appropriate adjustments not be incorporated into business activity pricing
decisions.




                                                                                                    Page 46 of 81

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    2 FEBRUARY 2016


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Nil

Departments/Sections Consulted:


      Chief Executive Officer                Community Services                 X   Corporate Services
      Executive Officer to the Mayor & CEO   Community Facilities                   Financial Services
      Executive Support                      Community Development                  ICT
                                             Libraries & Galleries                  Procurement & Fleet
                                             Local Laws                             Property & Facilities
                                             Waste & Environmental Health           Revenue Services

      Executive Office                       Planning & Infrastructure
      Community Engagement                   Building & Plumbing Services
      Customer Service                       Civil Operations
      Economic Development                   Infrastructure Planning & Design
      Governance                             Planning & Environment
      Human Resources                        Strategic Land Use Planning
      Sustainability




                                                                                                Page 47 of 81

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                           2 FEBRUARY 2016


7                        WASTE MANAGEMENT BUSINESS ACTIVITY PUBLIC BENEFIT ASSESSMENT
DOCUMENT INFORM AT ION




Author                              Director Corporate Services, Michael Shave
                                    Corporate Services Department

Index                               ECM/ Subject/ Financial        Management      /   Accounting/    National
                                    Competition Policy

Attachments                         1.   Public Benefit Assessment Draft Report
                                         (33 pages – provided separately to this agenda, 2 hard copies are
                                         available in the Councillors Room)



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Corporate Services to the Planning &
Organisation Committee Meeting dated 2 February 2016 and
A.                       Approve the draft Public Benefit Assessment report for the purpose of public
                         consultation; and
B.                       Note that a report will be presented to a future Council meeting on the preferred
                         business model.


REPORT
Background
Following de-amalgamation Council resumed responsibility for the provision of waste
management services in the Noosa shire. The State Government de-amalgamation
legislation included provisions regarding Council businesses and the requirement to
undertake new public benefit assessments should they be considered financially significant.
Council’s waste management business meets the relevant expenditure threshold to be
considered financially significant (with full cost pricing reform still applied to the business
activity).
Whilst Council has questioned the cost benefit to the community of undertaking a further
PBA (given the recent PBA undertaken by the Sunshine Coast Regional Council in 2010),
the state government advised it was still required. As such Council was required to
undertake a PBA of the waste management business activity to determine the most
appropriate business structure under National Competition Policy (NCP) reforms. The reform
options under consideration include:
1.                       The business continues with Full Cost Pricing (FCP) reform; or
2.                       The business becomes a Commercialised Business Unit (CBU).
The objective of the PBA is to assess whether the benefit to the Noosa community (in terms
of service quality and cost) of applying the competitive neutrality principle outweighs the
associated costs. Under the competitive neutrality principle, an entity that is conducting a
business activity in competition with the private sector should not enjoy a net advantage over
competitors only because the entity is in the public sector.




                                                                                                     Page 48 of 81

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        2 FEBRUARY 2016


PBA Process

There are old guidelines released by the State Government required to be followed with
respect to undertaking PBAs. The guidelines have been complied with as part of this
process and resulting reporting outputs.

Copies of the draft report (Attachment 1) have been provided in hard copy in the Councillors’
room. The draft recommendation in the report is to continue with the FCP business model
currently applied.

The next stage of the process is to publish the draft report for public comment, consider any
comments that may be received and then provide a further report back to Council
recommending the final preferred business model.


Previous Council Consideration

Nil

Finance & Risk

Council has a legislative requirement to undertake the PBA and apply NCP reform to its
nominated business activities.

Consultation

External Consultation - Community & Stakeholder

External consultation has occurred as part of the PBA via publishing of an information paper
on Council’s website requesting comments and feedback. Only one response was received
from a member of the community that recommended continuing with the current business
model.

Internal Consultation

Manager Waste and Environment al Health
Director Community Services
Chief Executive Officer
Community Engagement

Departments/Sections Consulted:

x     Chief Executive Officer                x   Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                             x   Waste & Environmental Health           Revenue Services

      Executive Office                           Planning & Infrastructure
x     Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Infrastructure Planning & Design
      Governance                                 Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                    Page 49 of 81

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  2 FEBRUARY 2016


Revenue Services

8                        JANUARY 2016 RATE LEVY
DOCUMENT INFORM AT ION




Author                           Manager, Revenue Services, Kellie Seeleither
                                 Corporate Services Department

Index                            ECM Rates Management/Rateable Services

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Manager Revenue Services to the Planning &
Organisation Committee Meeting dated 2 February 2016 providing an overview of the
January 2016 Rate Levy.


REPORT
This report provides Council with a summary of the January rate levy.

1.                       Levy Summary

Rate notices were issued on the 19 January, with a due date of the 19 February. The gross
amount of the levy was $34.66 million, which comprised of $31.82 million of Council rates
and charges, and $2.84 million for the State Emergency Management Levy. Between July
and January the net decrease in rateable properties was 86, as continued slow growth was
insufficient to offset the amalgamation of 140 properties at 94 Noosa Drive.

                                                                                  Rateable Valuation
Levy/Charge                                         Amount         # Properties
                                                                                    Or # Services
General Rates                                     $22.78 million        30,041            $7.6 billion

Separate Charges
Environment Levy                                    $0.9 million        30,041                 30,041
Public Transport Levy                               $0.3 million        30,041                 30,041
Heritage Levy                                      $0.07 million        30,041                 30,041

Special Rates and Charges
Tourism Levy                                      $1.311 million         5,747           $1.38 billion
Noosa Main Beach Maintenance                      $0.271 million         1,902           $591 million
Hastings St Precinct Maintenance                  $0.170 million         1,902           $591 million
Hastings Street Safety Levy                        $0.08 million           834                    834
Rural Fire Levy                                    $0.08 million         6,217                 6,217
Noosa Junction Levy                               $0.045 million           156           $39.4 million
Noosa Waters Lock & Weir Levy                      $0.04 million           591           $384 million
Noosa Waters Canal Maint Levy                      $0.01 million           591           $384 million
North Shore Electricity Charge                     $0.02 million            26                      29

Utility Charges



                                                                                             Page 50 of 81

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                2 FEBRUARY 2016


                                                                                Rateable Valuation
Levy/Charge                               Amount            # Properties
                                                                                  Or # Services
Waste Management Charges                 $5.6 million            28,838                     32,879
Holding Tank Charges                    $0.05 million                75                         75
Backflow Device
                                       $0.084 million             1,472                      3,998
Registration Fees
Emergency Management, Fire
                                        $2.84 million            30,225                     30,250
and Rescue Levy (EMFRL)

1.    General Rate Details by Category

                                          #             Rateable                        # Properties
     General Rate Category                                                 Amount
                                      Properties        Valuation                       on Minimum
1 - Rural & Agricultural                     230         $51,123,000        $151,704              137
2 – Commercial
                                            890          $66,187,333        $466,745             822
valued up to $175,000
3 – Commercial
                                            410         $110,818,663        $378,276                 40
valued $175,001 - $400,000
4 – Commercial valued over
                                            236         $224,036,201        $759,136                 13
$400,000
5 – Extractive (not in Cat. 31)              12           $2,612,670         $14,957                  9
6 – Residential PPR
                                          11,544   $2,071,556,369          $6,040,526         10,471
valued up to $280,000
7 – Residential PPR
                                           2,124        $717,683,863       $1,446,408            695
valued $280,001 - $450,000
8 – Residential PPR
                                            368         $183,614,966        $366,174                 52
valued $450,001 - $550,000
9 – Residential PPR
                                            318         $205,572,060        $404,145                 31
valued $550,001 - $700,000
10 – Residential PPR
                                            235         $177,305,178        $338,597             150
valued $700,001 - $800,000
11 – Residential PPR
                                            130         $110,989,000        $204,284                 79
valued $800,001 - $920,000
12 – Residential PPR
                                             99         $100,036,750        $177,242                 40
valued $920,001 - $1,100,000
13 – Residential PPR
                                             64          $79,137,500        $130,337                 43
valued $1,100,001 - $1,400,000
14 – Residential PPR
                                             92         $165,650,000        $260,768                 15
valued $1,400,001 - $2,500,000
15 – Residential PPR
                                             20          $59,600,000         $90,542                 11
valued over $2,500,000
16 – Residential Not PPR
                                           4,547        $944,912,815       $3,016,472          3,381
valued up to $420,000
17 – Residential Not PPR
                                            261         $119,945,704        $295,216                 80
valued $420,001 - $500,000
18 – Residential Not PPR
                                            496         $250,145,616        $606,461                 41
valued $500,001 - $750,000
19 – Residential NPPR
                                            493         $645,735,414       $1,555,029                32
valued over $750,000
20 – Vacant Land > $1M and
                          2                  13          $30,095,000        $126,264                  -
area more than 1,500m
21 – Pump Stations, Stock Grazing
Permits and garages/small lots with            2            $45,128          $188.61                  1
                        2
an area less than 20m
22 – Vacant Land subject to
                                             92          $39,991,000         $50,168                  -
developers concession
23 – Retirement Villages and                 10          $17,060,000         $57,671                  -



