Skip to the record
Accept no imitations.

Council archive · source document

07/1812 - Preliminary Building works assessable against planning scheme [As Published] · 172007.1812

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

a

  

INTEGRATED PLANNING ACT 1997

‘SEQ Regional Plan .

-For more information refer to schedule 2 of the
AP Reguiation. 7

Refer to. Chapter 2; part SA and schedule 10 of.

the'Inteqrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for felevant

déhnitons. n

Answered " “no ne of the above” 7
"020; thé: ‘application requires. assessmient by the

Office it Urban Management (OUM).

 

So ery.

:
a
& .
t

 

 

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable boxes) - ‘
1 (i) amaterial change of use of premises — ;
(a) ina Major Development Area in the Urban Footprint for -
J (i) an urban activity -
[)_ inan area inclided in a structure plan where the IPA, section 3.1.6
applies;
(1 in an area not included in a structure plan where -
“the IPA, section 3.1.6 applies to the application for the material change
of use; or .

« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant planning scheme”

CI (i) intensive animal husbandry, or
£1 (ii) residentiat development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
C (i) anurban activity and not specified i in section 2.4(2); o
(J (ii) residential development involving a rural resdentep purpose and not
specified in section 2.6(2) :
{c} in the Rural Living Area for an urban activity and not specified in section. 2.8(2);

. (d) in the Investigation Area for -
J (i) an urban activity and not specified in section 2.10(2);

CD (ii) residential development involving a rural residential purpose and not
specified in section 2,12(2); o

C) (iii) intensive animal husbandry
0 iii) reconfiguring a lot- /
* On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and

(b) not specified in section 3. 2).
or none of the above

 

 

‘Fisheries matters

. For more information refer to schedule 2of the {P
; Regulation, .
“Unless you answered“none of the above" to

“#,Q21, the application requires assessment by the

“Department of Primary Industries and Fisheries

; Felation to-items (i) — (iv) and an advicé agency
‘in relation to item {v).

(DPI&F},

If an agency other than DPI&F is the assessment}
Manager for the application, DPI&F is a
concurrence agency for the application-in

 

.21. The application involves: (tick the applicable boxes)

C1(i) anassessable material change of use for aquaculture - complete Part O; of Form 1;

Ci iii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;

Ci) assessable operational work completely or partly within a declared fish habitat area.
complete Part O2 of Form 1;

Cl {iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

(CJ (vy) Aevelopment assessable under the IPA, “schedule 8, part 4, on land that adjoins a -
declared fish habitat area:

(vi) none of the above.

 

Page7

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1812 - Preliminary Building works assessable against planning scheme [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.