INTEGRATED PLANNING ACT 1997

 

  

6

IDAS Assessment Checklist, Version 20, 2 April 2007

XN

 

 

 

 

 

 

 

 

 

 

designated rainwater tank area
For more information go to schedule 2 tabte 1 of the
iP Regulation and the QOC part 25.

Assessment period 15 days, No response is a
deemed retusal.

 

Whether paiticular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a:

occupied for residential purposes referral to the local government as the concurrence agency.

For mara information go to schedute 2 table 1 of the

{P Regulation.

Assessment period 15 days. No response isa

deemed refusal. : . :

‘Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more'i formation 9 to schedule 2 tablet of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
18. An application may trigger referral to the local goverment as the concurrence agency if the building work

Assessment périod 5 days. No.sesponsé is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal, 19. An application may trigger referral to the local government as the concurrence agency if the building work

Le i does not comply. with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queenstand
“ Development Code, part 11 oF 12.

Fire: ala in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings - building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more’information:go to schedule 2 table 1 of lhe been completed.

IP Regulation. . .

“Assessment periad 15 days. No response is a

deemed refusal. :

‘Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services : building work

For mare information’go to schedule 2 tablet of the ¢ complies with the performance criteria of the Queensland Development code part 45; and

(P Regulation and the QDC part 15. the work does not comply with an acceptable solution stated in the part. .

Assessment ead, 1§ days. No responseis a

deeined refusall.’ . : @

Building work for. residential service |22. An application for building work for premises in which residential care service under the Residential .

For more information go to-schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

; IP Regulation and the QOC part 20. : referral to the local government as the concurrence agency.

Assessment period 15 days. No response is a

deemed refusal,

Building work for removal or -| 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the focal government as the concurrence agency. .

For more information go to schedule 2 table 1 of the . ,

IP-Reaulation.

Assessment period §.days. No responsa isa

deemed refusal, .

Building work for rainwater tank in 24. An application may trigger referral to the’ local government as the concurrence agency to determine if the

building work or structure complies with ‘the relevant performance criteria if -

© Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

* Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

 

Page 16

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1812 - Preliminary Building works assessable against planning scheme [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.