                                  GEOTECHNICAL INVESTIGATION
                                               Proposed Unit Development
                                       3 Henderson Street, Sunshine Beach

                                              Report for: HR Design Group

                                                         22227-001-Rev0
                                                           29 June 2022



Tectonic Geotechnical Pty Ltd
PO Box 899, Buderim QLD 4556
Office: 07 5478 9016
Email: [email protected]
www.tectonicgeo.com.au
A.B.N. 83 165 727 828
Full text of the other 32 pages

Page 2

                              PROPOSED UNIT DEVELOPMENT
                              3 HENDERSON STREET, SUNSHINE BEACH

Document Review
   Document No.             Revision       Prepared By      Reviewed By             Date Issued

         001                   0           Ron McMahon      Michael Cocks           29 June 2022




Report Distribution
  Document        Revision         Method of Delivery                   Issued To
                                                                        Julie Fisher
      001              0               Electronic
                                                             ([email protected])




Prepared By:                                                 Reviewed By:




Ron McMahon                                                 Michael Cocks RPEQ 27540
Consulting Geotechnical Engineer                            Senior Geotechnical Engineer




29 June 2022
Report No. 22227-001-Rev0                               i

Page 3

                              PROPOSED UNIT DEVELOPMENT
                              3 HENDERSON STREET, SUNSHINE BEACH

Executive Summary
This report details the results of a geotechnical investigation undertaken for a proposed unit development at
3 Henderson Street, Sunshine Beach. The investigation was performed by Tectonic at the request of
HR Design Group. The investigation comprised drilling of boreholes at two locations across accessible
areas of the development footprint, together with in-situ soil strength testing. This report summarises the
results of the investigation and provides geotechnical recommendations regarding slope stability, earthworks
and footings, together with advice for temporary and permanent basement retention.

Provided drawings indicates that the development will comprise a four-storey unit building, over a single level
basement carpark. Excavation is anticipated to be up to 4 m in depth, with filling likely to be less than 0.5 m
high for landscaping. Temporary retention will be required as the basement excavation will extend close to
some of the site boundaries.
The subsurface conditions encountered in the boreholes are summarised as follows:

        Asphalt (borehole BH1 only) – about 20 mm thick; then or from the ground surface
        Fill – comprising very loose to loose gravelly/silty sand to depths between 0.3 m and 0.7 m below
         ground level (BGL); overlying
        Aeolian Sands – comprising mostly poorly graded sands that were loose to depths of between
         1.1 m and 2.8 m BGL; then becoming medium dense and increasing to dense below depths of
         about 4 m BGL.

No signs of groundwater seepage (‘springs’) were observed during our walk-over. Groundwater was not
encountered in the boreholes at the time of investigation.

Provided the recommendations within this report are adhered to, and subject to detailed design and
construction of the footing and retention systems by a suitably qualified and experienced structural RPEQ,
there would be a Low Risk to property from slope instability.

Excavations through the soils encountered in the boreholes should be achievable using conventional
earthmoving plant (e.g. small or larger excavators with toothed buckets). Temporary, unsurcharged cuts
could be formed at 1V:2H in the very loose to loose sands, and at 1V:1.5H in medium dense (or denser)
sands, for batters up to 3 m in height, provided groundwater seepage is not encountered and sands do not
slough from the batter face as they dry out. It is expected that space restrictions will limit battering of
temporary cuts on the site and so some form of temporary retention system, such as sheet piles, may be
required. Deeper unretained cuts, if required, should be specifically assessed by Tectonic.

Footings for the proposed development and any ancillary structures (e.g. retaining walls) must penetrate
through any fill materials and unsuitable natural soils (i.e. very loose to loose sands) to found at least 0.5 m
into medium dense (or denser) natural sands. Such materials were encountered in the boreholes below
depths of about 1 m to 2.8 m BGL (existing ground levels). High-level footings would be acceptable in
excavation areas where medium dense (or denser) natural sands are exposed at the subgrade level. Piled
footings would be required unless excavations expose such materials at or near foundation subgrade level.
Given the sandy soil profile, where deepened footings are required, steel screw piles are considered to be an
appropriate pile type. Due to the presence of loose sands, together with the close proximity of adjacent
buildings, open bored piers or driven piles are not considered to be suitable for this site.




29 June 2022
Report No. 22227-001-Rev0                               ii

Page 4

                                            PROPOSED UNIT DEVELOPMENT
                                            3 HENDERSON STREET, SUNSHINE BEACH

Table of Contents
1.0   INTRODUCTION ........................................................................................................................................................ 1

2.0   PROPOSED DEVELOPMENT ................................................................................................................................... 1

3.0   METHOD OF INVESTIGATION ................................................................................................................................. 2

4.0   RESULTS OF INVESTIGATION ................................................................................................................................ 2

      4.1         Site Description............................................................................................................................................. 2

      4.2         Topography................................................................................................................................................... 4

      4.3         Geology ........................................................................................................................................................ 4

      4.4         Subsurface Conditions.................................................................................................................................. 5

      4.5         Groundwater ................................................................................................................................................. 5

      4.6         Surface Drainage .......................................................................................................................................... 5

5.0   SLOPE STABILITY ASSESSMENT .......................................................................................................................... 6

      5.1         Existing Conditions ....................................................................................................................................... 6

      5.2         Stability Assessment..................................................................................................................................... 7

      5.2.1            Quantitative Assessment ........................................................................................................................ 8

6.0   GEOTECHNICAL RECOMMENDATIONS .............................................................................................................. 10

      6.1         Development Limitations ............................................................................................................................ 10

      6.2         Earthworks – General ................................................................................................................................. 10

      6.2.1            Site Preparation and Trafficability ......................................................................................................... 10

      6.2.2            Excavations ........................................................................................................................................... 10

      6.2.3            Filling..................................................................................................................................................... 11

      6.3         Building Foundations .................................................................................................................................. 12

      6.3.1            Indicative Site Classification.................................................................................................................. 12

      6.3.2            Footing Design ...................................................................................................................................... 12

      6.4         Temporary and Permanent Retention......................................................................................................... 13

      6.5         Drainage ..................................................................................................................................................... 14

7.0   SUMMARY & CONCLUSIONS................................................................................................................................ 15

8.0   LIMITATIONS .......................................................................................................................................................... 15




29 June 2022
Report No. 22227-001-Rev0                                                              iii

Page 5

                                             PROPOSED UNIT DEVELOPMENT
                                             3 HENDERSON STREET, SUNSHINE BEACH

TABLES
Table 1: Summary of Subsurface Profiles ........................................................................................................................... 5

Table 2: Stability Risk Levels .............................................................................................................................................. 7

Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007) ......................................................................... 7

Table 4: Retaining Structure Design Parameters .............................................................................................................. 14



TEXT FIGURES
Text Figure 1: Proposed layout plan (LHS) and a cross-sectional view (RHS), courtesy Chris Clout Design ..................... 1

Text Figure 2: 2022 aerial image of the site and immediate surrounds (courtesy Nearmap imagery)................................. 3

Text Figure 3: View of the site looking west from Henderson Street ................................................................................... 3

Text Figure 4: View of the western (rear) part of the site, looking south-east...................................................................... 3

Text Figure 5: Plan showing ground surface contours (courtesy Noosa Council ‘Intramaps’) ............................................. 4

Text Figure 6: Extract of 1:100,000 Laguna Bay Surface Geology Map ............................................................................. 4

Text Figure 7: Extract from NSC landslide hazard overlay mapping ................................................................................... 6

Text Figure 8: Slope/W output for long term conditions...................................................................................................... 9

Text Figure 9: Footing depth required to prevent undermining......................................................................................... 13



FIGURES
Figure 1: Site Plan



APPENDICES
APPENDIX A
Borehole & DCP Reports & Explanatory Notes

APPENDIX B
AGS Guidelines - Qualitative Terminology for Use in Assessing Risk to Property
Some Guidelines for Hillside Construction

APPENDIX C
Limitations




29 June 2022
Report No. 22227-001-Rev0                                                             iv

Page 6

                              PROPOSED UNIT DEVELOPMENT
                              3 HENDERSON STREET, SUNSHINE BEACH

1.0      INTRODUCTION
This report details the results of a geotechnical investigation undertaken for a proposed residential unit
development at 3 Henderson Street, Sunshine Beach. The investigation was performed by Tectonic at the
request of the HR Design Group, generally in accordance with Proposal P22302-Rev0, dated 17 May 2022.