                                                                                          Page 51 of 81

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             2 FEBRUARY 2016


                                          #         Rateable                         # Properties
        General Rate Category                                         Amount
                                      Properties    Valuation                        on Minimum
Nursing Homes
24 – Shopping centre - gross floor
                               2               6       $18,710,000        $94,897                   -
area between 2,500 & 10,000m
25 – Shopping centre - gross floor
                          2                    1       $25,000,000       $173,963                   -
area greater than 10,000m
26 – Shopping centre - gross floor
                             2                 4        $5,926,952        $22,940                   -
area between 1,000 & 2,500m
27 – High Rise Units Not PPR                 219       $16,768,660       $234,446               200
28 – High Rise Units PPR                       3        $1,162,962         $5,313                   -
29 – Low Rise Units Not PPR                5,519    $931,750,334      $4,284,191               3,449
30 – Low Rise Units PPR                    1,702    $231,868,935      $1,025,960               1,151
31 – Extractive Industries Quarries            1         $335,000          $1,699                   -
Total                                     30,141   $7,605,377,073    $22,780,720           20,943



2.      Rate Concessions

Details of the Council pensioner concessions granted on the January Levy are set out below.

                                      Maximum Rebate
 Type of Council Concession                                   # Properties           Amount
                                         (1/2 year)
Maximum/Sole Owner                          $115.00              1,168              $137,195
Maximum/Joint Owners                         $ 90.00             1,183              $102,235
Not Maximum/Sole Owner                       $57.50                676               $40,308
Not Maximum/Joint Owners                     $32.50              1,080               $34,005
Total                                                            4,107              $313,743

In addition to the pensioner concessions Council allowed general rate concessions on 49
properties totalling $56,795.

Details of the pensioner concessions funded by the State Government are as follows:-

State Government Rebates                # Properties            Amount

General Rates & Charges                    4,400              $432,793
State Emergency Management Levy            4,400              $ 68,777

3.      Electronic Delivery Option

As postage costs increased significantly as at 1 January 2016 we have been encouraging
residents to have their rate notice e-mailed. When the levy was issued 2,053 properties, or
6.6% of the total notices issued, were set up for electronic delivery. In the week following
the issue date we have received an additional 100 requests, with many people taking
advantage of the online registration form on our website.

Previous Council Consideration

Nil




                                                                                       Page 52 of 81

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    2 FEBRUARY 2016


Finance & Risk

There are no properties where the outstanding rates and charges are close to the rateable
value of the land, consequently there is no risk of any rates and charges being written off as
bad debts at this time.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Director Corporate Services

Departments/Sections Consulted:

      Chief Executive Officer                Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO   Community Facilities                   Financial Services
      Executive Support                      Community Development                  ICT
                                             Libraries & Galleries                  Procurement & Fleet
                                             Local Laws                             Property & Facilities
                                             Waste & Environmental Health       x   Revenue Services

      Executive Office                       Planning & Infrastructure
      Community Engagement                   Building & Plumbing Services
      Customer Service                       Civil Operations
      Economic Development                   Infrastructure Planning & Design
      Governance                             Planning & Environment
      Human Resources                        Strategic Land Use Planning
      Sustainability




                                                                                                Page 53 of 81

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               2 FEBRUARY 2016


EXECUTIVE OFFICE REPORTS

9                        EXECUTIVE OFFICE DEPARTMENT UPDATE - 2ND QUARTER 2015/16
DOCUMENT INFORM AT ION




Author                             Executive Manager, Debra Iezzi
                                   Executive Office

Index                              ECM/Branch Management/Internal Department Meetings/Executive
                                   Office

Attachments                        Nil


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Executive Manager to the Planning & Organisation
Committee Meeting dated 2 February 2016 providing an update on operations of the
Executive Office for the period 1 October 2015 to 31 December 2015.


REPORT
The purpose of this report is to inform Council of the progress of various initiatives and
programs of the Executive Office which includes the following functions:

                       Human Resources
                       Community Engagement
                       Economic Development Officer
                       Sustainability Officer
                       Customer Service
                       Governance
                       Executive Office Support

The following table provides an update on the activities undertaken in the Executive Office
during the period 1 October to 31 December 2015.




                                                                                       Page 54 of 81

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            2 FEBRUARY 2016


EXECUTIVE OFFICE

SECTION           RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                              LOOKING AHEAD
Human Resources      Progressive implementation of MY             Implement of the 2015/16 training             Improving WH&S management,
                       HR online employee service portal              program                                         processes and practices, further
                       (on line leave applications etc.)            Progressive implementation of T1 HR             development of management plans
                     Step into Spring Challenge, 100 staff          modules with a focus on My HR, skills         Implement leadership development
                       members participated. This                     module, forms, timesheets and                   programme
                       successful programme was won by                performance appraisal                         HR services review (later 2016)
                       the Depot Misfits, second place was          Progressive review of HR Policies and         Develop a framework for workforce
                       the Respite Centre Sweet Souls- this           procedures                                      planning for the organisation
                       fun and engaging event was                   Development of Payroll BCP                    Finalise implementation of T1 HR
                       successful in bringing together staff        Finalise management actions                     modules
                       and improved awareness of the                  resulting from internal audit of payroll      Co-ordinate Learning and
                       importance of regular exercise to            Recruitment of WH&S Advisor                     Development needs for 2016-17
                       living an enjoyable life                     Improve administrative processes and            budget process
                     Completed the process for recruiting           actions associated with WH&S                  Implement new performance
                       and engaging trainees with 2                   system-focus areas include risk                 management HR module in T1
                       Trainees and one apprentice                    assessments, incidents, hazard
                                     st
                       commence 1 February                            inspections, rectification action plans,
                     Progression of Pat on the Back                 licencing and training requirements
                       recognition scheme for staff.                Prepare for the implementation of the
                       Presentation of brief to the leadership        new performance management HR
                       team will be delivered in Early                module in T1
                       February
                     Work experience placements are
                       ongoing in engineering, town
                       planning, libraries and Botanical
                       Gardens
                     Work for the Dole process incl.
                       project identification and staffing
                       needs completed and we are
                       investigating another current options
                       for participants
                     Commenced further drafting of HR
                       policies and procedures.




                                                                                       Page 55 of 81

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


SECTION           RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          LOOKING AHEAD
Human Resources      Commenced process for recruitment
(cont.)                of WH&S Advisor
                     Recruitment of new HR Manager
                       Finalised December 2015
                     Engagement of additional temporary
                       WH&S Advisor given resignation of
                       previous WH&S Advisor in
                       September
                     Review and updating of WH&S
                       incident reports, hazard inspections
                       training and general records
                     Leadership development
                     Preparation of Draft Payroll BCP


Community            Co-ordinate Council’s second                Continue community engagement and         Completion of digital strategy website
Engagement             community jury.                               YourSay Noosa support for the               project
                     Provided project and on-the-ground            Rufous Street Precinct consultation       Training more staff in use of Your Say
                       support to the Waste Department in          Complete Council website content            Noosa tools
                       delivering Council’s Toward Zero              review and replace remaining              Finalise IAP2 training – engagement
                       Waste initiative, including                   traditional-style landing pages with        essentials for more staff as required
                       coordination of educational material,         new tile-format pages                     Effective continuing communications
                       and media material, and assistance          Provide media, community                    of Community Jury 1
                       at shopping centre pop-up stalls              engagement and YourSay Noosa                recommendations adopted and
                     Oversaw the introduction of                   support for the Noosa Transport             implemented by Council.
                       Boomerang bags for use by staff at            Strategy development project              Report to council on Community Jury
                       Council sites to support the reduction      Continue working with ICT and               2 outcomes.
                       of plastic bag waste - a goal of              respective departments to improve
                       Council’s Towards Zero Waste                  Council’s website functionality and
                       initiative and a community campaign           content
                     Audited more than 40 Council forms          Continue progressing, with ICT, the
                       to identify new online service or e-          greater use of online forms to
                       requests opportunities for Council’s          increase website functionality for
                       website                                       customers/ratepayers




