2.0 CONSTRUCTION PHASE
The construction phase of the development would be expected to progress
through the following stages:
• Initial clearing and preparation for earthworks using heavy machinery such
as bulldozer, tractor, excavator etc.
• Bulk earthworks to prepare pads for poultry sheds and form internal
roadways and stormwater management system using heavy machinery
such as bulldozer, excavator, grader etc.
• Construction of sheds including steel framing, insulated wall panels and
insulated roofing.
• Fit-out of mechanical ventilation and computer control system, heaters,
feed silos, feed system and drinker system.
• Commissioning testing.
The construction phase of the poultry farm involves significant earthworks and
structures and will be managed by the contractor in accordance with a
construction management plan. It is not feasible to provide such detail at
development application stage.
Environmental impacts during the construction phase of the project will be the
responsibility of the contractor and managed under a construction Environmental
Management Plan which addresses issues including:
• Stormwater Management (sediment control)
• Dust Management
• Noise Management
• Waste Management
Typically a construction Environmental Management Plan is prepared by the
contractor prior to commencement of works.
Ridgewood 12-002 5 11 September 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.