The investigation comprised drilling of boreholes at two locations across accessible areas of the
development footprint, together with in-situ soil strength testing. This report summarises the results of the
investigation and provides geotechnical recommendations regarding slope stability, earthworks and footings,
together with advice regarding temporary and permanent basement retention. In summary, subject to the
implementation of the recommendations made herein, it is assessed that there would be a Low Risk of slope
instability affecting the proposed development in accordance with the Australian Geomechanics Society
Guidelines for Landslide Risk Management, dated March 2007 (AGS 2007).

2.0      PROPOSED DEVELOPMENT
Preliminary architectural drawings were supplied to Tectonic (Ref. Chris Clout Design, Sheet Nos. C0.0 to
C4.1, Issue Preliminary Concept, dated 4 May 2022). These plans indicate that the development will
comprise a four-storey building, over a single level inground basement. Construction will likely include a
combination of masonry and lightweight materials (e.g. weatherboard cladding to walls etc.), and
suspended concrete floors.
No earthworks details were provided at the time of reporting; however, the sections provided to Tectonic
indicate that excavations for the lower ground floor would likely be in the order of about 4 m deep to the
rear, with minimal fill (<0.5 m high) anticipated to form final levels and for landscaping. Excavations will
extend close to the site boundaries and, therefore, some form of temporary retention will be required during
construction. Isolated deeper excavations may be required for underground services and other elements.
Text Figure 1 below presents the proposed layout plan and a cross-sectional view of the proposed
development.




Text Figure 1: Proposed layout plan (LHS) and a cross-sectional view (RHS), courtesy Chris Clout Design




29 June 2022
Report No. 22227-001-Rev0                                 1

Page 7

                             PROPOSED UNIT DEVELOPMENT
                             3 HENDERSON STREET, SUNSHINE BEACH

3.0      METHOD OF INVESTIGATION
As part of our assessment, a desk-top study was carried out comprising a review of published geological
maps and Noosa Shire Council (NSC) planning overlays and site information.

An experienced geotechnical engineer from Tectonic undertook a site walk-over on 9 June 2022 to visually
identify any indicators of past slope instability. The walk-over included assessment of soil exposures,
surface drainage conditions, topography, evidence of erosion or past instability, and vegetation
coverage/condition.
This was incorporated with a subsurface investigation comprising the drilling of two boreholes (designated
BH1 and BH2) in accessible areas across the site. Borehole BH1 was drilled in the eastern part of the site
using Tectonic’s 4WD mounted solid flight auger rig to 6 m below ground level (BGL). Due to access
restrictions, borehole BH2 was drilled in the western part of the site to 5.5 m BGL using hand augering
techniques.

In-situ testing, using the dynamic cone penetrometer (DCP) method, was carried out from the ground
surface and within each borehole. Boreholes were backfilled on completion using spoil excavated during
drilling, with excess material slightly mounded at the surface.

Laboratory testing was not warranted due to the sandy nature of the subsurface conditions encountered.

Borehole locations are shown in Figure 1 attached at the end of this report, with borehole and DCP logs
presented in Appendix A, together with explanatory notes. Borehole coordinates were recorded using a
handheld global positioning system (GPS).

The results of the desk-top study and walk-over survey are included in Section 4 below.

4.0      RESULTS OF INVESTIGATION
4.1      Site Description
The site is formally described as Lots 0 to 2 on BUP4358, covering a combined area of about 525 m2, with
frontage to Henderson Street along the eastern boundary. At the time of the investigation the site contained
a two-storey, residential unit building, with an asphalt sealed driveway connecting to Henderson Street. The
grounds contained various small garden spaces and terraced outdoor areas. Neighbouring properties
consisted of residential allotments, with a combination of low-rise houses and multi-storey unit buildings.
Inferred cut and fill earthworks had taken place across the site and adjacent areas. The site had been
levelled with cutting estimated up to about 1.5 m deep and filling visually estimated to be up to about 1 m
high to form garden beds and terraced areas. Cut and fill embankments were retained by the existing
building as well as low height timber sleeper walls (<1.5 m high).

The existing building, timber sleeper walls and driveway exposed signs of dilapidation (e.g. rotten wooden
panels, cracking etc.), which is likely related to age, poor construction and possibly consolidation of the
upper loose sands rather than global slope instability. A 2022 aerial image of the site and surrounds is
shown in Text Figure 2 overleaf.




29 June 2022
Report No. 22227-001-Rev0                              2

Page 8

                             PROPOSED UNIT DEVELOPMENT
                             3 HENDERSON STREET, SUNSHINE BEACH




                                                               Subject Site




Text Figure 2: 2022 aerial image of the site and immediate surrounds (courtesy Nearmap imagery)

Site conditions at the time of our investigation are shown in Text Figures 3 to 4 below.




Text Figure 3: View of the site looking west from Henderson Street




Text Figure 4: View of the western (rear) part of the site, looking south-east




29 June 2022
Report No. 22227-001-Rev0                               3

Page 9

                                PROPOSED UNIT DEVELOPMENT
                                3 HENDERSON STREET, SUNSHINE BEACH

4.2       Topography
As illustrated in Text Figure 5 below, the site is located on the convex south-easterly facing flank of an
ancient sand dune which crests about 40 m to west/northwest. During the site walk-over, topographic
features specific to the site were noted, and ground slopes were recorded using a hand-held clinometer.

The natural surface profile had been interrupted by historic landscaping and residential construction. The
inferred natural slopes in the area were measured at the time of our assessment between about 8° and 12°.
Based on our observations it appeared that cut and fill earthworks had been undertaken across the site,
resulting in a generally flat building platform supported by building walls and low height timber sleeper walls.
Ground slopes across a vacant allotment to the north-west of the site were gentle, being less than 6°.

Generally, no irregular surface features were noted which would indicate global slope instability.




                                            Subject Site




Text Figure 5: Plan showing ground surface contours (courtesy Noosa Council ‘Intramaps’)

4.3       Geology
Available geological information 1 indicates that the site is underlain by Pleistocene age parabolic sand dunes
comprising “quartz sand” (Ref: Text Figure 6).




                                                                        Approx. Site Location




Text Figure 6: Extract of 1:100,000 Laguna Bay Surface Geology Map




State of Queensland Department of Mines and Energy, 1:100,000 Laguna Bay Surface Geology Map, Sheet 9545 dated 11 July 2018
1




29 June 2022
Report No. 22227-001-Rev0                                    4

Page 10

                               PROPOSED UNIT DEVELOPMENT
                               3 HENDERSON STREET, SUNSHINE BEACH

4.4         Subsurface Conditions
Detailed descriptions of the subsurface conditions encountered in the boreholes are provided in the
borehole reports attached in Appendix A, along with definition sheets which describe terms and
abbreviations used in the reports. The subsurface conditions encountered in the boreholes are summarised
as follows:

          Asphalt (borehole BH1 only) – about 20 mm thick; then or from the ground surface
          Fill – comprising very loose to loose gravelly/silty sand to depths between 0.3 m and 0.7 m BGL;
           overlying
          Aeolian Sands – comprising mostly poorly graded sands that were loose to depths of between 1.1
           m and 2.8 m BGL; then becoming medium dense and increasing to dense below depths of about
           4 m BGL.