                                                                                    Page 56 of 81

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            2 FEBRUARY 2016


SECTION              RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                            LOOKING AHEAD
Community               Provided the Environment                   Continue working with Waste
Engagement (cont.)        Department with community                    Department on Towards Zero Waste
                          engagement, YourSay Noosa and                long-term education and behaviour
                          media support to finalise the Wallace        change initiatives
                          Park Flying Fox Management Plan            Keep the community informed as to
                          community consultation                       progress with Council’s advancement
                        Provided community engagement,               of Noosa River management
                          YourSay Noosa and media support              responsibilities following community
                          for the Carbon Reduction and Energy          jury 2
                          Efficiency Plan consultation               Continue to increase Council’s social
                                                                       media reach
                                                                     Continue to expand Council’s image
                                                                       library
                                                                     Arrange IAP2 secondary module
                                                                       training for selected staff who have
                                                                       previously undertaken base training
                                                                     Continue to provide media with
                                                                       information relating to Council
                                                                       decisions, community engagement
                                                                       projects and other business.
                                                                     Work with ICT to develop a digital
                                                                       plan/strategy to further improve
                                                                       Council’s digital presence
                                                                     Complete all landing pages and
                                                                       content review of website
                                                                     Review of community jury trial project
                                                                       and its value as a community
                                                                       engagement tool




                                                                                       Page 57 of 81

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 2 FEBRUARY 2016


SECTION                  RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                             LOOKING AHEAD
Economic                  Council adopted the Noosa Shire                Prepare an Implementation Plan for        Conduct a Networking Event to
Development                 Local Economic Plan at its OM of 17              the Noosa Shire Local Economic              introduce the Local Economic Plan, a
                            Dec                                              Plan                                        new business assistance tool and
                                                                                                                         provide introductions to agencies,
                                                                                                                         programs and services to assist
                                                                                                                         businesses develop and/or grow.
                                                                                                                       Commence planning and
                                                                                                                         implementation for priority 1 projects
                                                                                                                         in the Local Economic Plan
                                                                                                                       Develop budget PMI’s for priority 1
                                                                                                                         projects to be implemented in the
                                                                                                                         2016-17 financial year.

Sustainability Project    Initial community consultation                Analysis of public feedback and            Finalise draft plan and undertake
Officer                     undertaken on Have Your Say                     preparation of draft plan.                   further consultation with Council
(note 50% allocated to      seeking comments on focus areas,
sustainability, 50% to      how to reduce emissions and
waste)                      improved energy use
                          Meeting of peer review group

Customer Service          CSO cross training undertaken with a          Cross training of CSOs into other          Cross training of CSOs into other
                            ride along on the rubbish trucks to             areas for their development                  areas for their development
                            understand the service provided               Development of Customer service            Finalise development of BCP
                            better was well received and the team           BCP
                            gained some valued insight.                   Preparing for busy rating period (Jan
                          Improve on line requests with the               and Feb will be very busy for the CS
                            customer lodging requests online now            team)
                            receiving an email with their request         Continual review and improvement of
                            confirmation once the e-request has             customer service processes including
                            been processed and allocated to an              online enhancements to streamline
                            area.                                           processes for staff and customers
                          Purchased team uniforms and positive
                            feedback received from internal and
                            external customers, team moral lifted.




                                                                                            Page 58 of 81

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                    2 FEBRUARY 2016


SECTION         RECENT ACHIEVEMENTS                       CURRENT PRIORITIES                          LOOKING AHEAD
Governance       Finalised and published Council’s         Continue to co-ordinate development       Undertake a review of Council’s
                   Annual Report for 2014-15 on                of Payroll BCP, Customer Service            Complaints Management Framework
                   Council’s website                           BCP, Waste Recovery BCP and                 and Administrative Action Complaints
                 Finalised annual review of Council’s        Council Buildings and Facilities BCP        Policy
                   compliance against the Local                with relevant operational managers        Development of Public Interest
                   Government Act/Regulation utilising       Support operational areas with third        Disclosure and Fraud and Corruption
                   checklists as provided by the               quarter operational risk reviews in         Control training for relevant staff
                   Department of Infrastructure, Local         accordance with Council’s Risk              within the organisation
                   Government and Planning                     Reporting Framework                       Assist Council’s Audit and Risk
                 Coordinated onsite internal audit         Coordination of draft agenda and            Working Team with coordinating
                   testing of Council’s Cash Handling          preparation of Governance and Risk          management responses and
                   Processes and Council’s Waste               related documents and reports for           implementation of recommendations
                   System Charges and Reconciliation,          Council’s Audit and Risk Committee          contained in Cash Handling and
                   which was undertaken by Crowe               Meeting of 5 Feb 2016                       Waste Charges internal audit reports
                   Horwath in December                       Undertake review of Council’s             Co-ordinate the completion of
                 Finalised Council’s Master Business         Governance Framework                        outstanding operational BCP’s for
                   Continuity Plan and Council’s ICT                                                       review by the Leadership Team and
                   BCP in conjunction with the                                                             commence testing program.
                   Leadership Team and ICT Manager
                 Finalised Council’s Fraud and
                   Corruption Control Plan
                 Updated Council’s Governance
                   related public internet pages
                 Facilitated the Leadership Team’s
                   Strategic Risk Review held in
                   December




                                                                               Page 59 of 81

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           2 FEBRUARY 2016


SECTION              RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           LOOKING AHEAD
Executive Officer     Cooroy RV Stopover works                   Preparation of brief and tender            Tender evaluation and commissioning
(Special Projects)      completed and site opened for use 10         documents for multi-disciplinary             of multi-disciplinary consultancy to
                        December, 2015                               consultancy to undertake                     undertake investigations, analysis of
                      Obtained Council direction on                investigations, analysis of options and      options and conceptual planning for
                        approach to various land tenure              conceptual planning for                      redevelopment and future expansion
                        matters on Noosa North Shore.                redevelopment and future expansion           of NNS Campground
                        Council resolution 17 December,              of NNS Campground                          Initiate discussions with various State
                        2015                                       Preparation of Project Briefs for            agencies to implement decisions on
                      Obtained Council direction and               capital works funding requirements for       various land tenure matters on Noosa
                        funding approval for multi-disciplinary      NNS Campground redevelopment                 North Shore. The processes related
                        consultancy to undertake                   Submissions for BR3 Review                   to these matters are complex and
                        investigations, analysis of options and    Notification to various agencies of          involve numerous agencies. Will take
                        conceptual planning for                      Council decision and development of          a number of years to finalise
                        redevelopment and future expansion           action plan for implementation of          Review Service Review process and
                        of NNS Campground. Council                   Council decision on various tenure           methodology to determine if
                                      th
                        resolution 17 December, 2015                 changes on Noosa North Shore                 improvements required in advance of
                      Continued work in coordinating and         Mentoring and preparation for LGMA           2016/17 review process
                        overview of various Service Reviews          Team Challenge group for March             Mapping of council services as part of
                      Input to Electoral Commission                2016 team challenge (staff training          corporate planning/operational
                        Queensland on location of polling            initiative)                                  planning processes for new Council
                        booths for March 2016 local                Reviewed implementation of actions         Prepare MCU for Kin Kin
                        government elections and                     from previous Service Reviews.               Sportsground to formalise the use of
                        requirements for pre-polling               Finalise work in coordinating and            the site as an RV Stopover (links with
                      Developed Fact Sheet on Election             overview of various Service Reviews          Property & Facilities Branch
                        Signage for local government election        to allow Steering Committee to review        community lease renewal for this site)
                        candidates                                   reports and determine recommended          Mentoring and preparation for LGMA
                      Assisted Community Development               actions                                      Team Challenge group for March
                        with analysis and review of options                                                       2016 team challenge (staff training
                        for operational grants program                                                            initiative)




                                                                                      Page 60 of 81

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                2 FEBRUARY 2016


Previous Council Consideration

Nil

Finance & Risk

Nil

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

The supervisors of the various functions of the Executive Office have been consulted in the
preparation of this report.


Departments/Sections Consulted:

      Chief Executive Officer                Community Services                 Corporate Services
      Executive Officer to the Mayor & CEO   Community Facilities               Financial Services
      Executive Support                      Community Development              ICT
                                             Libraries & Galleries              Procurement & Fleet
                                             Local Laws                         Property & Facilities
                                             Waste & Environmental Health       Revenue Services

x     Executive Office                       Planning & Infrastructure
x     Community Engagement                   Building & Plumbing Services
x     Customer Service                       Civil Operations
x     Economic Development                   Infrastructure Planning & Design
x     Governance                             Planning & Environment
x     Human Resources                        Strategic Land Use Planning
      Sustainability




                                                                                            Page 61 of 81

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             2 FEBRUARY 2016


10                       OPERATIONAL PLAN PROGRESS REPORT -2ND QUARTER 2015-16
DOCUMENT INFORM AT ION




Author                           Chief Executive Officer, Brett de Chastel
                                 Executive Office

Index                            ECM/ Subject/ Corporate Planning

Attachments                      1.   Operational Plan Progress
                                 2.   Key Performance Indicators


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Planning & Organisation
Committee Meeting dated 2 February 2016 providing an update on progress with the
implementation of the Operational Plan to 31 December 2015 and details of Council’s Key
Performance Indicators.


