Council archive · source document
07/1812 - Preliminary Building works assessable against planning scheme [As Published] · 172007.1812
EST_ELEVATION
2a
2Q BOO
RECEIVED
-3 SEP 2007 |
POSA SHIRE Couey fm
_t APL FRONT CounTER <
HL ea00. 1000 we al
+ FMR Dian.
FLOOR PLAN >, ‘
i 100-0
2B1\aG
PARADE
1
190:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1812 - Preliminary Building works assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.