Table 1 below summarises the subsurface profile in each borehole.
Table 1: Summary of Subsurface Profiles
                                                                  Very
                                                                                 Medium Dense
 Borehole No.            Asphalt                Fill           Loose/Loose                         Dense Sand
                                                                                     Sand
                                                                  Sand

          BH1            0 – 0.02            0.02 – 0.3           0.3 – 1.1        1.1 – 4.0        4.0 – 6.0TD

          BH2               NE                0 – 0.7             0.7 – 2.8        2.8 – 4.0        4.0 – 5.5TD
Notes: 1.         Depths noted in m BGL at time of investigation (9 June 2022)
       2.         NE denotes not encountered
       3.         TD denotes borehole termination depth

4.5         Groundwater
No signs of groundwater seepage (‘springs’) were observed during our walk-over. Groundwater was not
encountered in the boreholes at the time of investigation. Groundwater conditions are expected to be
reflective of prevailing weather conditions and seepage may develop particularly following periods of
prolonged or heavy rainfall.

4.6         Surface Drainage
Surface drainage would be expected to follow natural surface contours to the south-east towards
Henderson Street, thus draining into the roadside drainage system. It is noted that the site has a small
catchment immediately upslope. However, most runoff from upslope of the property is anticipated to be
intercepted by the existing stormwater infrastructure associated with the neighboring structures and
roadside drainage systems.

Given the sandy nature of the site, rainfall would normally be anticipated to infiltrate the ground surface.
However, as the proposed development will occupy a large part of the block, significant run-off from hard
surfaces will occur. Nevertheless, where directed into swales rather than pipes, such run-off would be
expected to infiltrate into the natural sands relatively rapidly. No significant surface run-off features were
noted during our assessment (e.g. deep rilling or scour/wash out scars). This indicates that significant
overland flow is generally absent during rainfall events. Recommendations to improve surface drainage as
part of the development works are provided in Section 6.5.




29 June 2022
Report No. 22227-001-Rev0                                  5

Page 11

                            PROPOSED UNIT DEVELOPMENT
                            3 HENDERSON STREET, SUNSHINE BEACH

5.0      SLOPE STABILITY ASSESSMENT
5.1      Existing Conditions
The Noosa Planning Scheme 2020 includes a landslide hazard overlay map (Ref. extract in Text Figure 7).
Mapping indicates that the site is located within a Very Low/Low (no shading) to Moderate (pale yellow
shading) Landslide Hazard Area.




                                                                    Subject Site




Text Figure 7: Extract from NSC landslide hazard overlay mapping

It should be noted that the Noosa landslide hazard map is a broad-scale indication of the potential
landslide susceptibility and is superseded by this site-specific assessment. Our observations of surface
features relevant to this slope stability assessment are summarised as follows:

       The existing building was noted to be in reasonable structural condition considering age based on an
        external assessment and showed no signs of obvious distress associated with global instability.
       No indicators of recent global slope instability were observed, i.e. no landslide scarps or ‘hummocky’
        ground was evident across the proposed building area.
       No signs of groundwater seepage ‘springs’ were observed across the proposed development area.
       The site is on a convex landform.
       Overall inferred natural ground slopes were relatively moderate.




29 June 2022
Report No. 22227-001-Rev0                             6

Page 12

                                    PROPOSED UNIT DEVELOPMENT
                                    3 HENDERSON STREET, SUNSHINE BEACH

5.2        Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 2 and the
Qualitative Terminology for Use in Assessing Risk to Property is also attached in Appendix B.
Table 2: Stability Risk Levels
 Risk Level              Example Implications(1)
                         Unacceptable without treatment. Extensive detailed investigation and research, planning
        Very High
 VH                      and implementation of treatment options essential to reduce risk to Low; may be too
        Risk
                         expensive and not practical. Work likely to cost more than value of property.
                         Unacceptable without treatment. Detailed investigation, planning and implementation of
 H      High Risk        treatment options required to reduce risk to Low. Work would cost a substantial sum in
                         relation to the value of the property.
                         May be tolerated in certain circumstances (subject to regulators’ approval) but requires
        Moderate
 M                       investigation, planning and implementation of treatment options to reduce risk to Low.
        Risk
                         Treatment options to reduce to Low risk should be implemented as soon as practicable.
                         Usually acceptable to regulators. Where treatment has been required to reduce the risk to
 L      Low Risk
                         this level, ongoing maintenance required.
        Very Low
 VL                      Acceptable. Manage by normal slope maintenance procedures.
        Risk
 Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
 depend on the nature of the property at risk; these are only given as a general guide.

Given the geology, topography and particularly the relatively moderately sloping terrain across the proposed
development area, it is considered rare that a landslide could affect the proposed development. Sand dune
slopes are generally close to the ‘limit of equilibrium’ where the surface gradient is about 30°, although
possibly lower in the order of 26˚ to 28˚ for very loose sands. The limit of equilibrium is the ‘tipping point’ to
instability, where the factor of safety (FOS) of the slope is approximately 1.0. The FOS of a slope is the
balance (ratio) between the forces driving instability (e.g. soil weight, groundwater pressure) and the resisting
forces (e.g. soil friction and cohesion). Inferred natural slopes around this site are between 8° and 12°.

Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given below, it is assessed that there would be a Low (L) Risk of global slope instability
affecting the proposed development. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval. Summarised in Table
3 is our qualitative assessment of landslide risk for the development site. A summary of qualitative
terminology for use in assessing risk to property is attached (taken from AGS 2007).
Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007)
                                                                Assessed
 Hazard                             Likelihood   Consequence      Risk        Comments

                                                                              Given the low to moderate natural gradients and
                                                                              convex landform through the proposed building area, it
 1: Failure through very loose to                                             is considered Unlikely that a landslip would develop in
loose natural sands above the        Unlikely      Medium           Low       these materials, subject to implementation of the
foundation depth                                                              recommendations in Section 4. Given a potential
                                                                              Medium impact from such instability the resultant risk
                                                                              would be Low as per AGS 2007.

                                                                              The likelihood of a deep failure through the medium
                                                                              dense (or denser) natural sand below the proposed
                                                                              foundation depth is assessed as Rare due to the lack of
 2: Deep failure through the
                                                                              precedence of such movements locally, moderate surface
medium dense (or denser) sands        Rare          Major           Low
                                                                              gradients on a convex landform, no signs of any existing
below the foundation depth
                                                                              slope instability and a lack of groundwater. Although the
                                                                              consequence of such a failure would be Major, the
                                                                              resultant risk is Low as per AGS 2007.



29 June 2022
Report No. 22227-001-Rev0                                   7

Page 13

                                    PROPOSED UNIT DEVELOPMENT
                                    3 HENDERSON STREET, SUNSHINE BEACH

                                                                       The likelihood of a slip/failure through any temporary
                                                                       retention system (sheet pile wall, or similar) as outlined in
 3: Temporary instability through                                      Section 6.4, is assessed as Rare, subject to detailed
sheet pile temporary retention                                         design by a suitably qualified structural RPEQ and
                                      Rare     Major         Low
system, or similar, as discussed                                       construction by a specialist contractor which accounts for
in Section 6.4.                                                        the required factors of safety against slope instability.
                                                                       Although the consequence of such a failure would be
                                                                       Major, the resultant risk is Low as per AGS2007.


The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.

5.2.1        Quantitative Assessment
In order to estimate the factor of safety (FOS) against slope instability for the proposed development,
numerical analysis has been conducted using the software Slope/W. The ground surface profile has been
modelled using a combination of survey information, preliminary design drawings and slope angles
measured in the field by Tectonic. The analysed subsurface profile was compiled based on the results of our
subsurface investigation. Some inferences regarding subsurface conditions were made between test
locations. A minimum FOS value of 1.5 is the commonly adopted industry standard for long term conditions.
No groundwater was encountered at the time of investigation. Given the gradients across the site and highly
permeable nature of the sandy soil, development of shallow groundwater is considered unlikely. Should
groundwater seepage be encountered during construction Tectonic must be notified to assess the impacts
on instability. Nonetheless a relatively high groundwater level was modelled as a conservative approach.

To replicate future landscaping, a surcharge load of 5 kPa has been applied upslope of the proposed
building. Although building loads were not available at the time of reporting; a gross building load of 30 kPa
has been applied to areas of the building likely founded using high-level footings. Other areas will be
supported by piled foundations in the underlying medium dense (or denser) natural sands.

