Decision Notice - Minor Change - MCU20 0159 01 & OPW20 0245 01 [As Published] · MCU20/0159.01

of 14

Text shows just the words. Original shows the document exactly as it was published.

                                                                              Officer:          Tara Norley
                                                                              Direct Telephone: 07 5329 6486
                                                                              Our Reference:    MCU20/0159.01
                                                                                                OPW20/0245.01
                                                                              Your Reference:   202040

               2 August 2023


               Karloo Constructions
               C/- Building Suncoast Green
               6 Lorraine Ave
               MARCOOLA QLD 4564
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 6 July 2023, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU20/0159.01, OPW20/0245.01

                   Street address:              11 Vision Court, Noosaville

                   Real property description:   Lot 4 SP 295958

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 6 April 2021
               •       Development Permit for Material Change of Use - Low impact industry
               •       Development Permit for Operational Works (Access, Parking, Stormwater, Earthworks and
                       Landscaping)
               In relation to the request to make a minor change to the existing approval, Council on 1 August
               2023, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend conditions 2 and 15.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                             PO Box 141
               noosa.qld.gov.au                                                        Tewantin QLD 4565
               [email protected]                                                        07 5329 6500
                                                                                                      Page 1 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023
Full text of the other 13 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

                                          MATERIAL CHANGE OF USE – MCU20/0159
               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply
                      with the approved plans of development. The approved plans are listed in the following table
                      unless otherwise amended by these conditions.

                        Sheet Rev. Plan/Document Name                                                 Date
                        No.

                        01         B   Cover Sheet, prepared by Building Suncoast Green               Not dated

                        02         E   Site/Floor Plan Level 1, prepared by Building Suncoast 19/04/2021
                                       Green

                        03         B   Roof Plan Level 2, prepared by Building Suncoast Green         Not dated

                        04         B   Sections, prepared by Building Suncoast Green                  Not dated

                        05         B   Elevations, prepared by Building Suncoast Green                Not dated

                        06         B   Landscape Plan, prepared by Building Suncoast Green            Not dated

                        07             Landscape Schedule, prepared by Building Suncoast Not dated
                                       Green

                      Currency Period
               3.     This development approval lapses if the use has not happened by 6 April 2027, unless an
                      application to extend the currency period is approved by Council.
                      Performance Bond
               4.     Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
                      start meeting. The cash bond or trading bank guarantee will be returned on performance of
                      the conditions of approval less any costs incurred by Council in respect of enforcing
                      performance of this permit. Council reserves the right to call upon the bond or guaranteed
                      sum to effect compliance with conditions.
                      Nature and Extent of Approved Use
               5.     Any retail sale of goods and/or administration uses must remain an ancillary component to,
                      and have a direct relationship with the approved industrial use.
               6.     The combined gross floor area (GFA) of any retail and administration components must not
                      exceed 40% of the total GFA of the tenancy, with either individual component not exceeding
                      30% of the GFA of the tenancy.
               7.     The approved tenancies must not be used as a self-storage facility.
               8.     Industry activities are operated in a manner to avoid noise emissions that unreasonably
                      diminish the amenity of the area or surrounding uses.



                                                                                                       Page 2 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 3

                      Building Height
               9.     The maximum height of the development must not exceed 10 metres above ground level.
                      Building Appearance
               10.    The development must be finished with subdued external building colours.
               11.    All mechanical equipment and other service infrastructure located on the site must be:
                      a.      Located not less than 2 metres from a property boundary; and
                      b.      Fully enclosed or screened such that they are not visible from the street frontages nor
                              adjoining properties. Where screened by landscaping, landscaping beds must be at
                              least 1.5 metres wide.
               12.    All waste storage areas must be screened from the street and adjoining property by buildings,
                      landscaping or fencing.
                      Emissions
               13.    The development must contain any odour and/or dust air pollutants within the boundaries of
                      the site.
                      Landscaping
               14.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Operational Works approval and Planning Scheme Policy PSP2 - Landscaping and
                      must include in particular:
                      a.      the works shown on the Approved Plans;
                      b.      vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage; and
                      c.      provision of 3 street trees within the road reserve.
               15.    Any street fencing must not exceed 1.8 metres in height. Any fencing on the front boundary
                      must either:
                      a.      not exceed a maximum height of 1.8 metres; and
                      b.      be of open construction.
               15.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Fencing and Walls
               16.    The rear and side boundaries of the site are to be enclosed with security fencing no less than
                      1.8 metres in height.
                      Mechanical plant, equipment and storage
               17.    Mechanical plant and equipment are to be fully enclosed or screened and visually integrated
                      into the line and plane of the building and roof design and must not project beyond the height
                      or width of the building when viewed from the street and adjoining properties
                      Water & Sewer Connections
               18.    An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
               19.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the development site.




