Skip to the record
Accept no substitutions.

Original source · versioned page text

Ridgewood_12-002_PrelimOMP_110913

of 36

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                  MWA Environmental




     3.2.2    LITTER APPLICATION

     The only direct integration of the proposed poultry farm and the existing
     avocado orchard is the re-use of spent litter from the poultry sheds as
     fertiliser / mulch within the terraced orchard area.


     Timing

     Following removal from the poultry sheds, the spent litter will be stockpiled
     and turned for a period of up to 4 to 5 weeks prior to application. Under the
     proposed operational timeframe, all litter is to be spread within 4 to 5
     weeks of being removed from the sheds to ensure that odour emissions
     do not coincide with peak emissions from the following batch of birds.

     If, due to unforeseen circumstances, litter is not able to be spread within the
     available 4 to 5 week period then in the event of odour nuisance, the litter
     may be removed from the site by a regulated waste transport company as
     occurs for many broiler farms that do not have to ability to reuse the material
     on-site.


     Volume

     Based upon a full replacement of litter from all sheds at the end of the batch
     and a conservative 75mm depth of litter the potential litter volume is
     1027m3. This volume of litter is to be spread at a depth of 0.05m over an
     area of approximately 2.0ha. The average footprint of each tree is 5m x 8m
     (i.e. 40m²); therefore each batch of litter will compost approximately 500
     trees. With 5.8 cleanouts of the sheds each year there will be in the order of
     2900 trees composted each year.

     An audit of the trees for the purpose of legal proceedings disclosed that
     there are 6,651 avocado trees in production and numerous additional trees
     in the orchard (refer to Alwyn Peffer & Company Pty Ltd correspondence
     included as Attachment 3). Advice from the applicant is that a conservative
     estimate would be an additional 1,100 wind break and planted native trees
     within the orchard that are currently fertilised and maintained. The existing
     tree count within the orchard for application of the litter as fertiliser is well
     over 7,000.

     Several areas previously planted to mango trees are lying fallow with
     terracing and irrigation in place; it is intended that these areas are to be
     planted to avocados with approximately 3,500 additional trees to be planted.
     As such, the capacity of the orchard is considered to be sufficient to accept
     the volume of litter that will be produced by the poultry sheds.




Ridgewood 12-002                        15                        11 September 2013
Log in to download the original file

Ridgewood_12-002_PrelimOMP_110913.pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.