Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2017-06-06 Services & Organisation Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                         AGENDA


   Services & Organisation
     Committee Meeting


                  Tuesday, 6 June 2017


                    commencing at 1.30pm
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Frank Pardon (Chair), Jess Glasgow, Tony Wellington, Frank Wilkie




                      “Noosa Shire – different by nature”
Log in to download the original file

2017-06-06 Services & Organisation Committee Agenda(PDF, 19MB).pdf · 20.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 89 (of 94)

Section 2

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA              6 JUNE 2017


TABLE OF CONTENTS

ITEM                                                                  PAGE
ATTENDANCE & APOLOGIES                                                   -
PRESENTATIONS                                                            -
REPORTS FOR CONSIDERATION OF THE COMMITTEE                               3
1      NOOSA TRANSPORT STRATEGY 2017-2027 - ADOPTION                     3
2      CAPITAL PROGRAM DELIVERY STATUS - APRIL 2017                     10
3      1617T111 ALERT FLOOD WARNING STATIONS                            25
4      FUTURE OF HANG GLIDING AND PARAGLIDING ACTIVITY - TINGIRA
       CRESCENT SUNRISE BEACH                                           29
5      ASSESSMENT OF EXPRESSIONS OF INTEREST FOR COMMERCIAL HIGH
       USE PERMITS (1617E119)                                           39
6      NON-CURRENT ASSET ACCOUNTING POLICY UPDATE                       58
7      2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
       GRANTS (ROUND ONE) - PROGRAMS                                    70
8      2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
       GRANTS (ROUND ONE) - EVENTS                                      74
9      2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
       GRANTS (ROUND ONE) - EQUIPMENT                                   76
10     2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
       GRANTS (ROUND ONE) - INFRASTRUCTURE                              78
11     REGIONAL ARTS DEVELOPMENT FUND - GRANT RECOMMENDATIONS -
       2016/17                                                          80
REPORTS FOR NOTING BY THE COMMITTEE                                     84
12     PLANNING & INFRASTRUCTURE DEPARTMENT UPDATE - 3RD QUARTER
       2016-17                                                          84
CLOSED SESSION                                                     -




                                                              Page 2 of 94

Section 3

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          6 JUNE 2017



REPORTS FOR CONSIDERATION OF THE COMMITTEE

1     NOOSA TRANSPORT STRATEGY 2017-2027 - ADOPTION
Author            Project Officer, Joanna Ferris
                  Planning & Infrastructure Department

Index             ECM /Subject / Transport Policy
                  ECM / Project & Contract / Transport Strategy

Attachments       1.   Transport Strategy 2017-2027 (26pg attachment provided separately to this report)
                  2.   Transport Policy - proposed amendments


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Project Officer to the Services & Organisation Committee
Meeting dated 6 June 2017, and:
A.    Adopt the Transport Strategy 2017-2027, provided at Attachment 1 to the report; and
B.    Adopt the amended Transport Policy provided at Attachment 2 to the report.


REPORT
The purpose of this report is to approve the final Transport Strategy 2017-2027 for
implementation.

1.    Background

In late 2015, independent consultants, Parsons Brinckerhoff, were engaged to provide advice on
contemporary global responses to transport challenges. They were also asked to provide input
into transport in Noosa - where we are now, where we want to be, and how we might get there.

Based on the work of Parsons Brinkerhoff, stakeholder & community feedback and Councillor
workshops, a draft Transport Strategy document has been developed which provides a transport
vision, key principles, challenges, desired outcomes and proposed priority actions.

A timeline of the engagement and consultation undertaken is provided in the table below:

Timeline                      Activity
January 2016                  Engagement with key stakeholders and the community
May 2016                      Second and larger phase of stakeholder and community engagement
November 2016                 Transport Policy adopted
September 2016                Transport strategy workshops with Councillors
January & February 2017
April 2017                    Engagement with key stakeholders and the community on the draft
                              Transport Strategy
May 2017                      Transport Strategy workshop with Councillors



                                                                                          Page 3 of 94

Section 4

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     6 JUNE 2017


2.   Draft Transport Strategy Amendments

At Council’s Ordinary Meeting of 16 March 2017, a draft Transport Strategy 2017-20217 was
adopted for the purposes of consultation.

Consultation included (but was not limited to):
  13 March – Stakeholder presentation
  Cooroy & Noosa Library Pop-ups including manned pop ups on 23 March and 6 April
    respectively
  25 March – Cooroy “Have your say day”
  1 April – Noosa Junction “Have your say day”
   2 April – Noosa Farmers market “Have your say day”
   8 April – Pomona “Have your say day”
   9 April – Hastings Street “Have your say day”
   Meetings with key stakeholders (Hastings St Association, Tourism Noosa, Noosa
     Residents & Ratepayers Association)
   Facebook posts
   Media releases

A total of 244 submissions were received. In regard to the six proposed strategies there was
general support for Park & Ride, Noosa Style Shuttle Bus, and Active Travel to Schools Program,
mixed support for priority transport lanes and car parking management controls and no support
for the congestion charge.

Based on consultation, changes to the Draft Transport Strategy include (but are not limited to):
   A revised transport vision
   Removal of Principle 2
   Amendments to desired outcomes 1 & 7
   Removal of congestion charge as a short term strategy
   Slight amendments to Park-and-Ride, Noosa Style Bus, and Priority Transport Lanes
   Renaming of Active Travel to Schools Program to Walk and Ride to School Program
   Inclusion of two new sections: Innovation and Evaluation.

3.   Transport Policy Amendments

The Transport Policy underpins the Transport Strategy. Based on community and stakeholder
feedback on the Draft Transport Strategy it is proposed to amend the Transport Policy to include
the transport vision, and update the principles and desired outcomes. Refer to Attachment 2 for
proposed amendments.




                                                                                     Page 4 of 94

Section 5

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    6 JUNE 2017


Previous Council Consideration

Ordinary Meeting, 16 March 2017, Item 5, Page 12
That Council note the report by the Project Officer to the General Committee Meeting dated 13
March 2017 and:
A.   Adopt the draft Transport Strategy 2017-2027, provided at Attachment 1 to the report; for
     the purposes of community consultation, with the inclusion of the following amendments
     which reflect the changes approved for the Transport Policy in the motion to the Ordinary
     Meeting of 17 November 2016, specifically:
     1.   Under Principles (page 4), add a 9th dot point to read:
               Design for, encourage and facilitate transport options that reduce the emissions
                 produced by our community.
     2.   Under Desired Outcomes (page 7), amend items 2 and 11 to read:
          2      The transport network is designed to facilitate and encourage an overall modal
                 shift away from private car use towards more sustainable transport modes
                 including walking, cycling, public transport, electric vehicles and motor
                 scooters/cycles.
          11 Road crossings and associated pedestrian networks are safe and accessible
                 for mobility scooters, cyclists and pedestrians.
B.   Amend the Transport Policy as follows:
     1.   Under Policy Background, at paragraph 3, change the words “Council’s transport
          vision for the Noosa Shire is one that means” to “Council’s transport aims for the
          Noosa Shire would mean”; and
     2.   Within the Policy Background section, add the words: “Council’s transport vision for
          the Noosa Shire: Noosa Shire enjoys an efficient, free flowing transport system that
          enhances resident and visitor experiences”.

Finance & Risk

The Transport Strategy is a key document which will provide guidance for the next 10 years on
addressing the transport challenges faced in the Noosa Shire. Failure to have such a strategy will
result in haphazard responses, which will not be aligned to specific outcomes improving issues of
congestion, car parking, public transport and active transport.

The Transport Strategy can also lead to the deferral or removal of planned expenditure
associated with future intersection upgrades and other road infrastructure.

Consultation

External Consultation - Community & Stakeholder

Refer to Section 2 of the report.

Internal Consultation
    Councillor workshops
    Transport Strategy Project Control Group & Sub-group




                                                                                    Page 5 of 94

Section 6

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                   6 JUNE 2017


Departments/Sections Consulted:

X   Chief Executive Officer                X   Community Services                 x   Corporate Services
X   Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
    Executive Support                      X   Community Development                  ICT
                                               Libraries & Galleries                  Procurement & Fleet
                                           X   Local Laws                             Property & Facilities
                                               Waste & Environmental Health           Revenue Services

X   Executive Office                       X   Planning & Infrastructure
X   Community Engagement                       Building & Plumbing Services
X   Customer Service                           Civil Operations
X   Economic Development                       Disaster Management
    Governance                             X   Infrastructure Planning & Design
    Human Resources                        X   Planning & Environment
X   Sustainability                         X   Strategic Land Use Planning




                                                                                                   Page 6 of 94

Section 7

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     6 JUNE 2017


                                                   ATTACHMENT 2




                                                     Page 7 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      6 JUNE 2017

                                                                                  ATTACHMENT 2

      | ¢ » |   NOOSA                                                        Council Policy
      mm mi     Rees                                                        TRANSPORT
     Corporate Plan Reference:                Establishing new policies_and_strategies
    |                                        | Theme 4: Long term planning for Noosa Shire
     Endorsed by Council:                     44Noevember 204615 June 2017
     Policy Author:                            Director Planning & Infrastructure

    POLICY BACKGROUND

    The ‘Noosa Lifestyle’ is of critical importance to the Noosa community and Noosa Council. There is
    a strong focus on a laid-back environment without big city symbols. It is about being connected to
    the local landscape, enjoying a relaxed way of living and having sustainable transport options that
    support our way Of life.
    If our lifestyle is to be protected into the future, then the ultimate aim would be for a culture to be
    developed where the Noosa community can be considered to be ‘freed from car dependency’.
    Council’s transport vision for Noosa Shire is:
    Noosa_ Shire enjoys an efficient, free flowing, innovative transport system that enhances resident
    and visitor experiences, and in results in sustainable environmental outcomes.
    Council's transport vision for the Noosa Shire is one that means:
    °    for residents of and visitors to villages and urban communities in Noosa, there will be limited
         need to use a car
    °    walking, cycling and public transport are the preferred means of moving around the coastal
         area
    °    community transport and ride share services are the preferred means of moving around the
         hinterland, where walking and cycling distances are too great
    °    bus and train are the preferred method of travel to and from Brisbane
    e    delivery services and non-transport solutions such as high speed internet reduce the need for
         individual travel
    °    the wider community and not just locals share in this vision

    Council's transport mission for the Noosa Shire is:
          To encourage alternative transport usage and reduce
                            dependence on private cars

                                                                                      Page 7 of 94

Section 8

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 8 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      6 JUNE 2017

 COUNCIL POLICY - TRANSPORT

 COUNCIL POLICY

 Transport Principles
 Council commits to its transport mission by embedding the Transport Principles outlined below into
 all Council transport and transport related planning, infrastructure and decision making.
 The principles below have been developed to ensure there is corporate alignment with the Council's
 transport mission in order to realise Council's transport vision- Noosa Council will:
 «1. __ Encourage transport options that meets the needs of both locals and visitors

        -

 «2.   __Prioritise our focus on moving people and goods rather than on moving cars
 *3. _ Provide infrastructure and services that are designed to give priority to pedestrians, cyclists
       and public transport over private cars
 24. _ Improve the safety and amenity of pedestrians and cyclists in our transport infrastructure
 *5.  Address peak time traffic congestion by reducing traffic rather than increasing road capacity
 *6.  _Accommodate changes in transportation technology
 #7. _ Align our organisational transport options and usage with Council’s Zero Emissions
       Strategy and the above principles.
 «8.   Design for, encourage and facilitate transport options that reduce the emissions produced
       by our community.

 TransportKey Desired Outcomes
 It is anticipated that these principles will provide organisational focus and deliver the following key
 outcomes:
 1.    Residents and workers inthe-coastalurban-areas-of the Noosa Shire andinthe-hinteriand
      towaships-are able to go about their everyday business without Aasedingtouse-ahaving to be
       reliant on private-car vehicles.
 2. — The transport network is designed to facilitate and encourage an overall modal shift away from
       private car use towards more sustainable transport modes including walking, cycling, public
      transport, electric vehicles and motor scooters/ cycles.
 3. | The transport system supports the preferred pattern of development including the local centres
       hierarchy, and is consistent with our planning scheme.
4.     Key regional destinations such as hospitals, airports and universities are readily accessible by
       public transport from Noosa Shire.
 5.   All schools are safely and conveniently accessible by walking, cycling and public transport.
6.     Parking is closely managed through effective controls.
 7.   There has been a change in behaviour by visitorste-people in Noosa with a reduction in the
       number choosing to drive and park_cars in congested coastal areas.
8.     Park-and-Ride facilities have been provided to assist with managing visitor travel demand
      where supported by transport services.
 9.   The transport system supports the local lifestyle and also tourism by delivering both active and
       public transport infrastructure that meet the needs of locals and visitors.