Soil shear strength was based upon effective parameters which were estimated based on our interpretation
of the subsurface investigation results, while also considering the values recommended for similar materials
in Appendix D of Australian Standard AS4678-2002 Earth Retaining Structures. Adopted soil parameters
are shown on the Slope/W output presented in Text Figure 8 overleaf. Analysis was undertaken for a
specified range of entry and exit points that could impact the proposed development.

The analysed profile represents the critical section for the proposed development, which covers the deepest
proposed cut. Our analysis indicates that stability of the site hinges on the temporary and permanent
retention systems. Provided that those walls/structures are adequately designed and constructed the
proposed development will achieve at least the required minimum FOS for long-term stability (i.e. ≥ 1.5).

It should be noted that this modelling addresses the global stability of the proposed works; however, the
stability of the temporary and permanent retaining walls must be addressed by others as part of detailed
design.




29 June 2022
Report No. 22227-001-Rev0                              8

Page 14

                               PROPOSED UNIT DEVELOPMENT
                               3 HENDERSON STREET, SUNSHINE BEACH




Text Figure 8: Slope/W output for long term conditions




29 June 2022
Report No. 22227-001-Rev0                                9

Page 15

                             PROPOSED UNIT DEVELOPMENT
                             3 HENDERSON STREET, SUNSHINE BEACH

6.0      GEOTECHNICAL RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.

6.1       Development Limitations
It is anticipated earthworks may include cuts for the basement level of up to about 4 m deep with minimal
filling (<0.5 m high) expected to be required to form finished surface levels and for landscaping. Should
proposed cuts/fills exceed these levels, Tectonic must assess the impacts on slope stability before
construction.

6.2       Earthworks – General
6.2.1       Site Preparation and Trafficability
Following removal of the existing buildings and associated construction elements (e.g. footings, services,
etc.), any tree stumps and large roots should be ‘grubbed out’. Any organic rich topsoil and uncontrolled fill
should then be stripped and set aside. Based on site observations, topsoil (where present) stripping depths
should generally range between 0.1 m and 0.2 m BGL, with uncontrolled fill encountered to depths of 0.4 m
to 0.7 m BGL (existing ground levels). It is noted that deeper pockets of topsoil or uncontrolled fill may exist
and deeper, localised grubbing out of tree roots may be required.
Topsoil materials must not be used in structural fill; however, may be placed across landscaping areas.
Unsuitable natural material such as any saturated, loose or soft materials encountered should also be
removed during subgrade preparation for bulk earthworks.

It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition of
substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically
a vibrating plate). Care must be taken with the use of vibratory equipment (e.g. compactors or sheet piling)
to ensure that there are no adverse impacts on surrounding structures. The impacts from ground vibration
must be closely monitored and managed during construction. It would be prudent to conduct a dilapidation
survey of neighbouring structures prior to commencement of construction.

The exposed natural subgrade following excavations will likely be in a loose condition and must be
compacted by several passes of a vibrating plate or minimum 4 tonne vibrating smooth drum roller, in
conjunction with surface application of ample water, to achieve the required compaction. As set out above,
impacts from vibrations should be closely monitored and a dilapidation survey would be prudent.
Due to the potential for poor trafficability during construction activities, a minimum 150 mm thick granular
working platform may be required on soil subgrades along haul roads and across laydown areas. Specific
platform design would be required prior to mobilisation and trafficking of any heavy mobile plant on the site
(e.g. cranes, concrete pumps or piling rigs)

Construction areas and surrounds should be graded to shed surface water runoff. Swale drains should be
constructed along the crest and toe of any cuts, and above fill batters, where possible. Drains are to be
graded to discharge collected waters to a control point(s) away from construction elements before release
into existing stormwater infrastructure.

It should be noted that during wet weather, the natural soils may cause sediment run-off. Appropriate
erosion and sediment control measures must be installed prior to commencement of earthworks at this site.

6.2.2       Excavations
Excavations through the soils encountered in the boreholes should be achievable using conventional
earthmoving plant (e.g. small or larger excavators with toothed buckets). Temporary, unsurchaged cuts in
the very loose to loose sand could be formed at 1V:2H and at 1V:1.5H in medium dense (or denser) sand for
batters up to 3 m in height. Flatter batters or temporary retention may be required if groundwater seepage is
encountered or if sloughing of dry sand occurs at the batter surface. Deeper unretained cuts, if required,
should be specifically assessed by Tectonic.


29 June 2022
Report No. 22227-001-Rev0                              10

Page 16

                             PROPOSED UNIT DEVELOPMENT
                             3 HENDERSON STREET, SUNSHINE BEACH

If filling or permanent cuts exceed 1 m high/deep, then these must be retained. Permanent cut and fill batters
up to 1 m high shall not exceed 1V:2.5H. Any permanent soil and fill batters will require erosion protection
(e.g. revegetation or surface protection).
It is likely that above temporary batter slopes may not be able to be achieved in places, due to spatial
constraints and, if so, temporary shoring will be required (e.g. sheet piles or others ) as per the
recommendations in Section 6.4 below. Excavations in close proximity to existing structures, including on
neighbouring properties, will need to be specifically designed to prevent undermining. It is recommended
that footing exposures or confirmation of foundations via certified building plans be undertaken to assess the
possibility of undermining. If undermining is a potential issue the existing structures may need to be
underpinned or excavations may require temporary shoring.

The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any potential
undermining as well as design and construction of any underpins/temporary shoring (if required).

The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).
Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the
ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be
graded to ensure free drainage of stormwater away from construction areas, and to a control point(s).

6.2.3       Filling
The existing sandy soils (fill and natural) where free of deleterious materials (e.g. vegetation, building debris
etc.) may be reused as structural fill, subject to appropriate moisture adjustment. It should be noted that
compaction of such relatively ‘clean’ sands as structural fill requires the addition of substantial volumes of
water (‘flooding’) combined with the use of vibratory compaction equipment (typically a smooth drum roller or
heavy vibrating plate).

Should importation of fill be required, it is recommended that such fill should comply with the following:

       Minimum CBR of 10%
       Maximum plasticity index of 15%
       Shrink-swell index ≤ 1%
       Maximum particle size of 100 mm

Any fill should be compacted at moisture contents within the range of ±2% of optimum moisture content for
Standard Compaction. Fill material should be placed in 250 mm thick (loose thickness) layers and be
compacted by repeated rolling using a minimum 4 tonne smooth drum roller (or equivalent, with vibration on
if safe to do so) to achieve a dry density ratio of at least 95% of the maximum Dry Density Ratio (DDR),
based upon the Standard Compaction method, or a Dry Density Index of at least 70%. Placement in thinner
layers may allow the compaction specification to be achieved without high levels of vibration.

Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per vertical
lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing
of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and
Residential Developments.

Fill embankment edges must be over-filled by 0.5 m (horizontally) and then trimmed back to well compacted
material.




29 June 2022
Report No. 22227-001-Rev0                              11

Page 17

                              PROPOSED UNIT DEVELOPMENT
                              3 HENDERSON STREET, SUNSHINE BEACH

6.3       Building Foundations
6.3.1       Indicative Site Classification
Site classifications for footing design are determined in accordance with AS 2870-2011 Residential Slabs and
Footings and depend on the depth of cut / fill undertaken at a site, variations in the natural soil/rock depths,
and the reactivity of the in situ soil / rock and any imported fill materials. It should be noted that the proposed
works are outside of the scope of AS2870.

Based on the results of the investigation, the site is classified as Class P in accordance with AS 2870-2011
Residential Slabs and Footings, due to the presence of uncontrolled fill and the poor bearing capacity of soils
at shallow depths. However, if not for these factors, the site would have the characteristics of Class S, with
the estimated characteristic surface movements (‘ys’) ranging up to about 20 mm. Due to the potential
variability in subgrade density, a site classification of Class M is recommended in relation to assessment of
flexibility requirements for ground slab, footing and plumbing design.

