                             PROPOSED UNIT DEVELOPMENT
                             3 HENDERSON STREET, SUNSHINE BEACH

6.0      GEOTECHNICAL RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.

6.1       Development Limitations
It is anticipated earthworks may include cuts for the basement level of up to about 4 m deep with minimal
filling (<0.5 m high) expected to be required to form finished surface levels and for landscaping. Should
proposed cuts/fills exceed these levels, Tectonic must assess the impacts on slope stability before
construction.

6.2       Earthworks – General
6.2.1       Site Preparation and Trafficability
Following removal of the existing buildings and associated construction elements (e.g. footings, services,
etc.), any tree stumps and large roots should be ‘grubbed out’. Any organic rich topsoil and uncontrolled fill
should then be stripped and set aside. Based on site observations, topsoil (where present) stripping depths
should generally range between 0.1 m and 0.2 m BGL, with uncontrolled fill encountered to depths of 0.4 m
to 0.7 m BGL (existing ground levels). It is noted that deeper pockets of topsoil or uncontrolled fill may exist
and deeper, localised grubbing out of tree roots may be required.
Topsoil materials must not be used in structural fill; however, may be placed across landscaping areas.
Unsuitable natural material such as any saturated, loose or soft materials encountered should also be
removed during subgrade preparation for bulk earthworks.

It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition of
substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically
a vibrating plate). Care must be taken with the use of vibratory equipment (e.g. compactors or sheet piling)
to ensure that there are no adverse impacts on surrounding structures. The impacts from ground vibration
must be closely monitored and managed during construction. It would be prudent to conduct a dilapidation
survey of neighbouring structures prior to commencement of construction.

The exposed natural subgrade following excavations will likely be in a loose condition and must be
compacted by several passes of a vibrating plate or minimum 4 tonne vibrating smooth drum roller, in
conjunction with surface application of ample water, to achieve the required compaction. As set out above,
impacts from vibrations should be closely monitored and a dilapidation survey would be prudent.
Due to the potential for poor trafficability during construction activities, a minimum 150 mm thick granular
working platform may be required on soil subgrades along haul roads and across laydown areas. Specific
platform design would be required prior to mobilisation and trafficking of any heavy mobile plant on the site
(e.g. cranes, concrete pumps or piling rigs)

Construction areas and surrounds should be graded to shed surface water runoff. Swale drains should be
constructed along the crest and toe of any cuts, and above fill batters, where possible. Drains are to be
graded to discharge collected waters to a control point(s) away from construction elements before release
into existing stormwater infrastructure.

It should be noted that during wet weather, the natural soils may cause sediment run-off. Appropriate
erosion and sediment control measures must be installed prior to commencement of earthworks at this site.

6.2.2       Excavations
Excavations through the soils encountered in the boreholes should be achievable using conventional
earthmoving plant (e.g. small or larger excavators with toothed buckets). Temporary, unsurchaged cuts in
the very loose to loose sand could be formed at 1V:2H and at 1V:1.5H in medium dense (or denser) sand for
batters up to 3 m in height. Flatter batters or temporary retention may be required if groundwater seepage is
encountered or if sloughing of dry sand occurs at the batter surface. Deeper unretained cuts, if required,
should be specifically assessed by Tectonic.


29 June 2022
Report No. 22227-001-Rev0                              10

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

geotech and slope stability.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.