                                                                                        Page 8 of 94

Section 9

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 9 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         6 JUNE 2017

COUNCIL POLICY - TRANSPORT
10.   Local public transport routes offer efficient-high-and frequency services.
11.   Road crossings and associated pedestrian networks are safe and accessible for mobility
      scooters, cyclists and pedestrians.
12.   The community at all levels is educated about the costs and benefits of their travel choices, to
      be able to make informed decisions.
13.   Alternative transport is cost effective for users and providers as compared with private car use.
14.   _New technologies are being used in our transport solutions.
44.15. Transport initiatives result in significantly reduced greenhouse gas emissions.

ROLES AND RESPONSIBILITIES

This policy applies to all Council activities and all Councillors, officers, consultants and contractors
involved in, and with responsibility for, contributing towards the achievement of Council’s objectives,
asset management, advocacy and reporting responsibilities in relation to transport and transport
related infrastructure.

RELEVANT LEGISLATION

Local Government Act 2009

  Version control
   Version   Reason/ Trigger                Change (Y/N) Endorsed/ Reviewed by     Date

                                                                                          Page 9 of 94

Section 10

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          6 JUNE 2017


2                        CAPITAL PROGRAM DELIVERY STATUS - APRIL 2017
DOCUMENT INFORM AT ION




Author                             Asset Planning Coordinator, Bryan O’Connor
                                   Planning & Infrastructure Department

Index                              ECM/ Subject/ 2016-2017 Annual Capital Works Program

Attachments                        1.   Capital Projects Delivery Status, 30 April 2017


EXECUTIVE SUMMARY
The project delivery status report is presented regularly to the Services & Organisation
Committee. This report particularly highlights the projects that have commenced or are nearing
completion over the 2016/2017 financial year.

This report also provides a capital project delivery spreadsheet (Attachment 1) that gives a
general overview of the financial status of all projects as they are delivered.

RECOMMENDATION
That Council note the report by the Asset Planning Coordinator to the Services & Organisation
Committee Meeting dated 6 June 2017 providing an update on the status of the projects currently
being delivered in the 2016/17 Capital Works Program, and endorse the name change of the
Capital Works Project Control Group to Capital Works Executive.



REPORT
The purpose of this report is to inform Council of the overall status and associated activities of
the Capital Works Program to the end of April 2017. The report also provides an opportunity to
highlight and discuss projects within the program, and also confirm the delivery status of projects
as they are delivered throughout the 2016/2017 financial year.

There are currently 163 active projects (not including the individual site specific bus stop projects)
in the 2016/17 capital program as of 30 April 2017 (including the carryover projects from
2015/2016) with a value of $24.6M.

1.                       Current Projects

The Project Delivery and Design staff in the first half of the financial year were focused on the
planning and design phases of the majority of projects within the Capital Works Program. Whilst
these stages of projects require significant internal resourcing it usually results in limited
expenditure being recorded against the projects when compared with construction phases that
consume high expense in shorter periods of time.

The construction phase of projects has progressively increased over the past 3 months and will
continue through to the end of June 2017. It is important to note that the commitments reflect the
extent of planning, design and activities undertaken with $8.3M of commitments raised as of the
30 April 2017 and a total of $10.3M of actuals expended.




                                                                                          Page 10 of 94

Section 11

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                       6 JUNE 2017


                  Peregian Beach – Rufuos Street Development




           Pomona - Station Road Car Parking and Safety Improvements




                                                                       Page 11 of 94

Section 12

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  6 JUNE 2017


The project delivery approach for 2016/17 has seen the majority of projects well underway by the
third quarter of the financial year. The final quarter will be utilised for the completion and
finalisation of the current program and planning for the next financial year’s program.

There are a number of projects now well into the construction and delivery phase and these
include:

Pomona                Station Street Car Parking and Safety Improvements
Noosaville            Eumundi Road - Landfill Entrance Road to Briteside
Peregian Beach        Rufous St Digital Hub
Whole of Shire        Bus Stop Disability Program
Whole of Shire        Road Pavement Reseal Program
Noosaville            Lake Weyba Drive Culvert renewals
Noosaville            Foreshore Park Furniture Renewal


                       Noosaville – Lake Weyba Dr Culvert Renewals




                    Noosaville - Eumundi Landfill Entrance Road works




                                                                                 Page 12 of 94

Section 13

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                6 JUNE 2017


2.     Completed Projects

Projects continue to be delivered across the capital program with many projects well underway.
Some recently completed projects include:

Noosaville             Munna Point Geotextile Foreshore protection
Sunshine Beach         Ben Lexcen Drive Road Corridor Improvements
Sunshine Beach         Noosa Aquatic Centre Overflow Carpark Drainage
Tewantin               Noosa Council - Art Gallery Storage Facility



                  Castaways Beach – David Low Way Bus Stop Renewal




                       Tewantin – Art Gallery Storage Facility Upgrade




              Before                                     After



                                                                                Page 13 of 94

Section 14

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     6 JUNE 2017


In addition to the above mentioned projects that are completed, the focus on planning for the
2016/17 road reseal program has shifted to the delivery phase, with Reef Street Noosaville,
Eenie Creek Road, Sunshine Beach Road Noosa Heads and sections of Cooroy Noosa Road
Tewantin overlayed since January with other sections of arterial roads and hinterland roads to be
resurfaced by the end of June 2017.

3.   Asset Management Programs

The main focus of this report is focused on construction type projects but there are a number of
annual and cyclical projects that are currently being delivered across the capital program and
these include:
   CCTV stormwater condition inspection program;
   Whole of Shire asset condition assessments;
   The gravel re-sheeting program;
   Stormwater structures & stormwater pipes renewal programs; and
   The asset management system mobility project.

These projects are aligned to Council’s asset management focus and asset condition inspection
programs which then determine the future capital renewal programs.

4.   Capital Works Project Control Group

Council, at the Ordinary Meeting on 17 November 2016 endorsed the establishment of the
Capital Works Project Control Group (CWPCG) nominating Crs Pardon & Glasgow as members.

To improve the effectiveness of the CWPCG it was agreed to form two sub Project Control
Groups comprising project officers (the Infrastructure Project Control Group and the Community
& Corporate Services Project Control Group) to inform the CWPCG. To alleviate the confusion in
names it is recommended that the Capital Works Project Control Group be renamed the Capital
Works Executive.

5.   Summary

The delivery and completion of projects continues across the Capital Works Program. With more
resources to be recruited in coming weeks there will be a further increase in the delivery phase of
the projects. The program will see the majority of projects scheduled to be either completed or
well underway prior to the end of June 2017. Council staff have completed recruitment for more
design and project delivery resources which has seen an advancement in the delivery of designs
for the current and future Capital Works Programs.

The current capital delivery expenditure to the 30 April 2017 including actuals and commitments
is $18.6m or 75% of the capital program and with the project design & delivery teams continuing
to remain focused on completing the majority of projects by the end of the financial year. There
are a number of significant projects with large remaining commitments that are on track to being
completed prior to the end of June which include:

Whole of Shire Reseal & Rehabilitation Program                 $ 4.2m (Remaining commitments)
Noosaville, Thomas Street & Gympie Terrace Culverts            $ 401k (Remaining commitments)
Peregian Beach, Rufous St Civil Works                          $ 499k (Remaining commitments)
Peregian Beach, 5 Rufous St Redevelopment Construction         $ 888k (Remaining commitments)
Black Mountain Rd Landslip                                     $ 194k (Remaining commitments)




                                                                                    Page 14 of 94

Section 15

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    6 JUNE 2017


The table and graph below provide a breakdown of expenditure as at 30 April 2017.

YTD Actual Expenditure                                                     $10,293,702
Committed Expenditure                                                       $ 8,346,117
Remaining Capital Expenditure                                               $ 5,953,656
Full Year Budgeted Expenditure                                             $24,593,475


                      Current Capital Works Program Expenditure as of 30/04/2017

       Remaining Capital
         Expenditure
           24.21%

                                                                               YTD Actual
                                                                              Expenditure
                                                                                41.86%




        Committed
        Expenditure
          33.94%



Previous Council Consideration

Ordinary Meeting, 17 November 2016, Item 5, Page 8
That Council note the report by the Asset Planning Coordinator to the Services & Organisation
Committee Meeting dated 8 November 2016 providing an update on the status of the projects
currently being delivered in the 2016/17 Capital Works Programme and:
A.      Note that Council has achieved 36% of actuals and commitments compared to total budget
        as at 28 October 2016,
B.      Endorse the establishment of a Project Control Group to assist in the coordination of the
        delivery of the Capital Works Programme; and
C.      Nominate Crs. Pardon & Glasgow as members of the Project Control Group.


Finance & Risk

Nil.




                                                                                   Page 15 of 94

Section 16

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                      6 JUNE 2017


Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Project delivery staff within the Planning and Infrastructure Department were consulted in the
preparation of this report.

Departments/Sections Consulted:

X      Chief Executive Officer                X   Community Services                 X   Corporate Services
       Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
       Executive Support                          Community Development                  ICT
                                                  Libraries & Galleries                  Procurement & Fleet
                                                  Local Laws                             Property & Facilities
                                                  Waste & Environmental Health           Revenue Services

       Executive Office                       X   Planning & Infrastructure
       Community Engagement                       Building & Plumbing Services
       Customer Service                           Civil Operations
       Economic Development                   X   Infrastructure Planning & Design
       Governance                                 Planning & Environment
       Human Resources                            Strategic Land Use Planning
       Sustainability




                                                                                                     Page 16 of 94

Section 17

ATTACHMENT 1




Page 17 of 94

Noosa Council
        5                                                                                                                                                                                                       ATTACHMENT 1
Capital Schedule
  As at: 30-Apr-2017