6.3.2       Footing Design
No design loadings were available at the time of reporting. Footings for the proposed development and any
ancillary structures (e.g. retaining walls, etc.) must penetrate through any fill materials and unsuitable natural
soils (i.e. very loose to loose sands) to found at least 0.5 m into medium dense (or denser) natural sands.
Such materials were encountered in the boreholes below depths of about 1 m in the eastern part of the site to
2.8 m BGL (existing ground levels) in the rear western part of the site. High level footings may be adopted
where such materials are exposed at or near the foundation subgrade level. However, piled footings will be
required in areas where loose or very loose sands are present at depth below subgrade level.

Piles founded in medium dense sands or better may be designed using an allowable end bearing pressure
(EBP) of 500 kPa. Piles founded in dense sand may adopt an allowable EBP of 1 MPa. High level footings,
where achievable in deeper cut areas, may be designed using an allowable bearing pressure of 150 kPa
provided that they are founded in the natural medium dense (or denser) sands. Settlement under such loads
is expected to be in the order of up to 20 mm or 1% of footing width.

Given the sandy soil profile and depths of footings required, steel screw piles are considered to be an
appropriate foundation type for the proposed unit development generally. However, in areas of cut exposing
medium dense (or denser) sands at the subgrade level, conventional high-level footings may be adopted. It
should be noted that excavation for concrete strip footings (or similar) may loosen the base. Therefore, the
use of a vibrating plate and ample water would be required to densify any high-level footing bases prior to
the placement of reinforcing steel. Additional DCP testing should be conducted during construction to
confirm the density of the subgrade materials where high-level footings are proposed.

Due to the presence of loose sands, open bored piers or driven piles are not considered to be appropriate for
this site. Steel reinforced concrete bored piles may be possible; however, the use of sacrificial liners (e.g.
formatube etc.) would be required. The advice of a specialist piling contractor must be sought regarding
feasibility, design and installation of the piling system for this site, including an assessment of potential
vibration effects on nearby structures, and monitoring requirements.

If steel screw piles are adopted, it will be important to ensure close supervision of installation, as piling may
not encounter sufficient drilling resistance (from torque measurement) in sands at the suggested founding
depth, and piles could extend to much greater depth than necessary.
It is therefore recommended that site specific static load testing be conducted from screw piles, if adopted, at
a minimum. Where tension or compression capacity developed in the footings is critical for the future
structure (e.g. resistance to uplift forces from high winds), then cyclic load tests (including measurement of
deflections under tension and compression cycles) should also be undertaken prior to construction.
Kentledge for static testing, or simulated cyclic loads, should prove the piles to a minimum of two times the
expected working load within tolerable deflections.

Footing design should also account for potential soil reactivity to be equivalent to Class M. It should be noted
that placement of reactive clay (which is not recommended) may result in a more severe equivalent site
classification, such as H1 or greater.



29 June 2022
Report No. 22227-001-Rev0                               12

Page 18

                              PROPOSED UNIT DEVELOPMENT
                              3 HENDERSON STREET, SUNSHINE BEACH

All footings should found such that they are not adversely affected by any adjacent excavations, trenches,
retaining walls, or in ground structures that are not designed to support building loads. Footings should
found at least below a plane extending 1 m horizontally from the base of trenches/excavations/retaining
walls/swimming pool, then rising up at 1V:1H, as illustrated in Text Figure 9.




                        Text Figure 9: Footing depth required to prevent undermining

Site drainage should be designed to readily remove surface water and to prevent ponding of water on
subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction
is completed. It is recommended that footings be inspected by a suitably qualified and experienced RPEQ
prior to placement of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and
cleanliness of excavations.

If any soil conditions encountered during construction are found to differ from those noted in the geotechnical
investigation, Tectonic should be notified immediately and an inspection carried out to determine if changes
to footing design are required.

6.4       Temporary and Permanent Retention
Excavations for the basement level may extend to depths of around 4 m BGL (existing ground levels) and it
is likely that the basement footprint will extend close to some of the site boundaries, so some form of
temporary shoring is likely to be required to support the basement excavation.

Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by use
of sheet piles; however, Unitywater requirements for the nearby sewer may restrict the use of sheet piles.
Sheet piles would also likely require lateral restraint, and this is conventionally achieved by anchoring.
However, the proximity to neighbouring properties would require a number of permissions to be obtained for
subterranean access. Therefore, it is suggested that internal struts/propping be considered to provide lateral
restraint for the shoring system.

Anchored or propped sheet pile would likely require pre-drilling to prevent adverse vibrations during sheet
pile installation. Temporary lateral support can be provided by installation of helical steel anchors (similar to
screw piles) or internal props/struts connected to walers. As a permanent basement wall is constructed
inside the temporary structure, the sheet pile wall becomes sacrificial.
Other shoring methods that could be considered include bored contiguous or secant piles. Non-contiguous
or soldier pile walls are not feasible for the proposed development due to the likelihood that loose sands
would ‘flow’ through gaps between the piles.

An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the
permanent walls, whereas sheet piles would be temporary to provide retention during construction only,



29 June 2022
Report No. 22227-001-Rev0                               13

Page 19

                                PROPOSED UNIT DEVELOPMENT
                                3 HENDERSON STREET, SUNSHINE BEACH

therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require greater
width (horizontally) for installation as compared to sheet piles and are often more expensive.

The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation of
the proposed retention and subsurface drainage system. It will be necessary to conduct numerical analysis
to optimise the retention system. Detailed design will also need to account for relevant factors of safety to
maintain the temporary and long-term stability of the retention system.

Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping backfill,
will require engineer design and certification of construction. Retaining wall design should be carried out in
accordance with AS4678-2002 Earth retaining structures.

Design for temporary and permanent retaining structures could be carried out using a pressure distribution
applicable to the wall type (e.g. trapezoidal for propped or anchored walls) and based on the parameters
listed in Table 4. These values do not include allowance for hydrostatic pressures nor transient (e.g.
construction) or adjacent footing loadings.
Table 4: Retaining Structure Design Parameters
                                                                     Lateral earth pressure coefficients
                              Unit
                                         Friction
 Retained material           weight
                                         angle (°)            Ka                        Ko
                             (t/m3)                                                                        Kp
                                                       (Cantilever wall)        (Non-yielding wall)


 Very Loose/ Loose
                               1.8           28               0.36                     0.53                2.77
 Sands


 Medium Dense (or
                               1.9           34               0.28                     0.44                3.54
 Denser) Sands


 Future Controlled Fill*        *            *                   *                       *                  *

Note:    * Depends on fill material type and level of compaction.

As a minimum, retaining structures must be founded as per the recommendations in Section 6.3.2 above
with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed design
must include an assessment of internal and global stability, together with required bearing pressure and
founding depth, by the retaining wall design engineer.

A solution using screw piles to support retaining walls, possibly including raked piles, may be feasible
although bending and shear capacities would need to be carefully checked in design from a soil-structure
interaction viewpoint. Additional lateral capacity may be achieved by incorporating a deeper pile cap that also
acts as a shear key attracting passive resistance in the sands in front of the wall.

6.5       Drainage
Surface diversion drainage should be constructed above the crest of any new cut or fill embankment or
retaining walls (e.g. grassed or landscaped swales or diversion mounds). Adequate site drainage must be
installed to ensure that stormwater runoff is directed away from building walls, footings, batters and retaining
walls.
Although unlikely, if groundwater seepage is encountered during excavations, Tectonic must be notified to
assess the impact on stability.

Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
accounted for in the design of the retaining structure.



29 June 2022
Report No. 22227-001-Rev0                                   14

Page 20

                            PROPOSED UNIT DEVELOPMENT
                            3 HENDERSON STREET, SUNSHINE BEACH

All excess stormwater collected around the residence (including overflow from rainwater tanks etc.) must be
directed by pipes or lined channels to discharge into the existing stormwater infrastructure along Henderson
Street. Subsurface disposal of stormwater must not be undertaken.

7.0      SUMMARY & CONCLUSIONS
Based on the findings of our assessment it is assessed that there would be a Low Risk of slope instability
affecting the proposed development subject to implementation of the recommendations given in this report.



8.0      LIMITATIONS
Your attention is drawn to the document Limitations, which is included in Appendix C of this report. The
statements presented in this document are intended to advise you of what your realistic expectations of this
report should be, and to present you with recommendations on how to minimise the risks associated with the
services provided by Tectonic for this project.




