Council archive · source document
4. 220148 - Slope Stability Report (2) · 132006.2554.01
Seachange Builders 22134-001-Rev0
26 April 2022
Design drawings supplied to us (Seachange Builders, Ref. 2021-73.1, Sheet Nos. 1 to 17, Revision 3,
dated 16 January 2022) indicate that the proposed development will include the following:
At the sub floor level, a wet edge pool to the rear up to 1.8 m deep, a wine cellar and a lift
connecting the three levels of the building.
New kitchen and bathroom areas on the ground floor.
Realigned bedrooms and bathrooms across the first floor.
Construction is generally expected to comprise of lightweight materials (e.g. timber framing, sheet metal
roofing) but with masonry construction around the lift and new swimming pool. The construction footprint
will generally not extend outside the current building area. No earthworks details were available at the time
of reporting; however, provided drawings indicate excavations for the new pool and underground services
may range up to about 2 m deep. Minimal filling is anticipated other than backfilling around the pool and lift
pit/wine cellar areas.
The property has existing connections to town water and sewerage. A site layout plan and some cross-
sectional views for the proposed extensions are shown in Text Figure 2 below.
Text Figure 1: Rendered view of frontage (upper) and proposed sub-floor layout plan (lower)
2/12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
4. 220148 - Slope Stability Report (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.