SUPERSEDED Council Decision - Changes - old apps - 005.1995.00001490.004 [As Published] · 51995.1490.04
3. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
4. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
Landscaping
5. The existing landscaped garden to the pool courtyard shall be retained.
Earthworks
6. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the
additional ponding of water on any adjoining lands or the blockage of, or interference
with, any natural watercourses.
7. Earthworks carried out on site shall not affect the structural integrity of any of the
existing fences and/or structures and/or services and/or lands that border the
development site. Fences that are affected shall be replaced prior to the Building
Certifier issuing the Certificate of Classification.
Erosion and Sediment Control
8. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing and controlled disposal of waste, will
be necessary.
Noise Nuisance
9. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure
or located in a manner which prevents a noise nuisance beyond the subject land in
accordance with the nuisance provisions of the Environmental Protection Regulation
1998. On the spot fines apply for such offences.
Further Permits Required
10. Prior to the commencement of development, a Development Permit for Building Works
must be obtained.
C. Include the following Advisory Notes 1 & 2
ADVICE FOR INFORMATION PURPOSES ONLY AND ARE NOT CONDITIONS OF
APPROVAL.
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999
and Local Law No. 12, prevents a builder or building contractor carrying out building
work on a building site in a way that makes or causes audible noise to be made from
the building work:-
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Council Decision - Changes - old apps - 005.1995.00001490.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11 KB (small file)
- File type
No other editions are linked here.