29 June 2022
Report No. 22227-001-Rev0                            15

Page 21

                                                                                                      Tectonic Geotechnical Pty Ltd
                                                                                                      PO Box 899
                                                                                                      Buderim Qld 4556
                                                                                                      Ph: 07 5478 9016

                                                                                                  PROJECT:

                                                                   Subject Site                   PROPOSED UNIT DEVELOPMENT
                                                                                                  3 HENDERSON STREET,
                                                                                                  SUNSHINE BEACH

                                                                                                  TITLE:
                                             BH2
                                                                                                  SITE PLAN



                                                                                                  CLIENT:

                                                                                                  HR DESIGN GROUP


                                                                                                  DRAWN:                  DATE:

                                                                                                  MCC                       27/06/2022
                                                             BH1
                                                                                                  CHECKED:                DATE:

                                                                                                  RFM                       27/06/2022

                                                                                                  SCALE:
                                                                                                  AS SHOWN (APPROX.)
                                                                                                  LEGEND:


                                                                                                            APPROX. BOREHOLE
                                                                                                            LOCATIONS




Notes:
                                                                                                  PROJECT NO.:          FIGURE:       REV:
Base plan adopted from Nearmap© imagery, dated 5 June 2022
                                                                                  0m   10   20m       22227-001                1         0

Page 22

                            PROPOSED UNIT DEVELOPMENT
                            3 HENDERSON STREET, SUNSHINE BEACH




APPENDIX A
Borehole & DCP Reports & Explanatory Notes




29 June 2022
Report No. 22227-001-Rev0

Page 23

                                                                                                                                                                                                                                                                                                                                                                                                                                          Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                                                BH1
                                                                                                                                                                                                                                                                                                                                                                                                                                         Page 1 of 1

                                                                                                                                                                                                            Engineering Log - Borehole                                                                                                                                 Project No.:                    22227

                                                                                                                                                                                                                 Client:                                  HR Design Group                                                                                              Commenced:                      9/6/2022
                                                                                                                                                                                                                 Project Name:                            Proposed Unit Development                                                                                    Completed:                      9/6/2022
                                                                                                                                                                                                                 Hole Location:                           3 Henderson Street, Sunshine Beach                                                                           Logged By:                      LM
                                                                                                                                                                                                                 Hole Position:                           510915.4 m E 7079107.4 m N 56J                                                                               Checked By:                     MCC
                                                                                                                                                                                                                 Drill Model and Mounting:                                4WD Auger                                                   Inclination: -90°                RL Surface:                No survey
                                                                                                                                                                                                                 Hole Diameter:                                           100 mm                                                      Bearing:     360°                Datum:                     AHD             Operator:          Tectonic

                                                                                                                                                                                                                                    Drilling Information                                                                                             Material Description and Observations




                                                                                                                                                                                                                                                                                                                                                                               Relative Density
                                                                                                                                                                                                                                                                                                       Classification
                                                                                                                                                                                                                                                                                                                                                                                                     Pocket                          DCP TEST
                                                                                                                                                                                                                     Penetration




                                                                                                                                                                                                                                                                                                                                                                               Consistency
                                                                                                                                                                                                                                                                                         Graphic Log


                                                                                                                                                                                                                                                     Samples                                                                            Material Description                                                                    (AS 1289.6.3.2-1997)
                                                                                                                                                                                                                                                                                                                                                                                                  Penetrometer
                                                                                                                                                                                                                                                               Recovery




                                                                                                                                                                                                                                                                                                                                                                               Condition
                                                                                                                                                                                                                                                      Tests                                                               soil type: plasticity or particle characteristics,




                                                                                                                                                                                                                                                                                                                                                                               Moisture
                                                                                                                                                                                                                                                                                                                                                                                                      UCS                        Blows per 100 mm
                                                                                                                                                                                                                                                                                                       Symbol
                                                                                                                                                                                                            Method




                                                                                                                                                                                                                                                     Remarks                                                               secondary and minor components, colour
                                                                                                                                                                                                                                   Water




                                                                                                                                                                                                                                                                           RL    Depth                                                                                                               (kPa)
                                                                                                                                                                                                                                                                           (m)    (m)                                                                                                                             0       5        10      15     20   25




                                                                                                                                                                                                                                                                                                                                                                                                  100
                                                                                                                                                                                                                                                                                                                                                                                                  200
                                                                                                                                                                                                                                                                                                                                                                                                  300
                                                                                                                                                                                                                                                                                                                                                                                                  400
                                                                                                                                                                                                                                                                                                                                                                                                  500
                                                                                                                                                                                                                                                                                                                        ASPHALT, dark grey, 20mm thick
                                                                                                                                                                                                                                                                                                                        Gravelly SAND (FILL), fine to medium grained,
                                                                                                                                                                                                                                                                                                         SM             grey yellow brown, fine to coarse sized gravel
                                                                                                                                                                                                                                                                                                                        Silty SAND, fine to medium grained, grey
                                                                                                                                                                                                                                                                                                                                                                                          L

                                                                                                                                                                                                                                                                                                          SP            SAND, fine to medium grained, pale grey

                                                                                                                                                                                                                                                                                   1




                                                                                                                                                                                                                                                                                                                                                                                                                      Augered to 2.3m
                                                                                                                                                                                                                                                                                   2
TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 22227.GPJ <<DrawingFile>> 28/6/2022 08:49 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                                   Not Encountered




                                                                                                                                                                                                                                                                                                                                                                                        MD
                                                                                                                                                                                                            AD/T




                                                                                                                                                                                                                                                                                   3                                                                                             M




                                                                                                                                                                                                                                                                                   4                                                                                                                                  Augered to 4.5m




                                                                                                                                                                                                                                                                                   5                                                                                                      D

                                                                                                                                                                                                                                                                                                                                                                                                                      Augered to 5.8m




                                                                                                                                                                                                                                                                                   6
                                                                                                                                                                                                                                                                                                                        Hole Terminated at 6.00 m
                                                                                                                                                                                                                                                                                                                        Target depth
                                                                                                                                                                                                                                                                                                                                                                                                                      20/20mm
                                                                                                                                                                                                                                                                                                                                                                                                                      Refusal




                                                                                                                                                                                                                      Method                                        Penetration                                         Water                    Samples and Tests                         Moisture Condition                 Consistency/Relative Density
                                                                                                                                                                                                                 AD/T-Auger Drilling TC Bit                                  VE - Very Easy         Level (Date)                          U## - Undisturbed Sample (## mm)                     D - Dry                           VS - Very Soft
                                                                                                                                                                                                                 AD/V-Auger Drilling V Bit                                   E - Easy                                                     DS - Disturbed Sample                                M - Moist                         S - Soft
                                                                                                                                                                                                                 RT - Rotary Tri-cone Bit                                                           Inflow                                BDS - Bulk Disturbed Sample                          W - Wet                           F    - Firm
                                                                                                                                                                                                                 RD - Rotary Drilling                                        F - Firm                                                     SPT - Standard Penetration Test                                                        VSt - Very Stiff
                                                                                                                                                                                                                                                                                                    Partial Loss
                                                                                                                                                                                                                 NMLC -Rock Core                                             H - Hard                                                                                                                                            H - Hard
                                                                                                                                                                                                                                                                             VH - Very hard        Complete Loss
                                                                                                                                                                                                                 HA - Hand Auger                                                                                                                                                                  Plastic Limit                  VL - Very Loose
                                                                                                                                                                                                                                                                           Graphic Log/Core Loss                                                                                                                                 L    - Loose
                                                                                                                                                                                                                                                                                                                                               Classification Symbols and                            < PL                        MD - Medium Dense
                                                                                                                                                                                                                                                                              Core recovered (hatching                                              Soil Descriptions
                                                                                                                                                                                                                                                                              indicates material)                                                                                                    = PL                        D - Dense
                                                                                                                                                                                                                                                                                                                                                  Based on Unified Soil                              < PL                        VD - Very Dense
                                                                                                                                                                                                                                                                              Core loss                                                                                                                                          Fr - Friable
                                                                                                                                                                                                                                                                                                                                                  Classification System