                                                                                                                                                                                                                                 % of Annual
   Works                                                                                                                      BR1                                                                                                     Budget
   Project                                                                                               Original      Carryover               BR2              BR3          Current      Year To Date         Remaining               Spent
    Code           Finance Project Number - Description                                                   Budget           Budget           Budget           Budget      Budget YTD              Actual     Commitments             (Actuals)
OFT ee R Cel c                                                                                         19,315,625       22,510,078       20,958,100       20,191,314        13,877,804         7,502,472          7,712,450
Bridges
    500003         500003 - Noosaville - Munna Point Bridge Stage 2                                              0           38,706           38,706           88,293           88,293            14,594              4,008            16.53%
    500500         500500 - Cooroy Mary River Road Timber Bridge Rehabilitation                                  0           41,887           41,887                0                0            15,648                  0             0.00%
    500501         500501 - Cooroy, Cooroy- Belli Creek Road Timber Bridge deck resurfac                         0                0                0           20,023           20,023             4,482                  0            22.38%
    500503         500503 - Whole of Shire Bridge replacement program - Planning and des                   100,000          119,744          119,744          119,744           87,244            28,674             58,260            23.95%
    500723         500723 - Tablelands A Bridge Rehabilitation                                                   0           97,000           97,000           97,000           97,000            94,296                  0            97.21%
    500724         500724 - Tablelands B Bridge Rehabilitation                                                   0           35,400           35,400           35,400           35,400            38,032                  0           107.43%
    500725         500725 - Wahpunga Road Bridge Renewal Kin Kin                                                 0           47,600           57,600           57,600           57,600            60,264                  0           104.63%
    500732         500732 - Munna Point Bridge Footpath                                                          0                0           77,000           60,000           37,000            75,019                  0           125.03%
    500733         500733 - Munna Point Bridge Deck Joint Replacement                                            0                0           37,000           56,318           56,318            57,790              3,455           102.61%
                                                                                    Total Bridges          100,000          380,337          504,337          534,378          478,878           388,798             65,722            72.76%
Coastal Canals and Waterways
    100721          100721 - Gympie Terrace and William Street Revetment wall and pathway                        0                0                0            3,407            3,407             3,475                  0           102.00%
    500004         500004 - Noosaville - Gympie Tce / Williams St                                                0           11,070           26,070           21,984           21,984            22,530                  0           102.48%
    500510         500510 - Noosa Main Beach - Sand Pumping Pipe Replacement Program                        50,000           50,000           50,000           19,971            -3,779           20,646                  0           103.38%
    500612         500598 - Munna Pnt Foreshore Rehab Stg 2 Design Drawings and Approval                         0            5,574           15,274            4,099            4,099            16,127              9,680           393.43%
    500650         500650 - Whole of Shire, Dune Fencing Rehabilitation                                     20,000           20,000           35,000           39,843           39,843            39,843                  0           100.00%
    500691         500691 - Noosaville, Noosa River Timber Retaining Wall, Steps and Lan                    50,000           50,000           38,000           36,233           36,233            36,233                  0           100.00%
    500692         500692 - Noosaville, Munna Point Foreshore Protection Stage 2                           280,000          280,000          280,000          280,000          114,100           179,203             33,357            64.00%
    500722         500722 - Noosa Main Beach Tower Roof Replacement                                              0                0           15,658           15,658           15,658            15,788                  0           100.83%
                                                              Total Coastal Canals and Waterways          400,000           416,644          460,002          421,195          231,545           333,845             43,037            79.26%
Cemeteries
    500690         500690 - Tewantin Cemetery, Erection of Donated Granite Niche Wall                       17,500           17,500           17,500           17,500                0                 0              1,955             0.00%
                                                                                 Total Cemeteries           17,500           17,500           17,500           17,500                0                 0              1,955             0.00%
Commerical Land & Property
    500207         500207 - Rufous St Design & Development Phase                                                 0           90,939           90,939           90,939           90,939            96,259              3,205           105.85%
    500511         500511 - Sunrise Beach Shopping Centre Refurbishment                                          0                0                0                0                0               534                  0             0.00%
    500693         500693 - Peregian Beach, 5 Rufous St Redevelopment Construction                       2,900,000        2,900,000        1,000,000        1,000,000          224,397           111,781            888,219            11.18%
    500730         500730 - Peregian Beach, Rufous St Civil Works                                                0                0          955,000          955,000          202,334           102,334            499,848            10.72%
                                                                Total Commerical Land & Property         2,900,000        2,990,939        2,045,939        2,045,939          517,670           310,908          1,391,273            15.20%

                                                                                                                                                                                                                Page 17 of 94

Section 18

Page 18 of 94

Community Facilities
     100726         100726 - Peregian Surf Club Public Amenities - Planning & Design                   25,000          25,000               0               0               0              526                0             0.00%
    500073          500073 - Tait Duke House - relocation                                                  0                0               0               0               0              456                0             0.00%
    500512          500512 - Sunshine Beach NAC - Hydraulics Report 50mtr pool filtration                  0            6,500           6,500               0               0           -3,500                0             0.00%
    500515          500515 - Noosa Heads Surf Club Public Amentities Refurbishment                         0                0         105,555         105,555         105,555          105,555                0           100.00%
    500516          500516 - Sunshine Beach NAC - Replacement of Program Pool heat pump                    0           13,444          13,444           9,545           9,545            9,545                0           100.01%
    500538          500538 - NLC - Stage 2 Construction of redesigned reception area                       0                0               0               0               0              750                0             0.00%
    500539          500539 - Noosa Heads Demolition of Lifeguard Service/ SLSQ operations                  0           21,000               0               0               0                0                0             0.00%
    500617          500603 - Noosa Leisure Centre and The J - Evac Centre Switchboards                     0           14,500          14,500           9,500           9,500            9,500                0           100.00%
    500651          500651 - Noosaville Library, Refurbishment Planning and Design                    50,000          50,000          50,000          50,000          50,000             3,235           44,274             6.47%
    500652          500652 - Tewantin, Noosa Gallery Artworks Storage                                  25,000          25,000          25,000          25,000               0              510             7,776            2.04%
    500653          500653 - Noosa Heads, Lions Park Public Amenities Refurbishment                    95,000          95,000          95,000          10,000          10,000            1,634                0            16.34%
    500654          500654 - Noosaville, Noosa Leisure Centre Floor Cleaner                            11,200          11,200          11,200          11,200          11,200           11,028                0            98.46%
    500655          500655 - Noosaville, Noosa Leisure Centre Replace Stadium Lighting                 31,500          31,500          31,500          27,817          27,817           27,817                0           100.00%
    500656          500656 - Noosaville, Wallace Park Precinct Signage                                 10,000          10,000          10,000          10,000          10,000            9,484                0            94.84%
    500657          500657 - Noosa Heads, The J Sound and Lighting Equipment                          30,000           30,000         30,000          30,000           25,000            8,570            17,291           28.57%
    500658          500658 - Cooroy Library, Repairs to Strip Lighting                                 25,000          25,000          25,000         95,000           95,000              129                0             0.14%
    500659          500659 - Noosaville, Noosa Leisure Centre Café Area Floor Resurfacing               6,275           6,275           6,275           6,275               0                0                0             0.00%
    500660          500660 - Cooroy, Mill Place Boiler House Remedial Works, Stage 3                  180,000         180,000         180,000         180,000         120,000          116,110                0            64.51%
    500694          500694 - Noosaville, Noosa Leisure Centre External Storage Unit                    10,000          10,000          10,000          10,000               0                0             9,160            0.00%
    500695          500695 - Noosa Heads, The J Upgrade Theatre Seating Capacity                       70,000          70,000          70,000         120,000         120,000           14,203           77,098            11.84%
    500696          500696 - Noosaville Noosa Leisure Centre - Stadium Fans                           30,000          30,000          30,000           27,500          27,500           27,500                0           100.00%
    500697          500697 - Sunrise Beach, Noosa Aquatic Centre Gym Equipment                        63,000          63,000          63,000           89,943          89,943          89,943                 0           100.00%
    500718          500718 - Hasting Street Electrical Lighting Switchboard Replacement                    0                0               0           7,673           7,673            7,673                0           100.00%
    500728          500728 - Noosa Regional Art Gallery Sound System                                       0                0          12,600          12,600          12,600           12,600                0           100.00%
    500729          500729 - Noosa Museum Roof Replacement                                                 0                0         20,000           17,104          17,104           17,104                0           100.00%
    500731          500731 - Sunshine Beach, NAC Overflow Carpark Drainage                                 0                0         29,000          29,000          29,000            40,766                0           140.57%
    500750          500750 - Sunshine Beach NAC 50 metre pool blanket                                      0                0               0          45,000          45,000           11,094                0            24.65%
    500751          500751 - Sunshine Beach NAC 50 metre pool lane rope                                    0                0               0          17,500          17,500           12,809                0            73.19%
    500752          500752 - Tait Duke House Renovation                                                    0                0               0         80,000           80,000           39,325            35,348           49.16%
    500759          500759 - Pomona School of Arts Roof Rectification                                      0                0               0               0               0          36,126                 0             0.00%
    500760          500760 - Sunshine Beach Cold Room Rehabilitation                                       0                0               0           6,500           6,500            6,773                0           104.20%
                                                                    Total Community Facilities        661,975         717,419         838,574       1,032,712        926,437           617,265           190,947           59.77%
Corporate Buildings
    500517          500517 - Noosaville Depot Fire protection system and panel renewal                     0          44,898          44,898          44,898          44,898           44,570                 0            99.27%
    500623          500609 - Customer Service Centre                                                       0           13,632          13,632          21,034          21,034           21,034                0           100.00%
    500698          500698 - Tewantin Administration Building Customer Service Counter Up             150,000         150,000         150,000          10,000               0                0                0             0.00%
    500727          500727 - Noosa Depot Workshop Electrical Replacement                                   0                0           6,847           9,293           9,293            9,293                0           100.00%
    500746          500746 - Tewantin, Tewantin Admin Building Level 1 Aircon                              0                0          10,000          10,000          10,000            8,909                0            89.09%
    500754          500754 - Noosa Community Support Renovation stage 2                                    0                0               0               0               0            6,112                0             0.00%
    500761          500761 - Noosaville Depot - Replacement of ducted air con system                       0                0               0         201,000               0                0                0             0.00%
                                                                     Total Corporate Buildings        150,000        208,530         225,377         296,226           85,226           89,918                0            30.35%

                                                                                                                                                                                                      Page 18 of 94

Section 19

Page 19 of 94

500726         500726 - Flying Fox Sprinkler Installation                                                  0           33,095          33,095           33,095           33,095           31,271                  0           94.49%
                                      Total Environmental Assets, Bushland, Tracks and Trails              0           33,095          33,095           33,095           33,095           31,271                  0            94.49%

500519         500519 - Whole of Shire Gravel Resheeting - Annual Program                            410,000         410,000          410,000          410,000          410,000         229,096               6,818            55.88%
                                                                  Total Gravel Road Network          410,000         410,000          410,000          410,000          410,000         229,096               6,818            55.88%

500030         500030 - Noosa River Holiday Pk- Internal refurb                                            0           11,198               0                0                0                0                  0             0.00%
500626         500612 - North Shore Beachfront Campground — Planning Consultancy                           0           25,000          25,000           22,166           22,166           22,166                  0           100.00%
500661         500661 - Noosa North Shore Campground Redevelopment                                   110,000          110,000         110,000           50,000           50,000           17,485             10,500            34.97%
500662         500662 - Noosaville, Noosa River Holiday Park Small Amenities Replace                 530,000          530,000         541,198           61,198           61,198           23,757              1,626            38.82%
500663         500663 - Noosaville, Noosa River Holiday Park Large Amenities Refurb                  180,000          180,000         180,000                0                0           13,318             12,511             0.00%
500664         500664 - Boreen Point Camp Ground Electrical Mains Board Replacement                   27,500           27,500          27,500           42,511           42,511            1,557              1,327             3.66%
500665         500665 - Boreen Point Camp Ground Main Amenities Plumbing and Tapware                  27,500           27,500          27,500           12,190           12,190           12,793                  0           104.94%
500699         500699 - Boreen Point Campground Installation of 9 Power Sites                         13,150           13,150          13,150           21,000                0                0                  0             0.00%
                                                                         Total Holiday Parks         888,150         924,348          924,348          209,065          188,065           91,076             25,963           43.56%

500110         500110 - Tewantin Spray Park Shade Sail                                                     0           37,264          38,305           38,305           38,305           38,305                  0           100.00%
500522         500522 - Sunshine Beach Skate park renewal - Design                                         0               0                0                0                0              370                  0             0.00%
500523         500523 - Whole of Shire Park shelter - Renewal Park shelters                           45,000          45,000           45,000           45,000           27,000             306                   0             0.68%
500524         500524 - Whole of Shire Playground Refurbishments                                     100,000          100,000         100,000          100,000           60,000            6,528                  0             6.53%
500525         500525 - Whole of Shire Park Furniture Renewal                                         50,000          50,000           50,000           10,000                0                0                  0             0.00%
500551         500551 - Noosa Hinterland Priority Playground - Planning & Design                           0          49,178           49,178           20,000           20,000            1,385                  0             6.93%
500594         500594 - Botanic Garden Shade House                                                         0               0           28,000           28,000                0            2,935                  0            10.48%
500618         500604 - Noosaville Foreshore Park Furniture Replacement                                    0            5,838           5,838            5,838            5,838            5,728               464            98.13%
500627         500613 - Tewantin RSL Park Shade Structure Renewal                                          0          48,093           24,781           23,581           23,581           23,581                  0           100.00%
500666         500666 - Noosaville, Gympie Terrace Park Furniture Renewals                           140,000          140,000         140,000          140,000           98,000           81,174             37,440           57.98%
500667         500667 - Pomona, Skate Park Shade Sail                                                 25,000           25,000          25,000           19,909           15,000           19,909                  0           100.00%
500668         500668 - Sunshine Beach, Skate Park Refurbishment                                     200,000         200,000          200,000           20,000           20,000            6,590              1,065           32.95%
500669         500669 - Noosaville, Munna Park Basketball Court Replacement                           40,000          40,000           40,000           33,689           28,000           33,689                 56           100.00%
500670         500670 - Noosaville, Wyuna Drive Playground Renewal                                    85,000           85,000          85,000           71,511           59,500           71,567                  0           100.08%
500735         500735 - Whole of Shire BBQ Renewals                                                        0               0           98,000           98,000                0                0                  0             0.00%
                                                                  Total Parks & Playgrounds         685,000          825,373          929,102          653,833          395,224         292,066              39,024            44.67%