REPORT
This report is in two parts. The first part provides Council with an overview of progress in
implementing the annual Operational Plan. The second part focuses on the Key
Performance Indicators (KPIs) which are reported to Council on a quarterly basis.

This report relates to the second quarter of the 2015/16 financial year.

1.                       OPERATIONAL PLAN UPDATE

For 2015/16, the Council adopted a new style of Operational Plan. Now, only the major
initiatives are included in the Operational Plan with the day to day “business as usual”
activities included in Branch Plans.

The Branch Plans have all been completed and are being used by Managers to deal with
day to day activities. They are proving to be an effective tool for ensuring that all of the
“business as usual” activities are undertaken and that any minor projects are followed
through.

What this means in practice is that the CEO quarterly reports to Council on progress with the
Operational Plan now purely focus on the most important projects being undertaken by
Council. Details of each Operational Plan project is set out in Attachment 1 with an
assessment of whether the issue in completed, on target or behind schedule. Comments
are also provided for the information of Councillors about the status of each issue. It is
important to note that the comments and assessment of the Operational Plan projects in the
attachment are “as at 31 December” i.e. the end of the second quarter.

The table following highlights some specific Operational Plan issues.




                                                                                    Page 62 of 81

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016



Initiative                             Comment

Electric Bus Trial                     We have successfully terminated the contract with
                                       the original supplier who could not deliver their new
                                       electric buses on schedule. Translink have been
                                       kept in the loop and are in agreement with our
                                       proposed course of action. Updated EOIs have been
                                       prepared to assist in sourcing new Electric Buses.
                                       The trial is now scheduled to begin in late 2016. It is
                                       disappointing that the trial will be delayed due to non-
                                       performance by the original supplier but with ongoing
                                       technology developments, it may be a blessing in
                                       disguise with newer technology now available.

Local Economic Plan                    The Noosa Local Economic Plan was adopted in
                                       December 2015 and a report on implementation is
                                       being reported to the February round of Council
                                       meetings.

New Planning Scheme                    The CEO has appointed an experienced Project
                                       Manager who will have oversight of the new Planning
                                       Scheme development. They commence in February.

Dr Pages Road                          Culvert strengthening on Kinmond Creek Road has
                                       been undertaken. With fine weather the project is
                                       slightly ahead of schedule.

Workplace Health and Safety            There is still a considerable amount of work to be
                                       done on WH&S. See also comments in the KPI
                                       section of this report. This is a major priority for
                                       management.

Asset Management                       The first eight high level Asset Management Plans
                                       have been adopted by Council. The review of our
                                       Asset Management Framework, Capability and
                                       Resource requirements has commenced with the
                                       consultants on site this week working with key staff.



2.    KEY PERFORMANCE INDICATORS

As Council would be aware, KPIs were first developed for our organisation at the beginning
of 2014/15. Approximately 30 management KPIs were developed and these are reviewed
on a monthly basis by the Leadership Team. Approximately 15 of those KPIs are reported to
Council on a quarterly basis. They are also reported to the Audit & Risk Committee in detail
at each Audit & Risk Committee meeting.

As far as the CEO is aware, we are one of the few Councils in Queensland to make this KPI
information available to the public via “non-confidential” reports. The KPIs are included in
Attachment 2.




                                                                                     Page 63 of 81

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


The key issues arising from an assessment of the KPIs for the first quarter are as follows:

Our People
   In relation to WH&S, our performance is still not up to scratch. We are focusing on our
     WH&S policies, systems and procedures which are still a work in progress. The
     Executive Manager and our new HR Manager have WH&S as their highest priority. A
     new WH&S Advisor has been appointed to commence in February.
   The average duration of time lost due to injury is very high compared to other like
     Councils. It is also higher than last year. This is reflective of an older workforce where
     injuries can sometimes take longer to recover.
   Our WH&S scheme rate is increasing but is still lower than other Councils in category
     D (similar Councils to Noosa Council). The best performing Council in that category
     has a scheme rate of 0.905% while the worst is 2.083%. Our scheme rate increased
     from 1.242% to 1.366% (as a percentage of total wages).
   Personal leave taken is continuing to be monitored closely and has shown significant
     improvement since this time last year. It is more than 50% lower than 12 months ago
     as can be seen from the year on year comparison.
   We have changed the KPI measuring annual leave to focus on “Accrued Annual Leave
     Weeks (median)” but we also monitor the number of staff who have excess (over 8
     weeks) annual leave weeks accumulated. We have made a concerted effort to reduce
     the number of staff with over 8 weeks annual leave but progress has been slow.
     There are still 27 staff with more than 8 weeks of annual leave (down from 31 at 30
     September) reflecting some work areas where there has been high workloads over the
     last 2 years (e.g. Finance).
   Our staff turnover rate remains very low compared to other Councils.

Our Customers
   The total number of customer requests received by Council remains on a slight upward
     trend in the long term with slightly more customer requests per month in November
     and December than at the corresponding time last year.
   Council will recall that in previous KPI reports, the level of sign off of completed CRMs
     (customer request management system) was quite low. More work has been done at
     the management level in “drilling down” within the overall statistics. This has seen our
     reporting and closing out of requests improve significantly in the October to December
     period.
   The average wait time for our customers when phoning Council continues to improve
     over time and our month to month performance is better than last year. However there
     continues to be some months where the target of an average of 1 minute is exceeded
     (December). Our frontline customer service staff continue to provide exceptionally
     good service.
   Customer indicators for processing times for various types of development applications
     have remained relatively constant over the 3 month period. On average, 80% of all
     applications are processed within statutory timeframes.
   The average time to process plumbing applications has risen over the last 5 months
     but is still almost 50% better than the statutory deadlines. This rise reflects the
     additional work undertake by the plumbers to service Council facilities such as public
     toilets and beach showers.




                                                                                    Page 64 of 81

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         2 FEBRUARY 2016


Our Finances
       Our financial KPIs measure solvency, investment performance and outstanding rates.
         All of these KPIs continue to be on track.
        Council receives a financial performance report at the end of each month which
         provides a more detailed analysis of Council’s financial position. Council receives a
         detailed report on capital works progress every 3 months.
Our Systems and Processes
        We have a focus on improving our systems to allow more online transactions to enable
         our community to have 24/7 access to various services. In relation to online
         payments, the KPI shows an increasing trend on a month by month comparison to last
         year. Online payments tend to spike during rate periods, dog registration renewals etc
         but over the longer term, it is becoming a more popular payment option.
        However, requests for services which are lodged online (as a percentage of total
         requests) are still quite low. Currently, only around 14% of customer requests are
         lodged online. It would be good to increase this to 40% over the next year or two.
         Some changes to online forms, layout etc have already been made to make the
         process more customer friendly. The CEO has also recently established a staff
         working group focusing on building a “digital culture” which focuses on a range of
         digital issues including our website, more online service, automation of transactions
         etc.
Previous Council Consideration
Nil.

Finance & Risk
Nil.

Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
The details of each of the Operational Plan activities have been provided by relevant
Departments.
Departments/Sections Consulted:
X      Chief Executive Officer                X   Community Services                 X   Corporate Services
       Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
X      Executive Support                          Community Development                  ICT
                                                  Libraries & Galleries                  Procurement & Fleet
                                                  Local Laws                             Property & Facilities
                                                  Waste & Environmental Health           Revenue Services

X      Executive Office                       X   Planning & Infrastructure
       Community Engagement                       Building & Plumbing Services
       Customer Service                           Civil Operations
       Economic Development                       Infrastructure Planning & Design
       Governance                                 Planning & Environment
       Human Resources                            Strategic Land Use Planning
       Sustainability




                                                                                                     Page 65 of 81

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016


                                                                          Attachment 1




                                                          Page 66 of 81

Attachment 1
OPERATIONAL PLAN 2015-16 PROGRESS REPORT                                                                            Quarter 2: 1 October 2015 - 31 December 2015

WORKING IN PARTNERSHIP WITH OUR COMMUNITY
No. Project                                                             Responsibility                              Uy ete F 1                                                                        Be 1c)
1    Planning and design of Rufous Street Project                       Director Community Services                 Draft Master Plan discussed with key stakeholders at the community meeting on    Ontrack    ©
                                                                                                                    10 December. Architect and Town Planner engaged to finalise the Master Plan
                                                                                                                    and develop MCU application.
2.   Planning and delivery of the Floating Land exhibition              Gallery Director                            Floating Land 2015 festival delivered 29 August - 18 October.                  Completed    @
3    Community Jury - second topic                                      Community Engagement Manager                Second Community Jury completed; Report to Council completed; Council            On track   @
                                                                                                                    decision to be taken January 14, 2016; and Juror Mayoral Reception scheduled
                                                                                                                    for February 2016.