Page 24

                                                                                                                                                                                                                                                                                                                                                                                                                                         Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                                               BH2
                                                                                                                                                                                                                                                                                                                                                                                                                                         Page 1 of 1

                                                                                                                                                                                                            Engineering Log - Borehole                                                                                                                                 Project No.:                    22227

                                                                                                                                                                                                                 Client:                                  HR Design Group                                                                                              Commenced:                      9/6/2022
                                                                                                                                                                                                                 Project Name:                            Proposed Unit Development                                                                                    Completed:                      9/6/2022
                                                                                                                                                                                                                 Hole Location:                           3 Henderson Street, Sunshine Beach                                                                           Logged By:                      LM
                                                                                                                                                                                                                 Hole Position:                           510902.1 m E 7079126.7 m N 56J                                                                               Checked By:                     MCC
                                                                                                                                                                                                                 Drill Model and Mounting:                                Hand Auger                                                  Inclination: -90°                RL Surface:                No survey
                                                                                                                                                                                                                 Hole Diameter:                                           100 mm                                                      Bearing:     360°                Datum:                     AHD             Operator:         Tectonic

                                                                                                                                                                                                                                    Drilling Information                                                                                             Material Description and Observations




                                                                                                                                                                                                                                                                                                                                                                               Relative Density
                                                                                                                                                                                                                                                                                                       Classification
                                                                                                                                                                                                                                                                                                                                                                                                     Pocket                         DCP TEST
                                                                                                                                                                                                                     Penetration




                                                                                                                                                                                                                                                                                                                                                                               Consistency
                                                                                                                                                                                                                                                                                         Graphic Log


                                                                                                                                                                                                                                                     Samples                                                                            Material Description                                                                   (AS 1289.6.3.2-1997)
                                                                                                                                                                                                                                                                                                                                                                                                  Penetrometer
                                                                                                                                                                                                                                                               Recovery




                                                                                                                                                                                                                                                                                                                                                                               Condition
                                                                                                                                                                                                                                                      Tests                                                               soil type: plasticity or particle characteristics,




                                                                                                                                                                                                                                                                                                                                                                               Moisture
                                                                                                                                                                                                                                                                                                                                                                                                      UCS                       Blows per 100 mm
                                                                                                                                                                                                                                                                                                       Symbol
                                                                                                                                                                                                            Method




                                                                                                                                                                                                                                                     Remarks                                                               secondary and minor components, colour
                                                                                                                                                                                                                                   Water




                                                                                                                                                                                                                                                                           RL    Depth                                                                                                               (kPa)
                                                                                                                                                                                                                                                                           (m)    (m)                                                                                                                             0       5        10     15     20    25




                                                                                                                                                                                                                                                                                                                                                                                                  100
                                                                                                                                                                                                                                                                                                                                                                                                  200
                                                                                                                                                                                                                                                                                                                                                                                                  300
                                                                                                                                                                                                                                                                                                                                                                                                  400
                                                                                                                                                                                                                                                                                                                                                                                                  500
                                                                                                                                                                                                                                                                                                                        Silty SAND (FILL), fine to medium grained, dark
                                                                                                                                                                                                                                                                                                                        grey, with fine to coarse gravel
                                                                                                                                                                                                                                                                                                                                                                                       VL to
                                                                                                                                                                                                                                                                                                                                                                                        L


                                                                                                                                                                                                                                                                                                         SM             Silty SAND, fine to medium grained, grey

                                                                                                                                                                                                                                                                                   1
                                                                                                                                                                                                                                                                                                                                                                                          L




                                                                                                                                                                                                                                                                                                          SP            SAND, fine to medium grained, pale grey                                                       Augered to 1.9m
                                                                                                                                                                                                                                                                                   2
                                                                                                                                                                                                                                                                                                                                                                                        L to
                                                                                                                                                                                                                                                                                                                                                                                        MD
TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 22227.GPJ <<DrawingFile>> 28/6/2022 08:49 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                                   Not Encountered




                                                                                                                                                                                                                                                                                                                                                                                 M
                                                                                                                                                                                                            HA




                                                                                                                                                                                                                                                                                   3


                                                                                                                                                                                                                                                                                                                                                                                        MD                            Augered to 3.5m




                                                                                                                                                                                                                                                                                   4




                                                                                                                                                                                                                                                                                                                                                                                                                      Augered to 4.9m

                                                                                                                                                                                                                                                                                                                                                                                          D

                                                                                                                                                                                                                                                                                   5




                                                                                                                                                                                                                                                                                                                        Hole Terminated at 5.50 m
                                                                                                                                                                                                                                                                                                                        Target depth


                                                                                                                                                                                                                                                                                   6




                                                                                                                                                                                                                      Method                                        Penetration                                         Water                    Samples and Tests                         Moisture Condition                 Consistency/Relative Density
                                                                                                                                                                                                                 AD/T-Auger Drilling TC Bit                                  VE - Very Easy         Level (Date)                          U## - Undisturbed Sample (## mm)                     D - Dry                           VS - Very Soft
                                                                                                                                                                                                                 AD/V-Auger Drilling V Bit                                   E - Easy                                                     DS - Disturbed Sample                                M - Moist                         S - Soft
                                                                                                                                                                                                                 RT - Rotary Tri-cone Bit                                                           Inflow                                BDS - Bulk Disturbed Sample                          W - Wet                           F    - Firm
                                                                                                                                                                                                                 RD - Rotary Drilling                                        F - Firm                                                     SPT - Standard Penetration Test                                                        VSt - Very Stiff
                                                                                                                                                                                                                                                                                                    Partial Loss
                                                                                                                                                                                                                 NMLC -Rock Core                                             H - Hard                                                                                                                                            H - Hard
                                                                                                                                                                                                                                                                             VH - Very hard        Complete Loss
                                                                                                                                                                                                                 HA - Hand Auger                                                                                                                                                                  Plastic Limit                  VL - Very Loose
                                                                                                                                                                                                                                                                           Graphic Log/Core Loss                                                                                                                                 L    - Loose
                                                                                                                                                                                                                                                                                                                                               Classification Symbols and                            < PL                        MD - Medium Dense
                                                                                                                                                                                                                                                                              Core recovered (hatching                                              Soil Descriptions
                                                                                                                                                                                                                                                                              indicates material)                                                                                                    = PL                        D - Dense
                                                                                                                                                                                                                                                                                                                                                  Based on Unified Soil                              < PL                        VD - Very Dense
                                                                                                                                                                                                                                                                              Core loss                                                                                                                                          Fr - Friable
                                                                                                                                                                                                                                                                                                                                                  Classification System

Page 25

                                                                                            TERMS USED ON LOGS


DRILLING/EXCAVATION METHOD
AD*        Auger Drilling          RA      Rotary Air                          BH         Tractor Mounted Backhoe
ADH        Hollow Auger            RD      Rotary Blade or Drag bit            EX         Tracked Hydraulic Excavator
HA         Hand Auger              RT      Rotary Tri-cone bit                 HMLC       Core – 63mm
*T         TC-Bit                                                              HQ         Core – 63mm
*V         V-Bit                                                               NMLC       Core – 47mm
                                                                               NQ         Core – 52mm
                                                                               R          Ripper
                                                                               RH         Rock Hammer
WATER
GROUNDWATER NOT             The observation of groundwater, whether present or not, was not possible due to drilling water,
OBSERVED                    surface seepage or cave in of the borehole/test pit.
GROUNDWATER NOT            The borehole/test pit was dry soon after excavation. However, groundwater could be present in
ENCOUNTERED                less permeable strata. Inflow may have been observed had the borehole/test pit been left open
                           for a longer period.

