Decision Notice - Minor Change - MCU20 0159 01 & OPW20 0245 01 [As Published] · MCU20/0159.01
Sheet 07 B Landscape Schedule prepared by Building Suncoast
Green
CURRENCY PERIOD
39. The Currency Period for this development approval lapses if the development has not
substantially started by 6 April 2027 unless an application to extend the currency period is
approved by Council.
SITE SPECIFIC CONDITIONS
40. An amended plan, showing a 2m wide footpath within the road verge, extending from the
eastern boundary, must be submitted to Council prior to the prestart meeting. The footpath
must be constructed generally in accordance with Council’s standard drawing RS-065.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
41. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
42. A condition report including photographs of the frontage of the site must be completed and
submitted to council prior to the prestart meeting.
43. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
44. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
45. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD);
b. Provision for safe pedestrian access across the frontage of the site both during daily
construction and after daily construction has ceased.
46. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
47. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Landscaping
48. The development site must be landscaped. The works must be undertaken in accordance
with the Operational Works approval and Planning Scheme Policy PSP2 - Landscaping and
must include in particular:
a. the works shown on the Approved Plans;
b. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage; and
c. provision of 5 street trees within the road reserve.
Page 6 of 14
Document Set ID: 22526729
Version: 4, Version Date: 02/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - MCU20 0159 01 & OPW20 0245 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.