4    Undertake studies for development of new Planning Scheme           Principal Strategic Planner                 A number of planning studies are underway. Briefs being developed for the        On track   @
                                                                                                                    remaining planning studies to inform the new planning scheme. Planning
                                                                                                                    Scheme Project Manager appointed.
5    Trial of electric buses in conjunction with Translink              Director Planning & Infrastructure          Project has been re-scheduled as the lease agreement with Patico was             Behind     @
                                                                                                                    cancelled due to a breach in contract relating to late delivery of vehicles.    Schedule
                                                                                                                    Expression of Interest documentation is currently being prepared for a new trial
                                                                                                                    to begin in late 2016
6    Work with our community by developing local economic initiatives   Economic Development Officer                The development of an implementation plan to accompany the Local Economic        On track   @
                                                                                                                    Plan will commence in January 2016 and be delivered in collaboration with the
                                                                                                                    community.

SETTING POLICY AND STRATEGY
No. Project                                                             Responsibility                              Update                                                                            Status
1    Development and adoption of Noosa Transport Strategy               Infrastructure Planning & Design Manager    Development of the Transport Strategy is underway.    Currently undertaking      Ontrack    @
                                                                                                                    stakeholder and community consultation which will inform development of the 20
                                                                                                                    year vision.
2    Development and adoption of Noosa Local Economic Plan              Economic Development Officer                Noosa Shire Local Economic Plan adopted by Council at the Ordinary Meeting     Completed    @
                                                                                                                    of 17 December 2015.
3    Koala Policy - mapping and policy adoption                         Principal Environment Officer               The USC Koala Survey project is now complete, with data sent to SEQ              On track   @
                                                                                                                    Catchments to inform Koala Mapping Project. The Koala Mapping and Koala
                                                                                                                    Threat Mapping is being finalised and a draft is expected to be available for first
                                                                                                                    review mid January 2016. This will inform the development of the Noosa Koala
                                                                                                                    Conservation Plan.
4    Development and adoption of Social Plan                            Community Development Coordinator           Social Strategy adopted by Council at the Ordinary Meeting on 17 December      [email protected]    Development and adoption of Sustainability Principles              Executive Manager                           Sustainability Principles adopted by Council on 19 November 2015 for the       Completed    @
                                                                                                                    purpose of guiding Council's strategy development.
6    Development and adoption of Library Strategy                       Manager Libraries & Galleries               Awaiting outcome of external service review due February 2016. Consultant        Behind     @
                                                                                                                    David Spearritt working on review of Library service.                           Schedule

                                                                                                                                  Page 66 of 81

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 67 of 81

QUALITY SERVICE DELIVERY
No. Project                                                           Responsibility                               Update                                                                           St)
1    Development of Pomona Disaster Management Plan                    Director Planning & Infrastructure         A draft Pomona Disaster Management Plan was considered by the Noosa Local       On track   @
                                                                                                                   Disaster Management Group at its meeting on 26 November 2015. Further
                                                                                                                  details were requested to be included and reported back in February 2016.

2    Review of options for Council customer service reception area     Executive Manager                          Concept brief drafted and Building Section consulted. Request for quote to be   On [email protected]    Adoption and implementation of Waste Management Strategy          Manager Waste & Environmental Health        Draft strategy to be finalised by March 2016.                                  On track   @
4    Develop tender for next Waste Services Contract                   Manager Waste & Environmental Health        Manager Waste and Environmental Health to go offline from February 2016 to     On track   @
                                                                                                                  focus on developing tender for consideration by Council in June 2016.
5    Undertaking kerbside bulk waste collection service                Manager Waste & Environmental Health        Kerbside collection completed October 2015 and outcomes reported to Council. Completed    @
6    Community engagement focus                                        Executive Manager                           Project and media support provided to 'Have Your Say ‘site and to developing   On track   @
                                                                                                                  comunications plans for major projects including the ‘Zero Waste' campaign.

LOOKING AFTER COMMUNITY ASSETS
No. Project                                                           Responsibility                               Update                                                                          BS) cL t0 Es
1    Refurbishment of Munna Point Bridge                               Project Manager                            Contractors are onsite, progress is to schedule. On track for completion in April Ontrack  (%
2    Replacement of bus shelters to meet disability access standards   Designer - Capital Works                   Contractors are have commenced civil works and program on track for             On track   @
                                                                                                                  completion by end of May.
3    Construction of Dr Pages Road and Kinmond Creek Road              Infrastructure Planning & Design Manager   Contractors are onsite, progress is to schedule. On track for completion in April. On track @

4    Finalisation of high level Asset Management Plans                 Asset Planning Coordinator                 Completed and endorsed by Council at its Ordinary Meeting on 22 October       [email protected]    Delivery of Capital Works Program on time and on budget           Director Planning & Infrastructure         All projects are on track to be delivered as scheduled by 30 June 2016.         On track   @
6    Resolving Noosa North Shore land tenure issues                    Executive Officer                          Council resolution 17 December 2015 provides direction.      Implementation     On track   @
                                                                                                                  commenced but it will take a number of years to complete due to complexity of
                                                                                                                   processes to change tenure and the range of State agencies involved.

                                                                                                                               Page 67 of 81

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 68 of 81

A SUSTAINABLE COUNCIL
No. Project                                                             Responsibility                             Update                                                                           Sect)
1   Development and implementation of Enterprise Risk Management       Governance Advisor                          On 1 December 2015, the Leadership Team held its second strategic risk          Ontrack    @&
     Framework                                                                                                     discussion for the 15/16 period, which included a comprehensive reivew of
                                                                                                                   Council's Strategic Risk Register with regard to possible furture risks to
                                                                                                                   organisation. Managers of Council's various operational branches will undertake
                                                                                                                   a review of operational risks at the beginning of Janurary 2016 in accordance
                                                                                                                   with Council's risk reporting framework.
2    Finalisation of Business Continuity Plans                         Governance Advisor                          Council's Master Business Continuity Plan and the ICT Business Continuity Plan  Ontrack   @
                                                                                                                   were reviewed and approved by the Leadership Team in October 2015.
                                                                                                                   Significant progress has been made towards finalising the Payroll Business
                                                                                                                   Continuity Plan, which is expected to be finalised in January 2016. Progress
                                                                                                                   continues with the development of the draft Cutomer Service, Waste Recovery
                                                                                                                   and Building and Facilities Business Continutity Plans.
3    Improve Workplace Health & Safety performance                      Human Resources Manager                    Draft WH&S Plan is being developed and due for presentation to LT in             Behind   ()
                                                                                                                   February. Temporary WH&S Officers are still assisting and have made good       Schedule
                                                                                                                   progress in updating risk and hazard registers. Signifigant WHS System
                                                                                                                   development is still required but progress is being made.
4    Undertake regular Service Reviews                                  Executive Officer                          Reviews are well advanced but behind schedule. Should be completed in the       Behind      )
                                                                                                                   next quarter.                                                                  Schedule
5    Optimisation of ICT systems                                        ICT Manager                                Printers refreshed. Email migrated to Microsoft. T1 systems progressing.        On track  @
                                                                                                                   Penetration test completed. Records keeping training delivered.
6    Implementation of Financial Sustainability Policy                  Director Corporate Services                2016/17 budget process commenced. Policy parameters will be used to assess      On track  @
                                                                                                                   budget position once base budgets submitted by budget managers.