                                                                                                                                                                                                        Page 19 of 94

Section 20

Page 20 of 94

Pathways & Enabling Facilities:
    500099          500099 - Eenie Creek Pathway Stage 1 Signage                                           0           6,103           6,103          37,168          37,168           16,148            67,830           43.45%
    500103          500103 - Cooroy Noosa Road Corridor Improvement                                        0          48,471         48,471           48,471          48,471           45,166                0            93.18%
    500526          500526 - Noosa Heads Park Road, Boardwalk Design and consultation                      0          30,000          90,000         130,879          130,879         190,249             480            145.36%
    500616          500602 - Sunshine Beach - Solar Bollard Replacement Trial                              0           2,164           2,164           2,164           2,164            1,798                0            83.08%
    500628          500614 - Tewantin Poinciana Avenue Shared Path Upgrade Design & Const                  0          84,224          84,224          84,224          84,224          84,452                 0           100.27%
    500629          500615 - Noosaville Eenie Creek Road Off-Ramp to Underpass Design &                    0          123,043           543             543             543             1,098                0           202.29%
    500630          500616 - Whole of Shire - Noosa Pedestrian and Cycle Data Counters                     0          76,990          76,990          76,990          76,990            2,012                0             2.61%
    500636          500622 - Noosa Heads Noosa Parade Road Corridor Upgrade - Design                       0         161,617         161,617         161,617          161,617         54,420             61,495           33.67%
    500643          500628 - Peregian Beach David Low Way Pathway Re-alignment                             0         141,206         141,206          64,000          64,000            8,071              970            12.61%
    500671          500671 - Noosa Heads, Park Road Boardwalk Construction                          1,500,000       1,500,000       1,027,000        500,000         267,000            3,952               20             0.79%
    500672          500672 - Noosa Heads, Main Beach Boardwalk Construction                          200,000         200,000        200,000          50,000           50,000           11,143            74,743           22.29%
    500700          500700 - Noosaville, Sea Eagle Drive Pathway Construction                          10,000          10,000         10,000          12,000          12,000           11,326               47            94.39%
    500701          500701 - Cooran, James Street Pathways Construction                               100,000        100,000         100,000          33,000          33,000           32,730                0            99.18%
    500719          500719 - Munna Crescent Boardwalk Renewal                                              0               0          33,389          33,389          33,389           32,937                0            98.65%
    500736          500736 - Tewantin Cranks Park Pathway Renewals                                         0               0           13,200          13,200          13,200          13,125                0            99.43%
    500737          500737 - Noosa Heads Pinaroo Park Pathway Renewals                                     0               0           16,700         16,700           16,700          16,688                0            99.93%
    500738          500738 - Noosaville Wallace Park Pathway Renewals                                      0               0           17,500         17,500           17,500          16,983                0            97.05%
    500739          500739 - Peregian Beach David Low Way Raised Pedestrian Crossing                       0               0          80,000               0               0                0                0             0.00%
    500740          500740 - Botanic Gardens Pathway Replacement                                           0               0         129,075         159,075         159,075           42,005                0            26.41%
                                                            Total Pathways & Enabling Facilities    1,810,000       2,483,819       2,238,183       1,440,921       1,207,921        584,304           205,584            40.55%
Public Transport Infrastructure
    500209          500209 - Electric Bus Charging Station and Installation                                0               0               0               0               0              100             1,637            0.00%
     500312         500528 - Whole of Shire Bus Shelter Disabled Compliant Program                  1,000,000       1,000,000       1,000,000       1,000,000        608,000          710,698           115,982           71.07%
    500702          500702 - Noosaville, Lake Weyba Drive Bus Turnaround                             200,000         200,000               0         200,000         200,000            7,509           50,770             3.75%
                                                           Total Public Transport Infrastructure    1,200,000       1,200,000       1,000,000       1,200,000       808,000           718,307           168,389           59.86%

     100742         100742 - Sealed Road Pavement surveys and Investigations                               0            3,439              0               0               0                0             9,500            0.00%
    500054          500054 - Whole of Shire - pavement surveys                                             0            1,350              0           -1,350          -1,350               0                0             0.00%
    500206          500206 - Tewantin Cooroy Noosa Rd Stages 2-6 Design Only                               0          104,481         104,481         20,955          20,955           41,351                0           197.33%
    500530          500530 - Whole of Shire Reseal & Rehabilitation Program                         4,000,000       4,473,547       4,473,547       6,973,547       5,817,483        2,043,600        4,246,771           29.31%
    500531          500531 - Whole of Shire Pavement surveys and Investigations 2015/2016                  0               0               0               0               0            2,871                0             0.00%
    500544          500544 - Cootharaba - Dr Pages Road & Kinmond Creek Rd - Construction                  0               0          91,609          91,609          91,609          96,245                 0           105.06%
    500619          500605 - Cooroy-Belli Ck Road Slip Repair                                              0               0            1,301           1,301           1,301           1,301                0           100.03%
    500631          500617 - Sunrise Beach - Ben Lexcen Drive Southern end Road Corridor                   0         179,321         179,321         244,644         172,916          244,975             1,300          100.14%
    500633          500619 - Black Mountain Rd Landslip                                                    0         299,265         299,265         750,000         750,000           79,397           194,729           10.59%
    500741          500741 - Noosaville - Mary Street footpath, roadworks & drainage impr                  0               0          74,400          57,325          55,000          54,805              440             95.60%
    500747          500747 - Sunrise Road Cycle Lanes Design                                               0               0               0               0               0           10,087            37,955            0.00%
    500762          500762 - Emergent Works - Lake Weyba Rd Noosaville                                     0               0               0        366,100                0                0            52,168            0.00%
                                                                   Total Sealed Roads Network       4,000,000       5,061,403       5,223,923       8,504,131       6,907,913       2,574,632         4,542,863           30.28%

                                                                                                                                                                                                    Page 20 of 94

Section 21

Page 21 of 94

Sports Ground and Facilities:
    500545         500545 - Tewantin Noosa District Sports Complex - Internal roadway pl                 0          25,240          25,240         22,822               0           -9,216                0          -40.38%
    500644         500629 - Girraween Sportsground Water Bore & Storage                                  0          25,000         80,000         80,000          80,000           80,242                 0          100.30%
    500745         500745 - Tewantin, Sports Complex Stage 1 Carpark                                     0               0          21,350         21,350          21,350           39,179                0          183.51%
                                                            Total Sports Ground and Facilities           0         50,240          126,590        124,172         101,350          110,206                0           88.75%
 ‘Stormwater Drainage
    500057         500057 - Gympie Terrace pipe rehabilitation                                           0         142,641         142,641          3,630           3,630            3,630                0          100.01%
    500058         500058 - Re-lining of Ben Lexcen stormwater                                           0          13,327          13,327          5,829           5,829            5,829                0          100.00%
    500060         500060 - Whole of Shire - stormwater structures                                 250,000         250,000          70,000         70,000               0            381                  0            0.54%
    500532         500532 - Whole of Shire CCTV Drainage program 2015/2016                               0         20,773          20,773           7,484           7,484            9,000          50,927           120.26%
    500533         500533 - Whole of Shire Pipe re-lining/ rehabilitation program 2016                   0               0              0               0               0           28,603          80,909             0.00%
    500534         500534 - Whole of Shire Stormwater Pit Structure renewal program                125,000         125,000         125,000        125,000          62,500          108,758           79,965           87.01%
    500535         500535 - Whole of Shire Kerb & Channel Renewal Program                           30,000         30,000          30,000          30,000          15,000           51,573            2,146          171.91%
    500634         500620 - Cootharaba Kinmond Creek Road Sandy Ck Amco Renewal - design                 0          24,578          24,578         35,426         35,426           38,968                 0          110.00%
    500635         500621 - Cootharaba Kinmond Creek Road Eastern Branch Amco Renewal -                  0          26,117         26,117          35,183         35,183            35,963                0          102.22%
    500674         500674 - Cootharaba, Kinmond Creek Road Sandy Creek Culvert                     750,000         750,000       1,050,000         20,000          20,000          20,727               970          103.64%
    500675         500675 - Cootharaba, Kinmond Creek Road Eastern Branch Culvert                 500,000         500,000        1,050,000           1,000          1,000             760                 0           75.97%
    500676         500676 - Noosaville, Thomas Street & Gympie Terrace Culverts                   350,000          350,000         530,000        547,210         96,710           55,762           401,609           10.19%
    500677         500677 - Whole of shire, Bioretention/Water Sensitive Urban Design              80,000          80,000          80,000          80,000         80,000           83,506             1,697          104.38%
    500742         500742 - Tewantin Poinciana Ave Kerb & Channel Renewal                                0               0          52,000              0               0               0                 0            0.00%
    500743         500743 - Noosaville Eenie Ck & Reef Street roundabout drainage improv                 0               0          15,500          15,500              0           12,054                0           77.77%
    500748         500748 - Six Mile Creek Flood Monitoring System                                       0               0              0          100,000        100,000           13,751             360            13.75%
    500763         500763 - Noosa Heads, Paul Street Pipe Rehabilitation                                 0               0              0          165,000              0               0                 0            0.00%
                                                                   Total Stormwater Drainage      2,085,000      2,312,437       3,229,937       1,241,263       462,763          469,264           618,583           37.81%
Streetscapes and Road Corridors
    500085         500085 - Peregian Beach - precinct planning                                           0         29,150          29,150          20,850           5,000           12,844                0           61.60%
    500673         500673 - Peregian Beach, Peregian Square Pathways and Hard Landscapin            10,000          10,000          10,000          10,000         10,000            667              7,500            6.67%
    500703         500703 - Whole of Shire, Street Lighting Program                                20,000          20,000          20,000          20,000               0               0                 0            0.00%
    500704         500704 - Pomona Master Plan                                                     20,000           20,000         20,000               0               0              69                 0            0.00%
    500744         500744 - Noosa Heads Noosa Junction - Timber Assets Renewal                           0               0         90,000          70,000          70,000           31,577           15,929           45.11%
                                                        Total Streetscapes and Road Corridors      50,000          79,150          169,150        120,850          85,000           45,157          23,429            37.37%

                                                                                                                                                                                                  Page 21 of 94

Section 22

Page 22 of 94

% of Annual
   Works                                                                                                                      BR1                                                                                                    Budget
   Project                                                                                              Original       Carryover               BR2              BR3          Current      Year To Date         Remaining               Spent
    Code           Finance Project Number - Description                                                   Budget           Budget           Budget           Budget      Budget YTD             Actual      Commitments             (Actuals)
Transport and Infrastructure Management
    500536         500536 - Tewantin Cooroy Noosa Rd Traffic Management Construction - A                         0                0            1,794            1,794            1,794             2,642                  0           147.28%
    500300         500546 - Whole of Shire Forward Planning & Design Program - Construct                  400,000           564,774          564,774          150,000          150,000           133,359            65,378             88.91%
    500547         500547 - Sunrise Beach Ben Lexcen Drive School Crossing Improvement-c                         0           23,303                0                0                0                 0                  0             0.00%
    500548         500548 - Road directional signage (incl Noosa Entrance sign                                   0            2,290            2,290           50,000           50,000            13,028                  0            26.06%
    500552         500552 - Noosa Transport Strategy                                                             0                0           29,708           40,000           40,000            40,636               823            101.59%
    500553         500553 - Whole of Shire Street lighting program 2015/2016                                     0           13,669           13,669           13,669           13,669               191                  0             1.40%
    500615         500601 - Noosaville Eenie Ck Pathway signage stage 2                                          0          116,810          116,810          116,810           96,810             3,736            25,740              3.20%
    500678         500678 - Castaways Beach, David Low Way Safety and Corridor Improveme                  475,000          475,000            50,000           50,000                0             9,448              2,072            18.90%
    500679         500679 - Tewantin, Hilton Terrace & Ernest Street Intersection                        1,425,000        1,425,000         425,000           200,000                0            14,501           142,306              7.25%
    500680         500680 - Tewantin, Cooroy Noosa Road Improvements, Stage 4                             360,000           360,000          360,000          392,800          184,050            33,498              2,960             8.53%
    500705         500705 - Tewantin, Poinciana Avenue & Moorindil Street Intersection                    300,000           300,000           50,000           40,000             406             10,954                  0            27.38%
    500706         500706 - Pomona, Station Road Car Parking and Safety Improvements                      250,000          250,000          250,000           175,000          127,776            69,511            50,178             39.72%
    500707         500707 - Whole of Shire, Significant Local Roads Directional Signage,                  200,000          200,000            50,000           50,000                0            14,123                  0            28.25%
    500708         500708 - Sunshine Beach Pacific Ave/Sunshine Beach rd Minor Intersect                    50,000           50,000           50,000           50,000           21,250              217                   0             0.43%
                                                   Total Transport and Infrastructure Management         3,460,000        3,780,846        1,964,044        1,330,073          685,755          345,845            289,457             26.00%
Waste Management
    500640         500112 - Noosaville Landfill - Dosing & Monitoring Equipment                                  0          120,000          120,000           40,000           40,000            15,390              3,436            38.48%
    500681         500681 - Noosaville Landfill Entrance Road to Briteside, Stage 2                        165,000          165,000          165,000          165,000           82,500            10,350            52,580              6.27%
    500682         500682 - Noosaville Landfill Gravity Sewer from Holding Tank at Clean                    25,000           25,000           25,000           27,964           27,964            27,964              1,767           100.00%
    500683         500683 - Noosaville Landfill Entrance Signage and Landscaping                            26,000           26,000           26,000           26,000                0                 0                  0             0.00%
    500709         500709 - Noosaville Eumundi Rd Landfill Expand Contractors Vehicle Pa                  282,000          282,000          282,000           282,000          202,500          216,809               9,802            76.88%
    500765         500765 - Cooroy Transfer Station Renewal of Hard Stand for Stockpilin                         0                0                0           35,000                0                 0            31,818              0.00%
                                                                        Total Waste Management            498,000          618,000          618,000           575,964          352,964          270,513             99,404             46.97%

