5.0 FLOODING ASSESSMENT SUMMARY
Refer to Flood Assessment Report Revision 3 for the detailed flood assessment. See also Plan
2035-01 Revision E showing approximate Q100 inundation line. Below summarises the
findings of the flood assessment.
5.1 Existing Conditions
The site is traversed by one tributary of Six Mile Creek; refer to plan 2035-01 Revision E.
The site is subject to floodwaters from the adjacent watercourse and the Q100 year ARI flood
levels (see plan 2035-01 Revision E).
5.2 Proposed Drainage System and Flood Implications
The proposed residential lots front the creek’s floodway will have at least 1.0 metre freeboard to
the Year 2100 1%AEP flood level and the proposed development will therefore be adequately
flood-immune, even with a 20% impost on the design rainfalls for future climate change.
The required 100-year stormwater detention volume of 334m3 can be achieved, within the site’s
constraints, by a 342m3 open basin. A more complex modelling procedure at the Operational
Works stage, using the Bureau of Meteorology’s 2016 design rainfall data, could result in a
slightly smaller detention volume.
The open basin will have a 100-year water depth of 0.8 metres. The freeboard of 0.25 metres to
the embankment crest/footpath will be sufficient to contain the inflows from a greenhouse-
induced 20 percent increase in storm rainfall intensities.
See the Flood Study report for further details on flood modelling results.
19
2035 2 Pearsons Road IWMP – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.