geotech and slope stability · MCU22/0145

of 33

Text shows just the words. Original shows the document exactly as it was published.

                                    PROPOSED UNIT DEVELOPMENT
                                    3 HENDERSON STREET, SUNSHINE BEACH

                                                                       The likelihood of a slip/failure through any temporary
                                                                       retention system (sheet pile wall, or similar) as outlined in
 3: Temporary instability through                                      Section 6.4, is assessed as Rare, subject to detailed
sheet pile temporary retention                                         design by a suitably qualified structural RPEQ and
                                      Rare     Major         Low
system, or similar, as discussed                                       construction by a specialist contractor which accounts for
in Section 6.4.                                                        the required factors of safety against slope instability.
                                                                       Although the consequence of such a failure would be
                                                                       Major, the resultant risk is Low as per AGS2007.


The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.

5.2.1        Quantitative Assessment
In order to estimate the factor of safety (FOS) against slope instability for the proposed development,
numerical analysis has been conducted using the software Slope/W. The ground surface profile has been
modelled using a combination of survey information, preliminary design drawings and slope angles
measured in the field by Tectonic. The analysed subsurface profile was compiled based on the results of our
subsurface investigation. Some inferences regarding subsurface conditions were made between test
locations. A minimum FOS value of 1.5 is the commonly adopted industry standard for long term conditions.
No groundwater was encountered at the time of investigation. Given the gradients across the site and highly
permeable nature of the sandy soil, development of shallow groundwater is considered unlikely. Should
groundwater seepage be encountered during construction Tectonic must be notified to assess the impacts
on instability. Nonetheless a relatively high groundwater level was modelled as a conservative approach.

To replicate future landscaping, a surcharge load of 5 kPa has been applied upslope of the proposed
building. Although building loads were not available at the time of reporting; a gross building load of 30 kPa
has been applied to areas of the building likely founded using high-level footings. Other areas will be
supported by piled foundations in the underlying medium dense (or denser) natural sands.

Soil shear strength was based upon effective parameters which were estimated based on our interpretation
of the subsurface investigation results, while also considering the values recommended for similar materials
in Appendix D of Australian Standard AS4678-2002 Earth Retaining Structures. Adopted soil parameters
are shown on the Slope/W output presented in Text Figure 8 overleaf. Analysis was undertaken for a
specified range of entry and exit points that could impact the proposed development.

The analysed profile represents the critical section for the proposed development, which covers the deepest
proposed cut. Our analysis indicates that stability of the site hinges on the temporary and permanent
retention systems. Provided that those walls/structures are adequately designed and constructed the
proposed development will achieve at least the required minimum FOS for long-term stability (i.e. ≥ 1.5).

It should be noted that this modelling addresses the global stability of the proposed works; however, the
stability of the temporary and permanent retaining walls must be addressed by others as part of detailed
design.




29 June 2022
Report No. 22227-001-Rev0                              8

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

geotech and slope stability.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.