                                                                                                                               Page 68 of 81

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016        Attachment 2




                                                          Page 69 of 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                  2 FEBRUARY 2016                                                                                       Attachment 2

          QUARTERLY ORGANISATIONAL PERFORMANCE REPORTING
          OUR PEOPLE
          Measure                                                                                      Measure
          Average Lost time injury duration                                                            Council % of LGW
          Purpose                                                                                      Purpose
          Safety of the workplace                                                                      Safety of the workplace
           30                                                                                              3% 5
           25 +
          20                                                                                               2% + ------------------------------------------------------------------
           15                                                                                                                                             SS
           10                                                                                              1% +
            5 +
            °°      :     ‘  5  ‘     :     ‘     ‘     :     ‘     ‘ +   ‘     ‘                          oe
               SS)   yp? oe      et    ©    &       Fe  & we         cS   we    eo                                           2013/14                            2014/15
                                        4                             4

          Comment                                                                                      Comment
          The October data was estimated to be 22 however LGW have published that it was 0 for         Noosa Council falls in the Group D category. In the 2014/15 year, the lowest rate in that
         October.                                                                                      category was 0.905%, the highest rate was 2.083%.
          Measure                                                                                      Measure
          Personal leave total days x month                                                            Accrued Annual Leave weeks (median)
          Purpose                                                                                      Purpose
          Low levels of sick leave can equate to high morale and vice versa                            Potential financial burden if accrued leave is not taken and risk of staff burnout
           500 +                                                                                        6                                                                     eee
           400 -                                                                                        re
                                                                                                        4
           300 +
                                                                                                        3
           200 +
                                                                                                        2 +
           100                                                                                          1

             0                                                                                          0
                 SF   wr gt      FS          KK         Gye         hw          ye                         Sp ot              oF   SK           KS ye             wh    WF    vy”
          Comment                                                                                      Comment
                                                                                                       27 staff members currently have a leave balance in excess of 8 weeks (an increase from
                                                                                                       the November figure of 25)

                                                                   Benchmark is shown by red line, Previous year data is shown by purple line

                                                                                                                                 Page 69 of 81

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 70 of 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                2 FEBRUARY 2016

        Measure
        Staff turnover rate as percentage of establishment level
        Purpose
        To track staff turnover over time and identify trends

         12% +

         10% +

          8% +

          6% +

          4% 4
          2% |                       =
          0% 4
                     Sept              Dec              March             June
        Comment
        Benchmark shows 2014 average for category 4 Councils. Figures reported on a quarterly
        basis.

                                                                  Benchmark is shown by red line, Previous year data is shown by purple line

                                                                                                                               Page 70 of 81

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 71 of 81

OUR CUSTOMERS

Measure                                                                                                  Measure
 Number of requests received x month                                                                     % of requests completed within target date x month
Purpose                                                                                                  Purpose
 Level of customer demand & whether service levels appropriate                                           Indicator of whether service levels are satisfactory

  1750                                                                                                    100%

  1500 +
                                                                                                           80% +
  1250 +
  4000                                                                                                     60% +

   750 +                                                                                                   40%
   500 +
                                                                                                           20%
   250 +

      0+       :     :      :            :                  :           :      :                            0% -       :                         .     :                        .
         Spe         oo    oF      GS  oF        MK  Sy           wh WF       yl                                 Sp oo             oF     th            MSL                Fe        vr
                                                                                                                                             =           Ss

 Comment                                                                                                 Comment

 Measure                                                                                                 Measure
 Average seconds of wait time in phone queue                                                             % of planning applications decided within 20 business days
Purpose                                                                                                  Purpose
 Service timeliness / capacity to respond                                                                Service timeliness
  120                                                                                                      100%

                                                                                                            80% +
   90 -
                                                                                                            60% +

   60 +
                                                                                                            40%
   30 + |                                                                                                   20% +
     0+                                 r                   :     .                                          0% +                          .                         .
         ws         oe              3           S     <P             SS         oe                                          Oct                        Nov                      Dec
        y     w            oe    we     &      wv    &    we      we     Ww    ys                           wMCU     Reconfiguration    Op Works     mOp Works (Veg)     PBA     RAP     w Total

                                                                                                         Comment
                                                                                                         Of the 24 MCU applications decided this quarter, 14 were decided after the first 20 business days, with 8 of
                                                                                                         these submitted to a Council meeting. During Nov and Dec, 8 Reconfiguration applications were decided, 4
                                                                                                         were decided after the first 20 business days, with 2 of these submitted to a Council meeting. The
                                                                                                         Operational Works applications which were not decided within the 20 business days for this quarter were
                                                                                                         extended at the applicant's request in order to pay a bond or provide additional information for assessment.
                                                                                                         For those RAP applications decided outside the timeframe, changed plans were negotiated during the
                                                                                                         decision period

                                                                 Benchmark is shown by red line, Previous year data is shown by purple line

                                                                                                                                             Page 71 of 81

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 72 of 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                          2 FEBRUARY 2016

     Measure                                                                                    Measure
     % of building information requests completed within 10 day statutory time                  Average processing time 20 day plumbing applications
     frame
     Purpose                                                                                    Purpose
     Service timeliness                                                                         Level of activity & service

                                                                                                20
      100%

      80% +                                                                                     15 4

      60% +                                                                                     10 +
      40% +
                                                                                                  5 +
      20% +

        0% +      -    .     .    .     7    7     7     r    r     r    r                       0 +      r     1     r     7     T           T     r    r     T           1
            S     pw ot      &    wo    of     ow      ro     &    yw    ye?                        Sp          of    &     S     &     S        ye       @®   ww    yt
     Comment                                                                                    Comment
                                                                                                Above 2014 results but still well below statutory requirement

                                                             Benchmark is shown by red line, Previous year data is shown by purple line

                                                                                                                        Page 72 of 81

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 73 of 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                        2 FEBRUARY 2016

    OUR FINANCES

    Measure                                                                             Measure
    Investment return 0.25% above benchmark (UBS Bank Bill index)                       Rate arrears ratio <5%
    Purpose                                                                             Purpose
    Performance of invested ratepayer funds                                             Measures the efficiency of Council's collection of rates and charges

     1.0%
                                                                                         40%
     0.8%
                                                                                         30%
     0.6%

     0.4%                                                                                20% |

     0.2%                                                                                10% +

     0.0%                      r    r                    r                                0% +     r    r                                                r
          Ss   pr ot      oF   wt   oF    ww       we    w    yw   ye?                        ws   pr gt      oF   wt   of     Ww      ys     ws   ye   ye
    Comment                                                                             Comment

    Measure
    Working capital ratio > 2 (times)
    Purpose
    Measures Council's ongoing solvency

     14 +
     12 4
     10 =
     8
     6 -
     44
     2 +

        Sp co           oF   St    gh    SF    SF   Fr sh    Wt    ys”
    Comment

                                                        Benchmark is shown by red line, Previous year data is shown by purple line

                                                                                                                      Page 73 of 81

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 74 of 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               2 FEBRUARY 2016

    OUR SYSTEMS & PROCESSES

    Measure                                                                           Measure
    % of requests for service that were lodged online                                 Number of online payments made via Council's website
   Purpose                                                                            Purpose
    Identify growth of online services                                                Identify growth of online services
     100% »———                                                                        2500 +
                                                                                      2250 +
      80% +                                                                           2000 +
                                                                                      1750
      60% +                                                                           1500
                                                                                      1250 +
                                                                                      1000
      40%                                      a a TS                                 750
                                                                                       500 +
      20% +    11%      13%       12%       14%       14%       14%                    250 -
            ied          dtd                          ll                                 Ape ewe eee.
       oe      July      Aug   /  Sept   /  Oct    '  Nov    : Dec                          »    ve  & oF       ~    oe    se   & we    if     a    vv
    Comment                                                                           Comment

                                                      Benchmark is shown by red line, Previous year data is shown by purple line

                                                                                                            Page 74 of 81

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      2 FEBRUARY 2016



Economic Development


11                       LOCAL ECONOMIC PLAN IMPLEMENTATION PLAN
DOCUMENT INFORM AT ION




Author                             Senior Economic Development Officer, Carolyn Bullen
                                   Executive Office

Index                              ECM / Subject / Economic Development

Attachments                        1.    Noosa Shire Local Economic Plan – Implementation Plan


EXECUTIVE SUMMARY
Not Applicable


RECOMMENDATION
That Council note the report by the Senior Economic Development Officer to the Planning &
Organisation Committee Meeting dated 2 February 2016 and note the Noosa Shire Local
Economic Plan – Implementation Plan.


REPORT

1.                       Background

Council adopted the Noosa Shire Local Economic Plan (LEP) at its Ordinary Meeting of 17
December 2015, following a process of:

                       development in collaboration with the community and key stakeholders including a
                         Local Economic Plan Focus Group;
                       an economic profile; and
                       a series of Councillor workshops.

At its meeting on 18 December 2016, the Council requested the Chief Executive Officer to
develop an Implementation Plan to support the LEP.

The LEP continues the focus on industry sectors of high economic value and low
environmental impact and builds on the success of previous plans and economic strategies
including the Noosa Community Economic Sector Plan 2002-2015; the Economic Strategies
and Innovation Implementation Strategy 2004-2007; and the Sunshine Coast Regional
Economic Plan 2013-2033 during the period of amalgamation.