Asset Management
    500684         500684 - Whole of Shire, Asset Condition Assessments                                   250,000           250,000          250,000          100,000           85,000             2,187                  0             2.19%
    500685         500685 - Whole of Shire, Pavement System and Analysis for Reseal Prog                   100,000          100,000          104,790          54,790           54,790             41,357              2,200            75.48%
    500686         500686 - Whole of Shire, Annual Level 3 Bridge Inspection Program                        40,000           40,000           40,000           40,000           23,600            19,834             14,550            49.58%
    500687         500687 - Whole of Shire, CCTV Drainage Program                                          125,000          125,000          125,000          125,000           92,500            86,397                  0            69.12%
    500688         500688 - Whole of Shire, Review of Standard Drawings                                     25,000           25,000           25,000           25,000           10,000             6,857                  0            27.43%
    500710         500710 - Whole of Shire, T1 Asset Systems Mobility Rollout & Hardware                  250,000           250,000          250,000          170,000          166,000           101,119               835             59.48%
    500753         500753 - Carbon Reduction Plan (Buildings & Facilities)                                       0                0                0          116,000                0                 0            100,000             0.00%
                                                                         Total Asset Management           790,000          790,000          794,790           630,790          431,890          257,751            117,585             40.86%
Fleet - Plant Replacement
    500518         500518 - Plant and Fleet Replacement Program                                          1,765,000        2,151,438        2,151,438        2,151,438        2,003,438         1,718,672           231,247             79.88%
                                                                   Total Fleet - Plant Replacement       1,765,000        2,151,438        2,151,438        2,151,438        2,003,438         1,718,672           231,247             79.88%
                                                                                                                                                                                                               Page 22 of 94

Section 23

Page 23 of 94

500075         500075 - Whole of Shire - Tech One HR module                                              0                0               0                0               0             225               4,152             0.00%
500076          500076 - Whole of Shire - Mobile Mapping                                                  0                0               0                0               0              329                  0            0.00%
500078          500078 - Whole of Shire - replace failed UPS                                              0                0               0                0               0              375                  0            0.00%
§00542          500542 - Implementation of Cl Anywhere Functionality for TechnologyOn                     0          54,606           54,606          54,606          54,606            60,092             26,482          110.05%
 500689         500689 - Whole of Shire, Meeting Room Projectors and Smart Television                 17,580          17,580           17,580           7,008           7,008             7,007               633           99.99%
500711          500711 - Whole of Shire, Cl Anywhere Functionality Implementation                   200,000          200,000         200,000          200,000         120,050           111,043             1,960           55.52%
 500712         500712 - Whole of Shire, Implement Eplan online Planning Scheme T1                  140,000          140,000         140,000          140,000          95,000            13,353             1,070            9.54%
 500713         500713 - Whole of Shire, Wireless enable Council Buildings                           26,000           26,000          26,000           26,000               0                0                  0            0.00%
500721          500721 - Black Mountain Repeater Replacement                                              0                0           6,923            6,923           6,923             6,923                 0          100.00%
                                                               Total Information Technology         383,580          438,186        445,109           434,537         283,587           199,348           34,297            45.88%

 500107         500107 - Noosa River Hydraulic Model                                                      0           76,304          76,304           76,304          76,304            36,194             2,110           47.43%
 500203         500203 - Business Distribution and Land Needs Project                                     0                0               0            1,515            1,515            1,515                 0           99.97%
500543          500543 - Whole of Shire Planning Scheme Development Projects 2016                         0          176,618         176,618          176,618         176,618           154,750               689           87.62%
500714          500714 - Whole of Shire, Climate Change Adaptation Strategy                         100,000          100,000         100,000          100,000         80,000               518            194,963            0.52%
 500715         500715 - Whole of Shire, Consultant Costs for Planning Scheme Develop               100,000          100,000         100,000          100,000          80,000            12,533             3,932            12.53%
500716          500716 - Whole of Shire, Project Team Resources for New Planning Sche              546,963          546,963         546,963          546,963          382,640           377,770                 0           69.07%
 500717         500717 - Six Mile Creek Flood Study                                                 100,000          100,000         100,000          183,996         174,996            32,181           48,843             17.49%
                                                                     Total Planning Scheme          846,963        1,099,885        1,099,885       1,185,396         972,073           615,459           250,537           51.92%

                                                                               Grand Total       23,101,168      26,989,587       25,449,321     24,593,475        17,568,792       10,293,702         8,346,117            41.86%

                                                                                                                                                                                                      Page 23 of 94

Section 24

Page 24 of 94

Capital Works Program
                   YTD Actual Expenditure                                                               $10,293,702
                   Committed Expenditure                                                                 $8,346,117
                    Remaining Capital Expenditure                                                        $5,953,656
                    Full Year Budgeted Expenditure                                                      $24,593,475

                                    Remaining Capital
                                      Expenditure
                                        24.21%

                                                                                                         YTD Actual
                                                                                                         Expenditure
                                                                                                          41.86%

                               Committed
                               Expenditure
                                 33.94%

                                                                                                                                                                                                                Page 24 of 94

Section 25

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           6 JUNE 2017



3                        1617T111 ALERT FLOOD WARNING STATIONS
DOCUMENT INFORM AT ION




Author                           Technical Officer, Craig Smit
                                 Planning & Infrastructure Department

Index                            ECM\ Projects (T1)\ Alert Flood Warning Stations - CAP.WORK – 500748
                                 ECM\ Subject\ Flood Management\Flood Alert System
                                 ECM\ Subject\ Flood Warning Devices

Attachments                      1.   Tender Evaluation Matrix


EXECUTIVE SUMMARY
This report provides a recommendation for the appointment of the preferred contractor for the
construction of alert flood warning stations.

RECOMMENDATION
That Council note the report by the Technical Officer to the Services & Organisation Committee
Meeting dated 6 June 2017 and award tender 1617T111 for construction of alert flood warning
stations to Ecowise Australia Pty Ltd trading as ALS Hydrographics for the lump sum price of
$206,718 (excluding GST).


REPORT
The purpose of this report is to seek authority to proceed with the preferred tenderer for the
construction of new alert flood warning stations to commence in the 2017/18 financial year.

The Department of Infrastructure, Local Government and Planning (DILGP) has awarded Noosa
Council a grant for the supply and installation of ALERT flood warning stations in three (3) target
areas of the Noosa hinterland.

These target areas include the hinterland townships of Cooroy and Pomona as well as a location
in the Kin Kin Creek catchment. The target areas were identified in the Noosa Shire Council
Network Investment Plan prepared by the Bureau of Meteorology for the Queensland
Reconstruction Authority in September 2016.

Noosa Council has completed a site selection process and identified five (5) priority sites (within
the three (3) hinterland target areas) for the installation of ALERT rainfall and river height flood
warning stations. The next phase is to engage a suitably qualified contractor to supply and install
these ALERT rainfall and river height flood warning stations to the defined specifications and the
following criteria.

Design

The fabrication and installation of standard platform units will be in accordance with the standard
drawings provided by the Bureau of Meteorology.

Construction Management and Inspections

Contract administration, management and inspections will be performed in-house by Council
staff.


                                                                                          Page 25 of 94

Section 26

     SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                   6 JUNE 2017


     Tender Process

     Due to the value of the works being greater than $200,000, Council called a public tender for the
     work through the LG Tender Box system in accordance with the Local Government Act 2009.

     An open invitation to tender was released via LG Tender Box on 21 April 2017 with advertising in
     the Sunshine Coast Daily on 22 April 2017 and in the Noosa News 25 April 2017. The tender
     closed on 16 May 2017. Four (4) conforming tenders were received.

     Tender Assessment

     The tender evaluation panel undertook an assessment of the received conforming tender
     submissions from the following respondent:
     1)   Ecowise Australia Pty Ltd trading as ALS Hydrographics (ALS Hydrographics);
     2)   Aquamonix Pty Ltd;
     3)   Prospect Group Pty Ltd; and
     4)   Wight Water Environmental Pty Ltd.

     The tenders were evaluated using the following criteria:
         Capability and resourcing;
         Contract experience and track record;
         Timeline and methodology;
         Quality;
         Health and safety;
         Environment and sustainability;
         Contribution to local economy; and
         Price.

     The tendered price from ALS Hydrographics is the second lowest at $206,718 excluding GST.

     ALS Hydrographics tender submission is favourable as they have significant previous experience
     with installing similar alert flood warning stations for other local governments.

     ALS Hydrographics have demonstrated in their submission that they are more than capable and
     have the necessary resources to meet Council’s program to complete these works by 30
     November 2017.

     The tender evaluation team considers this tender to be the most advantageous to Council and
     presents the best value for money.

     Finance & Risk

     The project is jointly funded by the Queensland Government’s 2016-17 Grants and Subsidies
     Program and Noosa Council.

