                                                                               MWA Environmental




       The shed preparation activities typically occur during daylight hours.

       The Hayes Traffic Engineering report1 indicates that bird deliveries are
       typically undertaken using semi-trailers and feed deliveries using 19m B-
       doubles.

       Litter deliveries are commonly made with a walking floor semi-trailer to
       deliver litter directly into the shed.



       3.1.3      FEED DELIVERIES

       Feed (grain) is stored within silos adjacent to the poultry sheds. Feed is
       transferred to silos using a truck-mounted blower system.

       The demand for feed increases with the bird mass in the sheds throughout a
       batch. A typical profile of feed delivery requirements through a batch for the
       8 shed farm is provided in the, as follows:

              Week 1: 2 deliveries
              Week 2: 3 deliveries
              Week 3: 5 deliveries
              Week 4: 6 deliveries
              Week 5: 10 deliveries
              Week 6: 10 deliveries
              Week 7: 24 deliveries


       Feed deliveries typically occur during daylight hours.

       Hayes Traffic Engineering report indicates that the delivery of grain will be
       using 19m B-doubles.

       Typically only the delivery driver would be on-site for feed deliveries.



       3.1.4      DEAD BIRD MANAGEMENT

       Dead and injured birds are removed from the sheds at least once per day by
       the farm manager.




1 Traffic Engineering Report 11347 - MCU: Agricultural Use Poultry Farm - Milligan Farms (Hayes Traffic
Engineering, June 2013)



Ridgewood 12-002                                  8                            11 September 2013
Log in to download the original file

Ridgewood_12-002_PrelimOMP_110913.pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.