4. 220148 - Slope Stability Report (2) · 132006.2554.01
Seachange Builders 22134-001-Rev0
26 April 2022
2 is our qualitative assessment of landslide risk for the development site. A summary of qualitative
terminology for use in assessing risk to property is attached (taken from AGS 2007).
Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)
Assessed
Hazard Likelihood Consequence Risk Comments
Given the low to moderate gradients around the
proposed development area it is considered Unlikely
1: Failure through very loose to that a landslip would develop in these materials,
loose natural sands above the Unlikely Medium Low subject to implementation of the recommendations in
foundation depth. Section 4. It is assessed that there could be a
potential Medium impact from such instability so the
resultant risk would be Low as per AGS 2007.
The likelihood of a deep failure through the medium
dense (or denser) natural sand below the proposed
foundation depth is assessed as Rare due to the lack of
2: Deep failure through the
precedence of such movements locally, no signs of any
medium dense (or denser) sands Rare Major Low
existing slope instability and apparent lack of
below the foundation depth.
groundwater. Although the consequence of such a
failure could be Major, the resultant risk is Low as per
AGS 2007.
The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.
4.0 RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.
4.1 Site Layout and Development Limitations
Should any revisions be made to the proposed extent of the renovations as described in Section 1.1, Tectonic
must review these prior to construction to assess if there are any impacts on slope stability.
No earthworks details were available at the time of reporting; however, provided drawings indicate
excavations in the order of about 2 m depth may be required for the new pool and underground services.
Minimal filling other than backfilling around the pool and lift/wine cellar walls is anticipated. Should proposed
cuts/fills exceed these quantities, Tectonic must assess the impacts on slope stability before construction.
4.2 Earthworks
4.2.1 Site Preparation and Trafficability
In construction areas, any relict construction elements, vegetation, tree stumps and large roots should be
stripped and ‘grubbed out’. Any organic rich topsoil should also be stripped and removed from site. Organic
topsoils and garden soils must not be re-used as structural fill; however, small volumes may be retained on
site for later use across landscaping areas, if required.
The natural subgrade following stripping will likely be in a loose condition. Where slab on ground
construction is proposed the ground surface should be compacted by several passes of a vibrating plate
compactor or small smooth drum roller (or similar), in conjunction with surface application of ample water.
Care must be taken with the use of vibratory equipment to ensure that there are no adverse impacts on
surrounding structures and underground services. The impacts from ground vibration must be closely
monitored and managed during construction. It would be prudent to conduct a dilapidation survey of
neighbouring structures prior to commencement of construction.
8/12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
4. 220148 - Slope Stability Report (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.