Council archive · source document
07/1812 - Preliminary Building works assessable against planning scheme [As Published] · 172007.1812
INTEGRATED PLANNING ACT 1997
_State-controlied road matters
For more information feferto Guide 3.
Unless you answeréd ‘none athe above” to'Q2;
“the application triggers referral to the Department
:0f, Main, Roads (DMR)-as a referral agency:
“agency, while in; other circumstances 0
be'a concurrence’ agency.” .
Schedule 2 of: the: 1P. Beason on assist you-to
2:
. . IDAS Assessment Checklist, Version 20, 2 Aprit 2007 \
The application involves: (tick applicable box/es) . : ‘
[1 (i) development on tand contiguous? to a State controlled road and for -
C2 @@) material change of use assessable against the planning scheme;
{J (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
: Do (c) operational work (not associated with a material change of use assessable against the
Dlanning scheme or reconfiguring a fof mentioned in (b) above)
« associated with access to a State-controlled road; or
» for filling or excavation; or -
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
1 (@) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds-set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“+ and exceeding the thresholds set by that schedule;
[1 (6) operational work (not associated with a material change of use assessable against _)
planning scheme or reconfiguring a fot mentioned in (b) above)—
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
: A that schedule.
(iii) none of the above
Clearing vegetation § ==... 413. The application-involves: (tick applicable boxes}
Formore inforrnation refer fo. Guide s2 oO (i) material change of use—
Unless you answered “none of the. above" 10.03, a - .
the application requires assessment by the. {a) assessable against the planning scheme; ‘
Departhhent of Natural Resoirces‘and Water | ining — .
“me os {b) on a lot containing
“fan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application,NRWis a, « ifthere is no property map of assessable vegetation. for the lot - remnant vegetation;
oosmate "or the application in relation (c)_ where the existing use of the fand is a rural or environmental use; and
ifyoulticked 030) or (i, yeu appl (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to. NRW for ii) reconfiguring a lot -
whether vegetatio: Oo w : suring wo
soe (a) on a lot containing a category 1, 2 or 3 area shown on a property map of
‘assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; ws @
(b) . where the size of the lot before the reconfiguration is 2 hectares or larger; |
(c) where 2 or more lots are created; and |
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4 |
Li) operational work: - .
, (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of :
Form? i
' iv) none of the above. . |
Strategic port land The application involves:
Fors more information refer: 10, Guide 44> |
If you ticked (i) - therelevant Port Authority isthe
assessment manager forthe application. .
HEyou ticked (i) Queensland Transportis'a
concurrence agency for the application.
(i) development on strategic port land as defined in the ‘Transport infrastructure Act 1994 (TI
Act) - complete Part f of Form 1
Di
material change of use that is inconsistent with the land use plan approved under the
| Act for the strategic port land - complete Part | of Form 1
(iii) none of the above
4 Land contiguous to a State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contratled road; or thal is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1812 - Preliminary Building works assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.