     State Government Natural Disaster Resilience Program funding for the Six Mile       $165,500
       Creek Catchment Flood Monitoring System

     2016/17 Budget allocation in the Alert Flood Warning Stations Capital project        $41,118




                                                                                       Page 26 of 94

Section 27

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                  6 JUNE 2017



Departments/Sections Consulted:

   Chief Executive Officer                    Community Services                     Corporate Services
   Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
   Executive Support                          Community Development                  ICT
                                              Libraries & Galleries              X   Procurement & Fleet
                                              Local Laws                             Property & Facilities
                                              Waste & Environmental Health           Revenue Services

   Executive Office                       X   Planning & Infrastructure
   Community Engagement                       Building & Plumbing Services
   Customer Service                           Civil Operations
   Economic Development                       Disaster Management
   Governance                             X   Infrastructure Planning & Design
   Human Resources                            Planning & Environment
   Sustainability                             Strategic Land Use Planning




                                                                                                 Page 27 of 94

Section 28

ATTACHMENT 1




 Page 28 of 94

[eases                                                sein Warne Sa                                                                                                                                                                                           ATTACHMENT 1
         No   NAME OF TENDERER                                                     PRICE
            * |(Conforming Tenders Only)                                       (excl of GST)
           1
           2  ALS Hydrographics                                                         $206,718
           3                                                                            $211,946]
           4                                                                            $228,011
           Sf
           6
           Tf
           Sf
           9
           MO
              NON-CONFORMING TENDERS

                                                                                      1                     2                     3                    4                    5                    6                    7                    8                   9                    10
                                                                                 Qntracting             varosrap               P'       Pp         quam o'
                                                                                         .               ,
                                                                                       Resultant             Resultant             Resultant            Resultant            Resultant            Resultant            Resultant            Resultant            Resultant             Resultant
              Evaluation Giteria                          Weighting (%)                  score X               score X               score X              score X   Score      score X              score X              score X              score X              score X             score X
                                                                                        weighting            weighting             weighting            weighting            weighting             weighting            weighting            weighting           weighting            weighting

              SS                                             a                                                                                            ee                                                ee                  eee

                                  ~~                                             Qnitracting            varosrap               P       P           q
              Total Fees (Pe)                                  35%                $204,955              $206,718              $211,946             $228,011                so                   so                   $0                                        $0
              AVOIA SILC ES (DAV) Sresrenerentecersecertsess) $212,908
              Price Score                                                            104                   103                   100                   93                   0                    0                    0                                        0
              Normalised Price Score (Pn)                                            100                  99                     97                    90                   0                    0                    0                                        0
              Weighted Price Score (Pw)

                                                                                                                                                         The Contract Adm inistrator confirms the above scores
                    Contract Administrator & Assesment Panel Member 1                                                                                             and weightings of this evaluation
                                Assesment Panel Member 2
                                Assesment Panel Member 3                                                                                                      Contract Administrator's signature:
                                Assesment Panel Member 4                   pe
                                Assesment Panel Member 5                   pe
                                                                                                                                                                                                                                                                   Page 28 of 94

Section 29

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           6 JUNE 2017



4                        FUTURE OF HANG GLIDING AND PARAGLIDING ACTIVITY - TINGIRA CRESCENT
                         SUNRISE BEACH
DOCUMENT INFORM AT ION




Author                           Property Manager, Clint Irwin
                                 Corporate Services Department

Index                            ECM/ Subject/ Leases; Property/ 237092

Attachments                      1.   Map of launch site Lot 149 on RP130983 Tingira Cres, Sunrise Beach
                                 2.   Map of flying area between Sunrise Beach and Sunshine Beach
                                 3.   Sunshine Coast Sports Aviators Letter of Support for Noosa Council
                                      funding application


EXECUTIVE SUMMARY
Hang gliding has occurred over the frontal dune between Sunrise Beach and Sunshine Beach
since the 1960’s. The main launch site is located at Tingira Crescent and over the last 15 years
flying has becoming more popular due to the advent of paragliding. There have been resident
complaints regarding the flying activities over homes between Sunrise Beach and Sunshine
Beach and as house design has changed to include more outdoor based living, swimming pools
and glass walls, the interaction between flyers and residents has increased.

The Sunshine Coast Sports Aviators Inc. (SCSA) permit to use the launch site expired in
September 2015 and the group continues to use the launch site under the expired permit
conditions. Recent resident complaints prompted Council to engage with SCSA to discuss the
resident issues. In response, SCSA have attempted to implement a suite of management actions
but the residents maintain these actions have not alleviated their privacy and safety concerns.
Council has also facilitated a discussion between residents and SCSA resulting in the
development of a management plan by SCSA which was subsequently rejected by the residents
because the trial period was too long and the overall efficacy of the plan was questioned.

SCSA, Council and the Queensland Parks and Wildlife Service have also been in discussions to
explore the potential for the use of inland flying sites and these discussions are ongoing. Council
has recently been successful in receiving State Government funding to develop a Regional
Sports Facility Plan. The Plan will provide an agreed Regional Facility Plan (Sunshine Coast,
Noosa and Gympie Regional Council areas) for a group of activities defined as difficult to locate
(including hang gliding and paragliding).

Council sought legal advice from King & Co. Solicitors regarding the future of flying from the site
and this was discussed with SCSA and residents. The advice is that continuing to permit Tingira
Crescent as a launch site exposes Council to liability in nuisance, with the likely remedy being an
injunction against Council and / or SCSA and its members. Given the legal advice provided, this
report recommends the Tingira Crescent launch site be closed for flying activities and Local Law
No.4 (Local Government Controlled Areas, Facilities and Roads 2015) be amended to reflect the
site closure.

While hang gliding/ paragliding is a spectacular recreation activity with a long history at Sunrise
Beach and Sunshine Beach, this report contends the future of the activity hinges on securing
locations away from residential areas where interaction between flyers and residents is
minimised.




                                                                                           Page 29 of 94

Section 30

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     6 JUNE 2017


RECOMMENDATION
That Council note the report by the Property Manager to the Services & Organisation Committee
Meeting dated 6 June 2017 and:
A.   Authorise the CEO to prohibit hang gliding and paragliding at Lot 149 on RP130983,
     Tingira Crescent, Sunrise Beach due to the unreasonable impact on resident amenity
     (detailed as Option 3 in the report);
B.   Proceed to amend Local Law No.4 (Local Government Controlled Areas, Facilities and
     Roads 2015) to prohibit flying activities on Lot 149 on RP130983; and
C.   Continue to work with the Sunshine Coast Sports Aviators Inc. and relevant stakeholders to
     develop a Regional Sports Facility Plan for hang gliding and paragliding within the
     Sunshine Coast Council, Noosa Council and Gympie Regional Council local government
     areas.


REPORT
Council is trustee of Lot 149 on RP130983, situated at Tingira Crescent, Sunrise Beach (the site)
under a Deed of Grant in Trust (DOGIT) for public park purposes. The site has been used as a
launch site for hang gliding and paragliding since the 1960’s (see Attachment 1). The site faces
due east, is easily accessible and provides a sloping grass surface making it an ideal launch site
for flying in the prevailing east – south east winds over the high frontal dune between Sunrise
Beach to north Sunshine Beach (see Attachment 2). In addition to flying activities, the site is
utilised by the community to observe the surf conditions and view the ocean.

The Sunshine Coast Hang Gliding Club formed approximately 15 years ago and, following
amalgamation with the Conondale Cross Country Flyers, became the Sunshine Coast Sports
Aviators Inc. (SCSA). SCSA and its predecessor have held permits of 1 to 3 years’ duration over
the Site since 2005. The most recent one year permit expired in September 2015 and SCSA
continue to use the site under the expired permit conditions.

Hang gliding and paragliding has a long history on the Sunshine Coast and occurs from a variety
of locations across coastal and inland locations. Each site has unique characteristics and offers a
different flying experience for participants.

On its website www.sunshinecoastsportsaviators.com.au SCSA lists the local area flying sites as:
1.    Alexandra Headland;
2.    North end Sunshine Beach;
3.    Point Cartwright;
4.    Rainbow Beach – Carlo Sandblow;
5.    Teewah Beach; and
6.    Inland Flying sites – mostly along the Blackall Range.

Over the years there have been complaints about the use of the site, particularly in relation to
safety concerns and impacts on residents’ privacy. Approximately five years ago, residents
complained to Council regarding the flyers’ use of in-flight cameras. Subsequently in 2012, a new
clause was included in the tenure agreement prohibiting the use of cameras in flight. One of the
primary reasons for the increase in complaints is the increase in the use of the site, with more
flyers using the site particularly with the advent of paragliding (paragliding is now a popular
activity and has largely replaced hang gliding). Additionally, the visual interaction between the
flyers and residents has increased given changes in house design over time along the coast to
incorporate more outdoor based living, swimming pools and use of glass.



                                                                                    Page 30 of 94

Section 31

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       6 JUNE 2017


Due to the increasing intensity of use of the site and escalation of complaints, in mid-2015
Council sought to undertake a collaborative process with SCSA to address the issues raised by
residents. In response the SCSA developed a suite of actions to address the issues, including:
1.    Design of new signage for installation at both the Tingira Crescent and northern Sunshine
      Beach launch sites which includes site rules and contact details for the SCSA Safety
      Officers for pilot / public queries if they have concerns regarding flying activities.
2.    All pilots are required to be members of the SCSA and agree to follow the Code of Conduct
      on the SCSA website.
3.    A Duty Pilot system has been implemented.
4.    Radios are now compulsory for all pilots to carry at all SCSA sites allowing for increased
      communication between pilots, Safety Officers and the Duty Pilot.
5.    Enhanced education for pilots / members of SCSA – the Code of Conduct is a standard
      agenda item at meetings and in the SCSA newsletter.

On 15 March 2016, Council Officers met with SCSA to discuss the implementation of the actions
and Council advised that, due to legal matters raised by residents, legal advice would be sought
on the use of the Site for hang gliding and paragliding activities and Council would meet again
with SCSA once advice was received.

King & Company Solicitors provided advice to Council on 19 May 2016, the key points being:
   Continuing to permit use of the Tingira Crescent lot as a gliding launch / landing site
     exposes Council to liability in nuisance to Tingira Crescent residents and residents in the
     broader area of the flight paths;
   Neither Council nor the gliding fraternity could defend a nuisance claim upon the basis the
     gliding activities pre-date residential development;
   The likely remedy for nuisance would be an injunction against Council and/or the gliding
     club and its members. An order for payment of damages is sufficiently unlikely that Council
     may ignore it;
   An action for negligence is unlikely to succeed against Council as there is an insufficient
     link between Council permitting use of the site and the damage / injury a glider may cause;
   A glider operating inside the Civil Aviation Act requirements is irrelevant to liability in
     nuisance; and
   Council may exercise its rights as owner to exclude the activities from the land. It may also
     address the issue at local law level, to facilitate fining those who continue to use the Site for
     flying activities.

On 30 May 2016, Council Officers met with the Queensland Parks and Wildlife Service (QPWS)
regarding hang gliding and paragliding activity and opportunities to secure additional regional
sites. QPWS manage the north Sunshine Beach site, Teewah site and the Carlo sand blow site
at Rainbow Beach. In summary, QPWS advised:
     A permit is offered to SCSA at north Sunshine Beach (a permit to land and a permit to
       launch);
     There is no intention to permit increased usage at the north Sunshine Beach site
       (commercial operators etc.);
   North Sunshine Beach does not attract as many flyers because it is more difficult to access
     and flyable only in southerly winds;
   The Teewah site was undergoing renovations because the existing wooden ramp was
     unsuitable for the increasing popularity of paragliding and concerns over entanglement to
     the structure from paragliders (as of 6 June 2017 works are complete); and
   Their availability to meet with Council and the SCSA to determine suitable Sunshine Coast
     inland locations in addition to the other locations.

                                                                                      Page 31 of 94

Section 32

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      6 JUNE 2017


Council met with QPWS and SCSA on 9 June 2016 to discuss potential alternate Sunshine
Coast inland flying locations. QPWS requested a list of criteria for suitable locations for inland
flying locations. These conversations are ongoing with SCSA and QPWS. Three sites of interest
are Wratten’s National Park (west of Gympie), locations in Walli (east of Kenilworth) and the
Conondale National Park.

On 8 July 2016, Council Officers and King and Co., met with SCSA and its legal advisor for
without prejudice discussions to discuss the legal advice provided by King and Co. and its
ramifications for SCSA. As a result, SCSA requested Council facilitate a meeting with residents
to discuss the specific issues.

On 30 August 2016, Council Officers and King and Co. met with affected residents for without
prejudice discussions regarding the resident’s concerns. Council’s role was not one of mediation
but rather to facilitate discussion between the parties to explore options. The discussions were
amicable and a commitment was provided by SCSA to provide a Management Plan to decrease
the impact of the flying activities on the residents. The main provisions of the submitted
Management Plan are:
    Installation of a weather station and movement activated site cam;
    Restrict flying unless certain weather conditions are met;
    Consequences for non-compliance with site rules;
    Line of sight markers 30 metres from beachfront property boundaries (proposed that
      Council install);
    Limit number of pilots in the air concurrently;
    Prohibit hovering over resident properties; and
    To be trialled over three flying seasons (three years).

In early December 2016, resident representatives provided feedback regarding the Management
Plan stating the proposed three year trial period was too long. The residents aired frustration over
the continuing number of aircraft over their houses and expressed doubt that the activity could be
adequately managed, given SCSA are a volunteer organisation. The residents maintain that a
Management Plan is a reactive approach that will have a negligible effect, given there are no
effective controls to curb the activity once the flyers are in the air.

On 9 December 2016, King and Co. wrote to SCSA providing the opportunity for both parties to
reach a compromise and advising Council would review the matter at the end of February 2017.

On 4 May 2017, Council received notification it was successful in its application for $75,000
funding under the State Government’s Sport and Recreation Planning Program to develop a
Regional Sports Facility Plan. The Plan encompasses Sunshine Coast Council, Noosa Council
and Gympie Regional Council areas. The Plan will provide an agreed Regional Facility Plan for a
group of activities that are defined as generally difficult to locate and will not be captured within
the draft Noosa Sport and Active Recreation Plan. Aviation (including hang gliders and
paragliders) is captured within the plan and SCSA provided a letter of support to back Council’s
funding application (see Attachment 3).

