geotech and slope stability · MCU22/0145
PROPOSED UNIT DEVELOPMENT
3 HENDERSON STREET, SUNSHINE BEACH
therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require greater
width (horizontally) for installation as compared to sheet piles and are often more expensive.
The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation of
the proposed retention and subsurface drainage system. It will be necessary to conduct numerical analysis
to optimise the retention system. Detailed design will also need to account for relevant factors of safety to
maintain the temporary and long-term stability of the retention system.
Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping backfill,
will require engineer design and certification of construction. Retaining wall design should be carried out in
accordance with AS4678-2002 Earth retaining structures.
Design for temporary and permanent retaining structures could be carried out using a pressure distribution
applicable to the wall type (e.g. trapezoidal for propped or anchored walls) and based on the parameters
listed in Table 4. These values do not include allowance for hydrostatic pressures nor transient (e.g.
construction) or adjacent footing loadings.
Table 4: Retaining Structure Design Parameters
Lateral earth pressure coefficients
Unit
Friction
Retained material weight
angle (°) Ka Ko
(t/m3) Kp
(Cantilever wall) (Non-yielding wall)
Very Loose/ Loose
1.8 28 0.36 0.53 2.77
Sands
Medium Dense (or
1.9 34 0.28 0.44 3.54
Denser) Sands
Future Controlled Fill* * * * * *
Note: * Depends on fill material type and level of compaction.
As a minimum, retaining structures must be founded as per the recommendations in Section 6.3.2 above
with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed design
must include an assessment of internal and global stability, together with required bearing pressure and
founding depth, by the retaining wall design engineer.
A solution using screw piles to support retaining walls, possibly including raked piles, may be feasible
although bending and shear capacities would need to be carefully checked in design from a soil-structure
interaction viewpoint. Additional lateral capacity may be achieved by incorporating a deeper pile cap that also
acts as a shear key attracting passive resistance in the sands in front of the wall.
6.5 Drainage
Surface diversion drainage should be constructed above the crest of any new cut or fill embankment or
retaining walls (e.g. grassed or landscaped swales or diversion mounds). Adequate site drainage must be
installed to ensure that stormwater runoff is directed away from building walls, footings, batters and retaining
walls.
Although unlikely, if groundwater seepage is encountered during excavations, Tectonic must be notified to
assess the impact on stability.
Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
accounted for in the design of the retaining structure.
29 June 2022
Report No. 22227-001-Rev0 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
geotech and slope stability.pdfRelated documentApplication case desk ↗