Original source · versioned page text
5179IWMP_Rev3
Callaghan & Toth 1.0 SUMMARY This integrated water management plan (IWMP) has been prepared as part of a Reconfiguration of a Lot application to Noosa Council for the proposed residential development located at 2 Pearsons Road, Cooroy. The development includes: • Fifteen new residential lots; • New park – balance lot; • New road; • Easement for Access and Services; • Landscaping; and • Bioretention Systems in park and road reserve. The key points of this investigation are as follows: 1. Runoff from new roadways, footpaths and allotments is to be cleaned of nutrients and gross pollutants via a stormwater treatment system prior to being released to existing waterways. 2. The stormwater treatment system includes: a. One Bioretention Basin located in the new park, and b. Four biopods in the road reserve. 3. The increase in pollutant loads due to the increase in impervious areas is to be attenuated. 4. Stormwater Detention is to achieve no increase in runoff concentration by the following measures: a. Detention basin adjacent to the vegetated swale, and b. Detention within the bioretention systems. 5 2035 2 Pearsons Road IWMP – Revision 3 April 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.