On 18 May 2017, a paraglider became entangled in the powerlines at the site. While the flyer
was not seriously injured, the incident cut the power to 2,225 homes in the area and the power to
nearby school traffic lights. This incident prompted contact from resident representatives
reinforcing their safety concerns.




                                                                                     Page 32 of 94

Section 33

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      6 JUNE 2017


Council now needs to consider the future of the activity at the site and the options available to
address the current issues in a sustainable way. Three options are discussed below:

Option 1:      Do Nothing
               Council allows the status quo and hang gliding and paragliding activities
               continue from the site

This option involves Council allowing the activity to continue until such time as a successful
nuisance action is brought before the Court where the likely remedy is injunction.

In summary, this approach would:
a)   Allow the flying activity to continue at the site which has occurred for the last 50 years. This
     option supports the interests of SCSA who have recognised the issues and will implement
     a range of proactive initiatives through the proposed Management Plan; and
b)   Rely on residents taking the matter to court and establishing that nuisance has occurred
     noting the potential cost to applicants (if the application is unsuccessful). Success is not
     assured and the application is expensive.

Risks
1.    Council could be portrayed as not protecting the privacy and safety of local residents.
2.    Escalating conflict between residents and flyers due to a lack of implementation of
      Management Plan initiatives or implemented initiatives are ineffective in addressing
      resident concerns.
3.    Exposes Council to potential legal action by residents and Council’s reputation will be
      damaged if court action is successful.
4.    Exposes Council and ratepayers to financial risk through legal costs should the matter
      proceed to Court.

Option 2:      Increased Monitoring
               Council allows hang gliding and paragliding activities to continue from the
               Site however provides active oversight of the implementation of the
               management plan by SCSA and monitors its effectiveness in reducing the
               current concerns of residents

In summary, this approach:
a)   Allows the flying activity to continue at the site, however Council actively oversees and
     monitors the implementation of the Management Plan proposed by SCSA to determine its
     effectiveness in reducing resident safety and privacy concerns;
b)   Attempts to pursue a compromise between residents and flyers; and
c)   Relies on residents taking the matter to court and establishing that nuisance has occurred
     noting the potential cost to applicants (if the application is unsuccessful). Success is not
     assured and the application is expensive.

Risks
1.    Impacted residents will likely still feel that the course of action is inadequate and that
      Council is not acting immediately to protect their privacy and safety given the history of
      complaints.
2.    Resident representatives reject this option and proceed with legal action anyway.
3.    Exposes Council to reputational risk if Court action is successful.
4.    Exposes Council and ratepayers to financial risk through legal costs should the matter
      proceed to Court.

                                                                                      Page 33 of 94

Section 34

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       6 JUNE 2017


Option 3:      Council prohibits flying activity at the site

Council prohibits flying activities from the site through local laws compliance.

In summary, this approach:
a)   Acknowledges the expert legal advice received on the issue and is based on the premise
     that Council should act in the resident’s interest.
b)   Reflects the likelihood that any further flying activity on the site will not be accepted by the
     residents (even in a controlled manner) and that court action is likely.
c)   Requires an amendment to Council’s local laws to prohibit flying at the site.
d)   Whilst denying access to SCSA and other users of the site for flying activities, allows
     Council the opportunity for positive messaging regarding working with the Sunshine Coast
     Council, Gympie Regional Council and other stakeholders such as QPWS to develop a
     Regional Sports Facility Plan for hang gliding and paragliding (i.e. alternative site
     locations).

Risks
1.    Exposes Council to some reputational risk as being a ‘killjoy’ regarding the closing of the
      site to the SCSA and other flyers given the site history and lack of previous action to date.
2.    Ad hoc illegal flying activities may continue at the site for some time which will require
      Council resources to initiate reactive compliance activities.

Summary

Hang gliding and paragliding are spectacular recreational activities with long history in Sunrise
Beach and Sunshine Beach. However, they are outgrowing the site and becoming increasingly
unsuitable in built up residential areas due to growing interaction between flyers and residents.
This interaction is an ongoing cause for concern for residents in particular impacts on privacy and
also safety fears (whilst incidents relating to safety are infrequent they cannot be ignored).

As such the future of this activity lies in its conduct outside of residential areas. Existing coastal
sites at Teewah and Rainbow Beach are ideal because the residential impact is low or non-
existent. The QPWS offer to investigate Sunshine Coast inland sites to conduct the activities is a
positive step and will be pursued by SCSA given its membership is geographically dispersed.
Council is committed to the sport’s future, as evidenced by the successful funding bid to secure
long term alternatives in suitable locations across the Sunshine Coast Council, Noosa Council
and Gympie Regional Council local government areas.


Previous Council Consideration

Nil.

Finance & Risk

This item is collectively discussed in ‘Options’ within the report.




                                                                                      Page 34 of 94

Section 35

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                    6 JUNE 2017


Consultation

External Consultation - Community & Stakeholder

 Sunshine Coast Sports Aviators Inc.
 Queensland Parks and Wildlife Service
 King & Company Solicitors

Internal Consultation

   Director Corporate Services
   Community Development Manager
   Property Advisor
   Community Development Officer

Departments/Sections Consulted:

     Chief Executive Officer                X   Community Services                 X   Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
     Executive Support                      X   Community Development                  ICT
                                                Libraries & Galleries                  Procurement & Fleet
                                            X   Local Laws                         X   Property & Facilities
                                                Waste & Environmental Health           Revenue Services

     Executive Office                           Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                                 Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                                   Page 35 of 94

Section 36

ATTACHMENT 1




  Page 36 of 94

ATTACHMENT 1
 + hal        “a0? ir       tea                     ;                                 ae                   eee.
      '   ae        i      a          a      1                                   r    aR                  7 cao
  ial            :   A     . att '                                              lp         ?             , See
ae                    nee      Fo         tae        NE                                                     . oe
 —- ia         Bs                5        ~    |) SOW   Mawere  Wee  ee eee act     weer «                 aaa
 ASR         ae    Brie       ia    }   ‘=   o>                  ay               oe      ~                 ae
              rc      \          ain  ES                8                            co   *                Dig
       ae                                         oh     nd             ;         oa.                     Sar
  a              Ve ay i                     Neat f\ |    ae           ees       SS                    obese
 b es                                             uo            Pee                                    re     i
Lay                    a              ep      SSI                                                    Psa
     ah                     BS         eg)!                                   a              lCU
5    A     N                    .         ep,  =     4  2         +  *:     2  5    _~—   s          li. ao
“ae         ha             be       NSS             jt              _     ie                         Be
  an   Wy on      ee     ue Z                   ~     j           |         cae                       aah i
= Be               =           |                y fi                  ede |!)                    |      a
=    We          wee     ys     Mae            WE ii                   ”                                 a
     4    \ he    os        .    eo            / i             !                                  ee
Ae                        7                  f               ;           >                         -
     *            ee    sh                               sean            ti                        -
                          ve WV i)       ok                                ;                        ae    +e
                     Lad   * al        td i                  i     1    j [ =                     c i     wy
      ie           : be y            e   ,     Ss            |     :  tw                  |     a        5
5        i             z=   1a         ay  «                  ae        oa                  '  =         =                                            [amp 20 30
    ADDRESS  LOT PLAN PROPERTY IC OPEN SPACE PARK NAME ROAD NAME TOILET NUMBER

                                                                                                                                             Page 36 of 94

Section 37

ATTACHMENT 2




  Page 37 of 94

-                    (s) A Cg                               m                                                                                                ATTAC
 o            Pe.         bp \         Nao               Bak                                                       so                                                 HMENT 2
 +           A L     y             PP Sh AAT
              won               .   OO ne te oy rth Hail
                               a   tn        py              ;                                     *y
      f                     -_                 er    Be JE IRNY SS                                                         Me
       :       S                  \   ee          Wy FES                                                                    7
   1                         NS
 FT     aa                                ae       pete                                         :                   a?
ps.   aA            aids    Men              wt! le Nig    Seats      ea                                 f            }
 7p i          Bs         Per. )       Oa    Pav feiss Ue 1) YS
 pee                 a pede    ny            Oe)    Pee   x a              ‘                                          :
 ees     aN           =          y          hie   Casa       Spd:        NilsleWa Screams Mista!          mae
    ara        >                          ae        8, y      sans                                 BP   i 6           .
 . ae             Sn                      rei  me       :       %                                    aes     NW     ie
     ne      é         Wi                  HE      Sonos. ele pee                                   B Aetn \es     “lg ots)
 md ie i> ‘a5        SNE Nae  sai            !  if  rn}    tant ‘*
mulaih i (             }    ~     aS      fF        Henn  NN  hee                                   aos Nees? = se -
 ae     .    |       SS               a    SB        FN ces =                                       NS Ne HEE &
ez    ‘ .        Dk    Fe        «   oat oh by          LT Pa WP Mann                               \Se Bey SH    f
 4        .     A     f   Co     \ Wee 2,          eo      ge   Seno                                 LOS   NEG |   i
SS Bes?     ae |      [i oe   )Y!     Rf      4     are   /      ae                                     Ney IB
   bee         eg       age Wis                                                               a)
* =         il      ,..              Ii) iksh Pet oom                              | Ree               re        |
  PARIS:        aut                  Be CL    pe ee                         a.           i        Moke   Re
  Se en Be ts fe eet of)                thes Pes      ets i                  ee = a, a eee Co              alt  ||
i 2 Ween ie Vere. i          SS      sy Px Si et ish {                      ,    eS       ey 5          OY WE.
 i   SSS re ‘                  ih    <3 wert: Tac Soper                         ae =:   Se ae           ce HE |
  [RE        aa      cam my        NE tes                                  ee                 <7 a
   te Sle  BT Can        ys         Ls   NF Ti a pete re age My ete       7.        Hots     RY.          ee
  “} peseecs oe       .       rt it            a       ,               | es Rx             EN   at      S VHA
   Be                       ie i          eta      a ios              Lire         ee      ae              He
Seas                       a “ini cae & i AeA Pre. ee             ¢    ips i Ss =i i as uy aN 7         vf   i
                tae  pens ie  Pres Wee 5                 \         :   ;     el            eins       SERSTB
Z      *                PO  ge         uf    GF a        ‘‘       ep     ke     Ae    x                AC
        ;      eee Fe       Patent ere eat te             ‘        ed       eeue      S      Sy        od |
        2           aia       adi! aay          :          \  a            tee     fa CD 4 Cen |
        =         pea    Poe ot                .                  Pee       aca       bet.            ye    D
        :        entry               cytes      )           ba                 AB     BA:               gil
        *       BO     eee    eines        ere:      eee      -f    1            eee  So x CANES "¢: :
        =       \    Paty     5          | pL pests pee     8 ee     4  Be     ee; FG           ea    a
        a geo                             Bae.              oe              ae rabakes I               a
     Sas        \ re         *     Ae Wah      Ba                    :         i peapeagent Nok Ny ft
    Skee                      a          ONG                       f           Pe ge                ee!
    Tete         NS ae : cB          .     WN                      ae           pene es CaN : / eK ie
                    he.      ee             \           ;        as            Daas BRS FT NY at ah     f
       ee         RU oN                .      r Ay               z    y       sue    Te +2) OTe es ie
           dh        ~N     lita aes 5      A   tS Ge           F             f sii BE    i z oe      F Bit (ra  (     Sj
                    a    Manian ay i     ee       i      .       F     x  ,   Shige oneee ee aN R AC el
           :           \      mes       ‘ey    of ia      me    ,       r     capi ANI       Ren eke  i                    ;
            a           Nea                  A\S                              APES Se OR Nh           F,
                      1      UP                                               Piet tomes yin       *
                             oe    reo             a ath       in         )  ieee eit ee         coh BR
       ~                  ear     A RAS :                       S            Sy      es              ie
                                  Ss ai te v2 »f \ eek            v          wteieit nee Liebe eee: | ONY:
             a                           RS                                 pM ee Neb
                                           '                        be        SSO cry Siraj ya
&           ——                                                        —        Rae Niet di         UB
     ADDRESS    ae                                                       \     ae   s Te iss alie, =  /
                  eee     PROPERTY ID         ,                          .      ec ua         yy     j
                                       OPEN SPACE PARK NAME                      pe         Reg |
                                                      :    Roe N=       TOILET NUMBER            oo
                                                                                                                                                                 Page 37 of 94

Section 38

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     6 JUNE 2017


                                                   ATTACHMENT 3




                                                     Page 38 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    6 JUNE 2017

                                                                                ATTACHMENT 3

                                              ow                                    PO Box 456
            %              SA fw                                           TEWANTIN QLD 4565
                                           ase                               Mob: 0412 376719
            Sunshine Coast Sports Aviators                  [email protected]

            To Whom It May Concern

            This letter is to provide support for Noosa Council’s application for a Regional
            Facilities Plan under the Department of National Parks, Sport and Racing
            (DNPSR) Sport and Recreation Planning funding program.
            We understand that the Plan will be a collaborative project with the Sunshine
            Coast and Gympie Councils and will aim to provide a regional plan and agreed
            direction for the future development of aviation sports facilities across the
            region.