                                                                                               Page 75 of 81

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


2.   Implementation Plan

As outlined above, it should be noted that the LEP builds on the work undertaken in earlier
economic strategies. As such, this implementation plan does not start from scratch. It aims
to:-

   Continue initiatives already underway which support the LEP;
   Identify some “low hanging fruit” issues in the LEP which can be commenced
     immediately without any additional financial resources;
   Identify other LEP initiatives that can be initiated immediately using the $60,000# which
     was allocated by the Council in the 2015/16 budget for implementation of the plan;
   Identify what other high priority LEP initiatives can be considered by Council in the
     2016/17 budget process; and
   Identify what other LEP initiatives (lower priority issues##) can be done in future years.
#
  Council allocated $60,000 in the 2015/16 in anticipation of the LEP being finalised during
the 2015/16 financial year. Council recognised that it would want to commence some
initiatives during the financial year rather than waiting until the next budget to begin
implementation. Council also allocated $10,000 towards preparation of the LEP but only
$2,500 as much of the work on the plan was done in-house.
##
  The LEP identified that is was not possible for everything to be done straight away. The
LEP identified 4 different categories of priorities:-

   Ongoing – initiatives already underway and to continue through the life of the strategy;
   Priority 1 – focus for years 1 to 3 of the LEP;
   Priority 2 – focus for years 2 to 4 of the LEP;
   Priority 3 – focus for years 2 to 5 of the LEP.

The LEP Implementation Plan (refer Attachment 1), identifies current, early implementation
and priority 1, 2 & 3 projects that will be implemented across a 5 year time frame. It also
notes the Council branch responsible for delivery of specific projects and budget estimates
across the remainder of the 2015-16 financial year and upcoming 2016-17 financial year. It
also provides a description of the project and its objectives.

The projects contained in the LEP Implementation Plan will be delivered in collaboration with
the community and key stakeholders. The LEP identifies priority economic areas and key
industry sectors, namely:-:

   Industry Diversification Priority Sectors
     -     Health & Wellbeing
     -     Digital Economy
     -     Environmental Industries
     -     Rural Enterprise
     -     Creative Industries
     -     Professional Services
   Effective Land Use Planning
   Enterprise Support
   Essential Infrastructure
   Skilled & Connected Businesses.




                                                                                    Page 76 of 81

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             2 FEBRUARY 2016


The LEP recognises that it is not only Council that will be implementing all of the initiatives in
the LEP but that a range of other organisations will be involved (e.g. RDA Sunshine Coast,
CCIQ Noosa, Tourism Noosa etc). Council’s role in the LEP projects will vary depending on
the type of initiative. For example, as identified in the LEP, Council may have the following
roles:-

    Advocate;
    Regulate;
    Partner;
    Facilitate;
    Deliver/Fund.

Consistent with the LEP, the Implementation Plan projects will support:

    diversifying the structure of the local economy to grow smart, high value industry
      sectors, particularly those that export outside of the Noosa Shire to limit exposure to
      sudden and/or unexpected negative changes in industry sectors;
    replacing population driven economic growth with growth in industry sectors that have
      high economic value, particularly those that have a low environmental impact and that
      export outside of the Noosa Shire;
    encouraging business growth in sectors that provide a wide range of employment
      options;
    utilising the strong Noosa brand to grow nominated priority industry sectors;
    leveraging local expertise to support the diversification of the local economy;
    exploring collaborative industry-driven models to deliver local economic development;
    exploring new models to fund local economic development; and
    establishing and/or strengthening existing alliances with stakeholder organisations and
      institutions and governments to leverage resources.

3.    Resources

Council already delivers a number of services, programs and activities across the
organisation that contribute to local economic activity. These include:-

    land use planning;
    infrastructure – examples of current projects include Dr Pages Road, Main
      Beach/National Park Boardwalk refurbishment, Cooroy RV Stop Over;
    economic programs and initiatives – examples of current projects include support for
      innovation networking nights, business awards etc;
    development of ICT nodes – example of a current project is the Rufous Street Project;
    major events funding for the Noosa Triathlon;
    local procurement policies supporting local business;
    management of the Tourism Levy including funding for events;
    transport planning including the development of the Noosa Transport strategy; and
    management of precinct based business levies such as the Hastings Street levy and
      the Noosa Junction Levy.




                                                                                       Page 77 of 81

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            2 FEBRUARY 2016


The LEP Implementation Plan recognises that there are already a number of specific
projects currently underway across the organisation:

   regional projects
     -     business awards & expo;
     -     digital Sunshine Coast, infrastructure and skills development;
     -     agribusiness connections/networks;
   agribusiness sector profile;
   agriculture land use study; and
   advocating for improved internet and mobile connectivity.

It should be noted that the funding referred to in Attachment 1 only relates to specific
projects through the Economic Development Budget. Land use planning, infrastructure
projects, projects such as Rufous Street etc, are accounted for within other relevant
department budgets.

An allocation of $60,000 was made within the Economic Development budget to commence
implementation of the LEP in the 2015-16 financial year. There was also an amount left
over from the LEP development budget. This funding is proposed to be directed to the
following projects identified as priority 1 in the LEP:

   business assistance toolkit;
   business networking event;
   economic prospectus;
   industry sector economic profiles; and
   project management resources to commence planning on 2016-17 financial year
     projects to:
     -     explore establishment of an economic group;
     -     establish a business development grant fund; and
     -     establish a digital economy group.

Remaining priority 1 projects identified the LEP will be submitted by Economic Development
for consideration by Council as a part of the 2016-17 budget process. These include:

   maintaining up-to-date economic data and information for monitoring and tracking;
   establishing a single point of contact within Council for business;
   establishing a local economic group;
   establishing a business development program;
   establishing a business development grant fund;
   establishing a digital economy reference group;
   developing local food systems and establishing Noosa food and beverage branding;
   creative industries skills and industry development;
   supporting regional projects; and
   project management/assistance.

The LEP Implementation Plan has not assigned budget estimates to projects identified as
priority 2 and 3 because of the extended 5 year time frame of the LEP, and due to the review
and reporting process noted in the LEP where an annual review will be undertaken and the
plan updated if necessary. Therefore, future budget allocations will be considered as a part
of the annual LEP implementation planning and Council’s annual budget process.




                                                                                   Page 78 of 81

Section 79

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          2 FEBRUARY 2016


Previous Council Consideration

Ordinary Meeting, 19 November 2015, Item 7, Page 17
That Council note the report by the Senior Economic Development Officer to the Planning
and Organisation Committee meeting dated 10 November 2015 and
A.    Approve the “Draft Noosa Shire Local Economic Plan” for the purpose of public
      exhibition and comment; and
B.    Request the Chief Executive Officer to collate and consider the feedback received for
      inclusion in the Noosa Shire Local Economic Plan
Ordinary Meeting, 9 April 2015, Item 2, Page 7
That Council not the report by the Senior Economic Development Officer to the Planning &
Organisation Committee Meeting dated 31 March 2015 and
A.    Agree to the development of a Noosa Shire Local Economic Plan
B.    Undertake a community engagement process to develop the Noosa Shire Local
      Economic Plan as Proposed in Attachment 1
C.    Appoint Cr Bolton and Cr Jurisevic as members of the Project Focus Group; and
D.    Authorise the Chief Executive Officer to appoint the members of the Project Focus
      Group after consulting with the Mayor and Councillors.

Ordinary Meeting, 17 December 2015, Item 4, Page 11
That Council note the report by the Senior Economic Development Officer to the General
Committee Meeting dated 14 December 2015 and
A.    Adopt the Noosa shire Local Economic Plan, provided at Attachment 1; and
B.    Authorise the Chief Executive Officer to develop an Implementation Plan to support the
      Local Economic Plan by 12 February 2016; and
C.    Authorise the Chief Executive Officer to make any minor amendments to the Local
      Economic Plan prior to publication.

Finance & Risk

The financial and risk implications of this Implementation Plan will be addressed as a part of
the annual planning and budget process. The development of new initiatives for budgeting
purposes is underway.

