Skip to the record
For the highest quality transcripts.

Council archive · source document

07/1812 - Preliminary Building works assessable against planning scheme [As Published] · 172007.1812

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
_State-controlied road matters

For more information feferto Guide 3.
Unless you answeréd ‘none athe above” to'Q2;

“the application triggers referral to the Department
:0f, Main, Roads (DMR)-as a referral agency:

 

 

 
 
 

 

“agency, while in; other circumstances 0
be'a concurrence’ agency.” .

Schedule 2 of: the: 1P. Beason on assist you-to

 

 

 

 

2:

. . IDAS Assessment Checklist, Version 20, 2 Aprit 2007 \
The application involves: (tick applicable box/es) . : ‘
[1 (i) development on tand contiguous? to a State controlled road and for -

C2 @@) material change of use assessable against the planning scheme;

{J (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;

: Do (c) operational work (not associated with a material change of use assessable against the
Dlanning scheme or reconfiguring a fof mentioned in (b) above)
« associated with access to a State-controlled road; or
» for filling or excavation; or -
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
1 (@) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds-set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“+ and exceeding the thresholds set by that schedule;
[1 (6) operational work (not associated with a material change of use assessable against _)
planning scheme or reconfiguring a fot mentioned in (b) above)—
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by

: A that schedule.
(iii) none of the above

 

 

  
 

 

 

Clearing vegetation § ==... 413. The application-involves: (tick applicable boxes}
Formore inforrnation refer fo. Guide s2 oO (i) material change of use—
Unless you answered “none of the. above" 10.03, a - .
the application requires assessment by the. {a) assessable against the planning scheme; ‘
Departhhent of Natural Resoirces‘and Water | ining — .
“me os {b) on a lot containing
“fan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application,NRWis a, « ifthere is no property map of assessable vegetation. for the lot - remnant vegetation;
oosmate "or the application in relation (c)_ where the existing use of the fand is a rural or environmental use; and
ifyoulticked 030) or (i, yeu appl (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to. NRW for ii) reconfiguring a lot -
whether vegetatio: Oo w : suring wo
soe (a) on a lot containing a category 1, 2 or 3 area shown on a property map of
‘assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; ws @
(b) . where the size of the lot before the reconfiguration is 2 hectares or larger; |
(c) where 2 or more lots are created; and |
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4 |
Li) operational work: - .
, (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of :
Form? i
' iv) none of the above. . |
Strategic port land The application involves:

Fors more information refer: 10, Guide 44> |
If you ticked (i) - therelevant Port Authority isthe
assessment manager forthe application. .

HEyou ticked (i) Queensland Transportis'a
concurrence agency for the application.

 

 

(i) development on strategic port land as defined in the ‘Transport infrastructure Act 1994 (TI
Act) - complete Part f of Form 1
Di

material change of use that is inconsistent with the land use plan approved under the
| Act for the strategic port land - complete Part | of Form 1

(iii) none of the above

 

4 Land contiguous to a State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contratled road; or thal is part of a future State-

controlled road.

Page 2

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1812 - Preliminary Building works assessable against planning scheme [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.