                                                                                                       Page 3 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 4

               ENGINEERING
                      External Works
               20.    Vision Court must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with the subject approval and must include in particular,
                      the construction of a pedestrian footpath in accordance with the conditions of this Decision
                      Notice
                      Site Access and Driveways
               21.    A sealed access driveway must be provided from Vision Court to all parking and manoeuvring
                      areas of the development. The works must be undertaken in accordance with the conditions
                      of this Decision Notice and must include in particular, the construction of a driveway generally
                      in accordance with Council’s standard drawing RS-051 and respective addendum.
                      Car Parking
               22.    A minimum of 19 car parking spaces must be provided and marked on the site, and made
                      available and accessible at all times while the use is open for business. The works must be
                      undertaken in accordance with the conditions of this Decision Notice and must include in
                      particular
                      a.      7 staff parking spaces within the total, which are clearly marked for that purpose
                      b.      Provision of vandal resistant public lighting with intensities to satisfy the requirements
                              of Australian Standard AS1158: Public Lighting Code;
                      c.      1 disabled parking space/s within the total
                      d.      dimensions, crossfalls and gradients in accordance with Australian Standard
                              AS/NZS2890.1:2004 Parking Facilities
               23.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
               24.    Directional signage must be provided to direct visitors and customers to the car parking
                      spaces provided on site.
                      Service Vehicles
               25.    Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
                      The works must be undertaken in accordance with the conditions of this Decision Notice and
                      must include in particular one 12 metres x 3.6 metres loading bay.
                      Pedestrian and Bicycle Facilities
               26.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with the conditions of this Decision Notice and must include in
                      particular:
                      a.      2 metre wide concrete footpath within the road verge, extending from the eastern edge
                              of the proposed driveway to the prolongation of the subject property’s eastern
                              boundary.
                      b.      A total of 6 bicycle parking spaces.
                      Stormwater Drainage
               27.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with the conditions of this Decision
                      Notice and must include in particular, the works shown on the Approved Plans.
                      Services
               28.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.



                                                                                                         Page 4 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 5

               29.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               30.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               31.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               32.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               33.    All fill and associated batters must be contained entirely within the subject site unless written
                      permission from the respective landowner(s) is provided to Council. All earthworks must be
                      undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
                      Earthworks for Commercial and Residential Developments.
               34.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               35.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               36.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
               37.    Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval
                                              OPERATIONAL WORKS - OPW20/0245
               APPROVED PLANS
               38.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.       Rev. Plan/Document Name                                           Date

                        C020 B         B    Siteworks and Drainage Plan Prepared by Empire 08/02/2021
                                            Engineering
                                            As Annotated by Council

                        C040 A         A    Signs and Linemarking Plan Prepared by Empire 08/12/2021
                                            Engineers

                        Sheet 06       B    Landscape Plan prepared by Building Suncoast Green


                                                                                                        Page 5 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 6

                        Sheet 07       B    Landscape Schedule prepared by Building Suncoast
                                            Green

               CURRENCY PERIOD
               39.    The Currency Period for this development approval lapses if the development has not
                      substantially started by 6 April 2027 unless an application to extend the currency period is
                      approved by Council.
               SITE SPECIFIC CONDITIONS
               40.    An amended plan, showing a 2m wide footpath within the road verge, extending from the
                      eastern boundary, must be submitted to Council prior to the prestart meeting. The footpath
                      must be constructed generally in accordance with Council’s standard drawing RS-065.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               41.    All necessary approvals from external service providers (eg Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               42.    A condition report including photographs of the frontage of the site must be completed and
                      submitted to council prior to the prestart meeting.
               43.    Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               44.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Landscape works;
                      c.      Erosion and sediment control works;
                      d.      Other relevant parties
               45.    A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD);
                      b.      Provision for safe pedestrian access across the frontage of the site both during daily
                              construction and after daily construction has ceased.
               46.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               47.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
                      Landscaping
               48.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Operational Works approval and Planning Scheme Policy PSP2 - Landscaping and
                      must include in particular:
                      a.      the works shown on the Approved Plans;
                      b.      vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage; and
                      c.      provision of 5 street trees within the road reserve.


                                                                                                       Page 6 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 7

               49.    Any fencing to the road frontage must be set back at least 1 metre from the street boundary,
                      and must have a minimum average setback of 2 metres to the street boundary. All land
                      between the fence and the front property boundary must be densely landscaped.
               50.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               DURING CONSTRUCTION
                      Engineering
               51.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               52.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               53.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site
                      Pavement Design and Construction
               54.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               55.    Safe pedestrian access on all streets in the vicinity of the development must be maintained
                      at all times. Should footpath/road closures be necessary to carry out construction works,
                      Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               56.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               57.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Pathways
               58.    All pathways must be constructed in accordance with the following requirements:
                      a.      All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065;
                      b.      Provision must be made for disabled access at all kerb crossings associated with
                              pathways, in accordance with Council's current standards;
                      c.      All paths must have a slip resistant surface;


                                                                                                     Page 7 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 8

                      d.      Expansion and contraction joints must provide a flush finish. Installation of joints by
                              saw cutting is preferred to ensure a smooth ride for cyclists;
                      e.      The required work includes any modifications to ensure the footpath finishes flush with
                              all existing service covers and the like, or alternatively these services are raised or
                              altered, so as not to create a pedestrian safety hazard.
               59.    Pathways must:
                      a.      Terminate in a manner that ensures smooth transition to existing surfaces for public
                              safety;
                      b.      Be designed and constructed to comply with the Disability Discrimination Act (DDA),
                              Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
                              access and mobility.
                      Site Access and Driveways
               60.    Driveway crossovers must be constructed in accordance with Council’s Standard Drawing
                      RS-051 and any associated addendum.
               61.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               62.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties
                      c.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path
                      d.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               63.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 2’ as
                      defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
                      uniformity of fill shall be provided by a RPEQ and submitted to Council prior to requesting
                      the On-Maintenance inspection.
               64.    Fall protection must be provided to retaining walls that are over 1m high
               65.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas;
                      d.      1 in 2 for combined structural engineering and planted solutions.
                      Stormwater Drainage
               66.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.