Consultation

External Consultation

Nil

Internal Consultation

Consulted in the development of the LEP - Implementation Plan were:
  Chief Executive Officer
  Executive Manager




                                                                                    Page 79 of 81

Section 80

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              2 FEBRUARY 2016



Departments/Sections Consulted:

×   Chief Executive Officer                Community Services                 Corporate Services
    Executive Officer to the Mayor & CEO   Community Facilities               Financial Services
    Executive Support                      Community Development              ICT
                                           Libraries & Galleries              Procurement & Fleet
                                           Local Laws                         Property & Facilities
                                           Waste & Environmental Health       Revenue Services

×   Executive Office                       Planning & Infrastructure
    Community Engagement                   Building & Plumbing Services
    Customer Service                       Civil Operations
    Economic Development                   Infrastructure Planning & Design
    Governance                             Planning & Environment
    Human Resources                        Strategic Land Use Planning
    Sustainability




                                                                                          Page 80 of 81

Section 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   2 FEBRUARY 2016




                                                          Page 81 of 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                  2 FEBRUARY 2016

     an       NOOSA COUN                                                   OOSA SHIRE LOCAL ECONOMIC PLAN - IMPLEMENTATION PLAN                                                                                                                               ee
     un                                                                 N
                                                                                                                               5G                             2016-17

                                                                        Special Projects -
                                                                        Fox Rogers                                                                                                                                                                                       ‘To enable - collaboration and clustering in digital industires; the use of technology in business and
                  Establish ICT driven work hubs in Noosa Shire         Rufous St          Exisiting                                                                                     Ongoing development                                                             additional education and training opportunities
                                                                                                                                   =                                                                                                                                     'To advocate for increased access to high speed broadband, facilitate the development of workforce
                  Regional digital economy projects                     EcDev              $7,500                                                                                         In collaboration with RDA - skills development, infrasture development         training that meets the needs of industry
                                                                                                                                                                                                                                                                         'To produce a publically available document that profiles the agri-business sector in Noosa Shire that can be
                  Agribusiness sector profile                           EcDev              $1,500                                                                                        Currently under development                                                     used to promote the sector and inform decision making by key stakeholders.
                                                                                                                                                                                                                                                                         To establish a networks  that allows individual businesses to address common problems, develop}
                  Development of agribusiness networks                  EcDev              Existing                                                                                      Transitioning to new LEP work program 2016-17                                   opportunities and improve their competitive position
                  Connecting   gribusiness supply chains                EcDev              $2,000                                                                                         Re gional network connections                                                  Develop regional supply chain connections, business collaborations and promotion
                                                                                                                        mh                                                                                                                                               To highlight the various and sometimes competing values of the rural parts of Noosa Shire; provide an|
                                                                                                                                                                                                                                                                         understanding of the current agricultural sector within Noosa Shire and influences affecting this sector.
                                                                                                                                                                                                                                                                         consider the physical needs of primary production; evaluate the productive capacity of rural lands in Noosa
                                                                                                                                                                                                                                                                         Shire and the opportunities and challenges for protecting and growing the agriculture sector both on and off|
                  Finalise Agricultural Land Use Study                  ISLUP/EcDev                                                                                                       Led by Strategic Land Use Planning                                             good quality agricultural lands.
    1.2.6         ‘Support food tourism projects                        EcDev                                           pT atching tries                                                                                                                                 Facilitate the development of food tourism projects that increase demand for local produce
                                                                                                                                                                                                                                                                         Facilitate the improved access to information and communications technologies such as the internet, mobile.
   4.1            Advocate for improved internet & mobile connectivity  EcDev              Exisiting                                                                                     Transitioning to new LEP work program 2016-17                                   data and sensor networks
                  Transport Strategy                                    IFS                                                                                                       _recin as part of asset management and maintenance programs                            To sustainably shape the Shire's transport development over the coming two decades,
   51           [Advoeate or rssvaton of TAFE stg                     oso                  Existing      =
   ae             ‘Community assets maintenance                         IFS                Exisiting                                                                                 eee under development                                                               Ensure the provision of infrastructure is appropriate to meet the nededs of business and visitors
   |            existing 2015-16 budget                                                   st 500
    3.3, 3.5                                                                                                            _          aa                                                      reate an online business assistance toolkit that connects  business to          ‘onnect loca businesses to information and support programs that have the potential to positively
                  Business toolkit                                      EcDev              $5,000                                                                                       services providers                                                               impact on the development of their business
                                                                                                                                                                                          Hold a business networking event to introduce the Local Econmic Plan; Business
                                                                                                                                                                                         Toolkit; and a range of assistance programs available provided by goverment     ‘To connect local business to the range of business assistance programs and services by provided
    3.8, 3.9 5.2  Business networking event                             EcDev              $5,000                                                                                        agencies and business organisations                                             government agencies and business organisations
                  Project management and administration support         EcDev              $20,000 *      $120,000      _                                                                 Engage project coordination resources to commence project planning for key 2016. 'To ensure projects identified in this Implementation Plan are delivered on time
                                                                                                                                                                                          17 PMI's
    1.3.2,
    1.4,1.4.7,1.5,                                                      Strategic Land                                                                                                    Establish an expert business reference group to provide input into the development|To engage the local business community to ensure the next Noosa planning schemd reduces red
   6.3, 2.1,      Business Reference Group - Next Planning Scheme       Use Planning                                                                                                     of the next Noosa Shire planning scheme                                         tape and provides a level of flexibility and business certainty
                  Develop economic prospectus, leveraging Noosa brand                     mp                                                                                                                                                                             'To grow and diversify the local economy by providing a tool to inform business investment;
                                                                                                                                                                                         Create an easily accessable document that profiles the local business environment informing prospective and exisiting businesses; positioning Noosa as a preferred business location;
                  awareness for business development                    EcDev                                                                                                            and factilities and services and Noosa's lifestyle, environmental, cultural features leveraging the Noosa brand to promote business in Noosa
                                                                                                                                                                                                                                                                         'To enable the seamless transfer of information with the business community, contribute to the ease
                                                                                                                                                                                          Establish a facilitation service within Council that provides a single point of contact of doing business in Noosa; position Noosa as a preferred location for business; deliver a higher
                  ‘Single point of contact for business - One Stop Shop EcDev                                                                                                            for exisitng and intending businesses                                           quality service to businesses
                                                                                                                 =
                                                                                                                                                                                          Explore the establishment of a leadership group to drive economic development in |Grow and diversify the local economy by utilising the skills, capabilities and resources that exist
                  Local economic group/entity                           EcDev                                                                                                             Noosa Shire, identifying potential roles, management models and funding streams. |within the local community.
                                           SP                                                                                                                          =                                                                                                 performance and inform business decision making
                  Sector profiles, economic data & information          EcDev                                                                                                         each an on-line economic data and information library.                             'To better understand the economic impact of key industry sectors, track and monitor economic
                                                                                                                                                                                         |A multi tiered business development program targeted at innovation and
                                                                                                                                                                                         entrepreneurship that includes an innovation master class, curated content for start:
                                                                                                                                                                                         up businesses and young entreneurs events
    3.7 A&B       Business development grant fund                       EcDev                             $60,000*                                                                            ec   a competitive funding program that supports not for profit organsiations |To leverage community resources to facilitate business development, and enable the business
                                                                                                                                              PCS associations to implement business development projects                                                                organisations to take an active role in projects that positively impact the business community
                                                                                                                                                                                          Establish a Digital Economy Reference Group to provide expert opinion and
                                                                                                                                                                                         direction to Council in the specialist area of information and communication    'To grow the local economy through improved broadband connectivity, digital services and data
    1.1.4         Digital Economy Reference Group                       EcDev                            '$15,000'                                                                       techmologies such as broadband, mobile and data access                          laccess across the Shire; and encourage and accelerate business take-up of digital technologies
                  Noosa Food & Beverage Branding, Food System                                                                                                                            Continue to strengthen and develop the local food system through projects that  'To grow the local economy through the establishment of a Noosa Food and Beverage brand
    1.2.7         Developoment                                          EcDev                             $20,000                                                                         increase the promotion, production and sale of locally produced food & beverage lconnections and improved local supply chains and the development of rural networks
                                                                                                                                                                                          Develop a creative industries profile that identifies the economic, social and 'To better understand the economic impact, strengths, challenges and opportunities in the sector, to
    1.5.1         Creative industries profile                           EcDev                             $10,000                                                                        cultural impacts of the sector                                                  inform subsequent sector projects
                                                                                                                                                                                         ‘Work with business and industry to identify projects that support increased    [To work with key stakeholder to identify and develop collaborative projects that have a positive
    1.5.3         Creative industries skills and industy development    EcDev/ComDev                      $5,000                                                                         economic activity in the Creative Industries sector                             impact on the development and expansion of creative industries businesses
                                                                                                                                                                                         Support relevant projects being led by other levels of government, councils or  'To leverage regional resources in the delivery of projects that have a positve impact on Noosa
                     gional projects                                    EcDev                            ‘$20,000                                                                         regional organisations where there are shared priorities                       businesses
                                                                                          is65,000_     [sats.000     | |
    Current 2015-16 budget dedicated allocation for LEP Implementation                    SS
                  Health and wellbeing - sector profile                 EcDev
                  Health and wellbeing industry forum and industry
                  development program                                   EcDev
                  Explore development of a centre of excellence in aged
                  care                                                  EcDev
                  Mayors Innovation & Entrepreneurs Awards              EcDev
  ss legenowwandonaneatn cow |
                        ee a
             iar
   [1.3.1 1.3.3 |Environmental industries sector profle, _—fEcDev_ J
    2s            sowiopmentprgam                                      feces YF                                           PP
                                                                        a
                                                                                                          * Project Management to commence planning selected projects identified to commence in the 2016-17 financial year

                                                                                                                                                    Page 81 of 81

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