SAMPLING AND TESTING
SPT                Standard Penetration Test to AS1289.6.3.1-2004
5,4,10 N=14        5,4,10 = Blows per 150mm. N = Blows per 300mm penetration following 150mm seating
30/65mm            Where practical refusal occurs, the blows and penetration for that interval are reported
RW                 Penetration occurred under the rod weight only
HW                 Penetration occurred under the hammer and rod weight only
HB                 Hammer double bouncing on anvil
DS                 Disturbed sample
BDS                Bulk disturbed sample
SV                 Field shear vane test expressed as uncorrected shear strength (sv = peak value, sr = residual value)
PP                 Pocket penetrometer test expressed as instrument reading in kPa
U50                Thin walled tube sample - number indicates nominal sample diameter in millimetres
DCP                Dynamic cone penetration test
CPT                Electronic cone penetration test
CPTu               Electronic cone penetration test with pore pressure (u) measurement



                                                                                                                       Rev1
                                                                                                                 February 2021

Page 26

                                                                        METHOD OF SOIL DESCRIPTION
                                                                                     USED ON LOGS
CLASSIFICATION AND INFERRED STRATIGRAPHY
Soil is classified and described in borehole and test pit logs using the preferred method given in AS1726 – 2017.
The material properties are assessed in the field by visual/tactile methods.
Particle Size                                                                     Plasticity Properties

 Major          Sub Division          Particle Size
Division
          BOULDERS                    > 200 mm
           COBBLES                   63 to 200 mm
                  Coarse              19 to 63 mm
 GRAVEL           Medium              6.7 to 19 mm
                     Fine            2.36 to 6.7 mm
                  Coarse             0.6 to 2.36 mm
  SAND            Medium             0.21 to 0.6 mm
                   Fine              0.075 to 0.21
              SILT                   0.002 to 0.075
             CLAY                     < 0.002 mm
                                                         NOTE: The U line is an approximate upper bound for most materials.
                                                         Data which plot above the U line may represent unusual/problem soil
                                                         behavior, or unreliable data and should be considered carefully.

MOISTURE CONDITION                                               AS1726 - 2017
Symbol     Term    Description
   D              Dry        Sands and gravels are free flowing. Clays & Silts may be brittle or friable and powdery.
   M            Moist        Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere.
   W             Wet         Soils exude free water. Sands and gravels tend to cohere.

CONSISTENCY AND DENSITY                                        AS1726 - 2017
 Symbol     Term        Undrained Shear                      Symbol        Term              Density Index %        SPT “N” #
                           Strength
    VS          Very Soft             0 to 12 kPa               VL         Very Loose          Less than 15              0 to 4
    S              Soft              12 to 25 kPa                L            Loose               15 to 35              4 to 10
    F             Firm               25 to 50 kPa               MD       Medium Dense             35 to 65           10 to 30
    St             Stiff             50 to 100 kPa              D            Dense                65 to 85           30 to 50
    VSt         Very Stiff          100 to 200 kPa              VD         Very Dense            Above 85           Above 50
     H            Hard             Above 200 kPa
In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of
the material.
# SPT correlations are not stated in AS1726 – 2017, and may be subject to corrections for overburden pressure and
equipment type.




                                                                                                                                  Rev1
                                                                                                                          October 2017

Page 27

                            PROPOSED UNIT DEVELOPMENT
                            3 HENDERSON STREET, SUNSHINE BEACH




APPENDIX B
AGS Guidelines - Qualitative Terminology for Use in
Assessing Risk to Property
Some Guidelines for Hillside Construction




29 June 2022
Report No. 22227-001-Rev0

Page 28

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                    Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039
  68039        RL2Risk
         Landslide August 2010
                       Management Issued 10/7/07

Page 29

                                       PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
               APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                          Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                         Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                             10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                    -2
B -    LIKELY                                     10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                   10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                   10-4                           H                         M                        L                       L                      VL
                                                    -5
E -    RARE                                       10                             M                          L                       L                      VL                      VL
                                                    -6
F -    BARELY CREDIBLE                            10                             L                         VL                      VL                      VL                      VL
      Notes:   (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
               (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                     time.


      RISK LEVEL IMPLICATIONS
                        Risk Level                                                                                  Example Implications (7)
                                                                 Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
        VH                      VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                 property.
                                                                 Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                           HIGH RISK
                                                                 risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                 May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
         M                      MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                 implemented as soon as practicable.
                                                                 Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                           LOW RISK
                                                                 required.
                                                                 Acceptable. Manage by normal slope maintenance procedures.
         VL                      VERY LOW RISK

       Note:   (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                     given as a general guide.




                                                                      Australian Geomechanics Vol 42 No 1 March 2007
 Form No. Landslide
    68039 68039 RL2Risk
                    August 2010
                        Management           Issued 10/7/07

Page 30

           PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                 APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                        GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
      ADVICE
      GEOTECHNICAL      Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
      ASSESSMENT        stage of planning and before site works.                                             geotechnical advice.
      PLANNING
      SITE PLANNING     Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                        arising from the identified hazards and consequences in mind.
      DESIGN AND CONSTRUCTION
                        Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                        or steel frames, timber or panel cladding.                                           filling.
       HOUSE DESIGN
                        Consider use of split levels.                                                        Movement intolerant structures.
                        Use decks for recreational areas where appropriate.
      SITE CLEARING     Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
          ACCESS &      Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
         DRIVEWAYS      Council specifications for grades may need to be modified.                           geotechnical advice.
                        Driveways and parking areas may need to be fully supported on piers.
      EARTHWORKS        Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                        Minimise depth.                                                                      Large scale cuts and benching.
            CUTS        Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                        Provide drainage measures and erosion control.                                       Ignore drainage requirements
                        Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                        Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                        Use clean fill materials and compact to engineering standards.                       onto property below.
            FILLS       Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                        Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                             Include stumps, trees, vegetation, topsoil,
                                                                                                             boulders, building rubble etc in fill.
        ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
         & BOULDERS     Support rock faces where necessary.                                                  boulders.
                        Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                        Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
         RETAINING
                        Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
           WALLS
                        above.                                                                               Lack of subsurface drains and weepholes.
                        Construct wall as soon as possible after cut/fill operation.
                        Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                        Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
          FOOTINGS
                        Design for lateral creep pressures if necessary.
                        Backfill footing excavations to exclude ingress of surface water.
                        Engineer designed.
                        Support on piers to rock where practicable.
      SWIMMING POOLS    Provide with under-drainage and gravity drain outlet where practicable.
                        Design for high soil pressures which may develop on uphill side whilst there
                        may be little or no lateral support on downhill side.
         DRAINAGE
                        Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                        Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
           SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                        Line to minimise infiltration and make flexible where possible.
                        Special structures to dissipate energy at changes of slope and/or direction.
                        Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                        Provide drain behind retaining walls.
         SUBSURFACE
                        Use flexible pipelines with access for maintenance.
                        Prevent inflow of surface water.
                        Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
           SEPTIC &
                        be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
           SULLAGE
                        Storage tanks should be water-tight and adequately founded.                          of landslide risk.
          EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
         CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
        LANDSCAPING
      DRAWINGS AND SITE VISITS DURING CONSTRUCTION
         DRAWINGS       Building Application drawings should be viewed by geotechnical consultant
         SITE VISITS    Site Visits by consultant may be appropriate during construction/
      INSPECTION AND MAINTENANCE BY OWNER
          OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
       RESPONSIBILITY   pipes.
                        Where structural distress is evident see advice.
                        If seepage observed, determine causes or seek advice on consequences.




                                 Australian Geomechanics Vol 42 No 1 March 2007                                                                113
Form No. 68029 RL2 August 2010

Page 31

          PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




    114                      Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010

Page 32

                            PROPOSED UNIT DEVELOPMENT
                            3 HENDERSON STREET, SUNSHINE BEACH




APPENDIX C
Limitations




29 June 2022
Report No. 22227-001-Rev0

Page 33

                                               LIMITATIONS


This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.

The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.

Conditions may exist which were undetectable given that economic and time constraints limit the practical
extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations exist
on site, additional studies and actions may be required.

Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
site, or its surroundings, or any laws or regulations.

Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may differ
from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments contained in this
document.

Where data supplied by the client or other external sources, including previous site investigation data, have
been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
accepted by Tectonic for incomplete or inaccurate data supplied by others.

This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this document.




Rev 1 (March 2016)

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

geotech and slope stability.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.