                                                                                                        Page 8 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 9

               67.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (eg by blocking or interfering with natural overland flows).
               68.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               69.    Prescribed Water Contaminants (as defined in Schedule 9 of Environmental Protection
                      Regulation 2008) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               70.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      Been revised to address predicted rainfall events, and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               71.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards * (Refer to Advisory Note).
               72.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               73.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               74.    Prior to the completion of the development and commencement of the use, all site surfaces
                      must be effectively stabilised using methods which have achieved effective short-term
                      stabilisation and which will continue to achieve effective stabilisation in the medium to long-
                      term. For the purpose of this condition, an effectively stabilised surface is defined as one that
                      does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully
                      erosion or lead to sedimentation, or lead to water contamination.
                      Landscaping
               75.    The finished level of all mulch in garden beds and landscaped medians is to be a minimum
                      of 50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in
                      accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
               76.    Suitable root barriers must be installed where proposed trees are adjacent to paths,
                      pavement etc in accordance with Council’s Planning Scheme Policy PSP2 Landscaping.


                                                                                                           Page 9 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 10

               77.    An inspection is to be carried out with the relevant Council officers, the Contractor and
                      Supervising Engineer after road centrelines have been established, and prior to clearing
                      being carried out. This inspection is to deal with the limits of clearing to be carried out for this
                      development. This meeting is to take place prior to the “Pre-start” meeting.
                      Damage to Services and Assets
               78.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF THE USE
                      Certification
               79.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               ON MAINTENANCE
               80.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
                      Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit;
                      b.      a plan showing the constructed footpath;
                      c.      maintenance and operational manuals for all proprietary or site specific devices.
               OFF MAINTENANCE
               81.    Prior to requesting an Off Maintenance inspection the developer must provide a written
                      request for the Off Maintenance inspection.
               82.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      A Council inspection reveals works do not comply with approval requirements;
                      b.      Submitted certification falsely states works comply with approval requirements.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Advertising Devices
               1.     All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
                      (Administration) 2015 including both temporary and permanent signage. All freestanding,
                      pylon or pole signs or signage that is illuminated requires approval from Council prior to being
                      installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
                      prohibited from being erected in the Shire.




                                                                                                          Page 10 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 11

                      Infrastructure Charges
               2.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Building and Construction Industry (Portable Long Service Leave) Levy
               3.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
               4.     The following notes are included for guidance and information purposes only and do not form
                      part of the assessment manager conditions:
                      General Advisory Notes
               5.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               6.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               7.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart, On and Off Maintenance Inspections Request
               8.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
               9.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               10.    A minimum maintenance period of 12 months will apply to all municipal works and thereafter
                      until such time as the works are performing in accordance with the approved design unless
                      noted otherwise
                      Environmental Advisory Notes
               11.    The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               12.    Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control
               13.    Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               14.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the plan sealing inspection:


                                                                                                      Page 11 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 12

                      a.      Methods of stabilisation are:
                              • appropriate for slopes and slope lengths; and
                              • are consistent with best practice environmental management practices such as in
                                the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                      If at the time of request for plan sealing, the method of short-term stabilisation has not
                      achieved a level of stability that Council's Officers believe will have a high probability of
                      achieving long term stability (i.e. until house construction has occurred on all lots), Council
                      Officers may take the following matters into consideration in determining whether the site is
                      capable of achieving medium to long-term stability:
                              • evidence that the site has been effectively stabilised in the short term;
                              • evidence that soil has been adequately ameliorated;
                              • evidence that seed of annual and perennial grass species has been applied at an
                                adequate rate; and
                              • that grass seed has germinated at a density that is likely to achieve an effective
                                grass cover.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                Subject of the required Development Permit

                Development Permit for Building Works              All building work.

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.

               Yours faithfully




               Tara Norley
               Development Planner

               Enc:   Appeal Rights
                      Approved Plans/Documents
               cc.    Unitywater



                                                                                                       Page 12 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 13

               DECISION NOTICE HISTORY
               •   Original Decision Notice – 6 April 2021

               •   Decision Notice – Minor - MCU20/0159.01 & OPW20/0245.01 - 1 August 2023, with an amendment to conditions 2 & 15.




                                                                                                                         Page 13 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Page 14

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 14 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023

Used in these records

About this file

File size
194 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - MCU20 0159 01 & OPW20 0245 01 [As Published].pdf · 194 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.