            We look forward to being involved in the development of this Plan if the
            funding is successful and wish Noosa Council the best of luck with its
            application.

            Yours Sincerely
            Paul SHO             .
               )

            President
            Sunshine Coast Sports Aviators

                                                                                   Page 38 of 94

Section 39

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  6 JUNE 2017


5                        ASSESSMENT OF EXPRESSIONS OF INTEREST FOR COMMERCIAL HIGH USE
                         PERMITS (1617E119)
DOCUMENT INFORM AT ION




Author                          Property Manager, Clint Irwin
                                Corporate Services Department

Index                           ECM/ Subject/ Commercial Use of Community Land
                                ECM/ Subject/ Use of State Land

Attachments                     1.   EOI Evaluation Summary Sheets




EXECUTIVE SUMMARY
In accordance with Council’s resolution at the Ordinary Meeting on 16 March 2017 and its
Commercial Use of Community Land Policy, Expressions of Interest (EOI) were recently invited
for businesses wishing to apply for Commercial High Use Permits on community land. The EOI
was advertised in the Noosa News on 7 April 2017, the Sunshine Coast Daily on 8 April 2017
and on Council’s website.

Respondents were invited to submit applications to LG Tenderbox, Council’s e-tender portal, with
applications closing on 2 May 2017. There were 39 downloads by parties/businesses from the e-
portal. A total of 14 businesses applied for 10 activities.

An evaluation panel was assembled with the required skill sets and relevant expertise to
undertake the assessment. The principal recommendations arising from the panel assessment
include:
    Of the 10 activities advertised, 8 permits are proposed to be offered to existing permit
      holders.
    The Noosa Main Beach West beach equipment hire permit (between the rock walls at
      beach access 15) be offered to Go Ride a Wave Pty Ltd (trading as Noosa Surf Lessons
      and Go Ride A Wave) due to the respondent’s higher quality submission.
    No submissions were received by the closing date for the Noosa Main Beach Massage
      activity. The existing permit holder requested Council allow a late submission. It is
      recommended Council publicly re-advertise the permit, with respondents to again be invited
      to submit applications through LG Tenderbox.




                                                                                 Page 39 of 94

Section 40

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       6 JUNE 2017


RECOMMENDATION
That Council note the report by the Property Manager to the Services & Organisation Committee
Meeting dated 6 June 2017 and:
A.   Issue 3 year permits commencing 1 July 2017 to the following nine recommended permit
     holders:
     Activity                                     Recommended Permit Holder
     Learn to Surf Noosa Main Beach West 1        Surf Skills Pty Ltd t/as Learn to Surf Noosa
                                                  (No change)
     Learn to Surf Noosa Main Beach West 2        Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons
                                                  and Go Ride A Wave
                                                  (No change)
     Kayak Hire and Tours –                       Surf Skills Pty Ltd t/as Noosa Ocean Kayak Tours
     Noosa Main Beach West                        and Hire
                                                  (No change)
     Beach Equipment Hire – Main Beach            Dorajar Pty Ltd t/as Noosa Beach Surf Hire
                                                  (No change)
     Beach Equipment Hire –                       Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons
     Noosa Main Beach West                        and Go Ride A Wave Pty Ltd
     Snacks and Drinks Refreshment Noosa Spit     David Draper t/as Spit Beach Snacks
                                                  (No change)
     Surf Dancing - between rockwalls             Surfdancer Pty Ltd t/as Surfdancer
                                                  (No change)
     Kite Surfing Lessons – Noosa River Mouth &   Tarr’s Enterprises Pty Ltd t/as Adventure Sports
     Burgess Creek south to Peregian Beach        Kitesurf Australia
                                                  (No change)
     Settlers Cove Jetty Water Taxi               Wilschke Discretionary Trust t/as Gondolas of
                                                  Noosa Pty Ltd
                                                  (No change)
B.   Publicly re-advertise for Expressions of Interest for the beach massage permit and offer an
     interim permit commencing 1 July 2017 to the existing permit holder to allow continuity of
     operations until Council considers a further report on the outcomes of the new EOI process;
C.   Add a condition to both the Beach Equipment Hire permits to ensure that activity and
     equipment associated with the permits are limited to a 49m2 permit area; and
D.   Add a condition to the Beach Equipment Hire Noosa Main Beach permit to ensure the
     equipment trailer associated with the permit activity is delivered to Noosa Main Beach
     generally before 6:00am in the summer periods (from commencement of September school
     holidays to completion of Easter school holidays) and before 7:00am at other times.



REPORT
The purpose of this report is to seek Council endorsement to issue 3 year Commercial High Use
permits to conduct approved commercial activities on Council controlled land commencing 1 July
2017.

Council allows limited commercial use of public land under its control in accordance with its
Commercial Use of Community Land Policy. The majority of existing permits expire on 30 June
2017 and Council resolved to proceed to EOI’s for new permits at its Ordinary Meeting in March.
The EOI process formally opened on 7 April 2017 and closed on 2 May 2017.


                                                                                       Page 40 of 94

Section 41

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  6 JUNE 2017



Respondents were invited to submit applications to LG Tenderbox, Council’s e-tender portal.
There were 39 downloads by parties/businesses from the e-portal. A total of 14 businesses
applied for 10 activities.

Consistent with Council’s EOI processes, the following documents were available to respondents
via the e-portal:
   Invitation for EOI – General information for respondents;
   EOI Process Terms – Detailed acceptable conduct and obligations of respondents and
     Council and included further detailed information for respondents;
   EOI Response Form – Enabled respondents to respond to evaluation criteria via response
     schedules;
   Indicative Permit Conditions- Identified the indicative permit conditions common to each
     permit; and
   Commercial Use of Community Land Policy – Provided the policy framework for
     respondents.

The evaluation panel assessed the applications under probity and due diligence in accordance
with the assessment criteria and its obligations under this EOI process. The evaluation panel
consisted of:
 Procurement Advisor (external panel member);
 Property Manager;
 Governance Advisor;
 Property Advisor; and
 Chief Lifeguard, Surf Lifesaving Queensland (external panel member).

Table 1 below summarises the results of the assessment and identifies:
   The activities advertised for EOI;
   The respondents for each activity;
   The current permit holder (CPH); and
   The evaluation panel’s recommendation (if applicable) from 1 July 2017 for a 3 year term.




                                                                                 Page 41 of 94

Section 42

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                 6 JUNE 2017


Table 1 – Assessment Outcomes
Activity                             Respondents                                                              Recommendation
Learn to Surf Noosa Main Beach 1     1. Surf Skills Pty Ltd t/as Learn to Surf Noosa (CPH)                    Surf Skills Pty Ltd t/as Learn to Surf Noosa
                                     2. Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go Ride A Wave     (No change)
Learn to Surf Noosa Main Beach 2     1. Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go Ride A Wave     Go Ride A Wave Pty Ltd t/as Noosa Surf
                                     (CPH)                                                                    Lessons and Go Ride A Wave
                                     2. Surfdancer Pty Ltd t/as Surfdancer                                    (No change)
Kayak Hire and Tours –               1. Surf Skills Pty Ltd t/as Noosa Ocean Kayak Tours and Hire (CPH)       Surf Skills Pty Ltd t/as Noosa Ocean Kayak
Noosa Main Beach West                                                                                         Tours and Hire
                                                                                                              (No change)
Beach Equipment Hire –               1. Dorajar Pty Ltd t/as Noosa Beach Surf Hire (CPH)                      Dorajar Pty Ltd t/as Noosa Beach Surf Hire
Noosa Main Beach                     2. Vaclore Pty Ltd t/as The Original Noosa Beach Hire                    (No change)
                                     3.Golden Breed Corporation Pty Ltd
                                     4. JB Noosa Pty Ltd
                                     5. Noosa Blue Resort Management Pty Ltd t/as Stay Noosa Beach Hire
                                     6. Adam McKane and Isaac Smith t/as Noosa Hire
                                     7. Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go Ride A Wave
Beach Equipment Hire –               1. Vaclore Pty Ltd t/as The Original Noosa Beach Hire                    Go Ride A Wave Pty Ltd t/as Noosa Surf
Noosa Main Beach West                (CPH)                                                                    Lessons and Go Ride A Wave (Change)
                                     2. Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go Ride A Wave     Note: Current permit holder is Vaclore Pty Ltd
                                     3. Adam McKane and Isaac Smith t/as Noosa Hire                           (trading as The Original Noosa Beach Hire)

Snacks and Drinks Refreshment        1. David Draper t/as Spit Beach Snacks (CPH)                             David Draper t/as Spit Beach Snacks
Noosa Spit                           2. Classic Coffee Roasters Pty Ltd                                       (No change)

Surf Dancing – Noosa Main Beach      1. Surfdancer Pty Ltd t/as Surfdancer (CPH)                              Surfdancer Pty Ltd t/as Surfdancer (No change)
West (between rock walls)
Kite Surfing Lessons – Noosa River   1. Tarr’s Enterprises Pty Ltd t/as Adventure Sports Kitesurf Australia   Tarr’s Enterprises Pty Ltd t/as Adventure Sports
Mouth & Burgess Creek south to       (CPH)                                                                    Kitesurf Australia (No change)
Peregian Beach
Beach massage – Noosa Main           1. Nil                                                                   Not to be awarded as part of this EOI process -
Beach                                                                                                         see report for justification
Settlers Cove Jetty Water Taxi       1. Wilschke Discretionary Trust t/as Gondolas of Noosa Pty Ltd (CPH)     Wilschke Discretionary Trust t/as Gondolas of
                                                                                                              Noosa Pty Ltd (No change)



                                                                                                                                                Page 42 of 94

Section 43

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    6 JUNE 2017


Note the mobile beach refreshment business on Main Beach (Hey Bill) was not subject to EOI, as
this permit is an iconic lifetime permit, nor was the ice cream van (Frenzy Ice Cream) at the
eastern end of Main Beach (Park Road), as that permit expires in September 2020.

The evaluation panel recommendations reflect the assessment of each submission against the
agreed evaluation criteria previously endorsed by Council at the Ordinary Meeting held on 16
March 2017.

The panel’s summary evaluation spreadsheets for each activity are included as Attachment 1
and further details of the recommended permit holders by activity is provided below.

Learn to Surf Noosa Main Beach West 1

Council received two applications for this activity. Surf Skills Pty Ltd (trading as Learn to Surf
Noosa) is the existing permit holder and has operated surf lessons for approximately 15 years
from this location. The respondent provided a thorough, well written application that fully
addressed the assessable criteria.

The respondent demonstrated an extensive track record and appropriate levels of capital
investment. The respondent’s contribution to the local community, the local economy and the
number of relevant industry affiliations was also of a high standard. The respondent has provided
a professional service to the community over the permit term and there have been no compliance
issues regarding the permit holder’s performance over the previous permit term.

Learn to Surf Noosa Main Beach West 2

Council received two applications for this activity. Go Ride a Wave Pty Ltd (trading as Noosa Surf
Lessons and Go Ride a Wave) is the existing permit holder and has conducted surf lessons for
approximately 11 years from Noosa Main Beach West, from the Gold Coast since 2004 and
Victoria since 1987. The respondent provided a thorough application which fully addressed the
assessable criteria. The respondent demonstrated an extensive track record and appropriate
levels of capital investment. The respondent’s contribution to the local community, the local
economy and the number of relevant industry affiliations was also of a high standard. The
respondent has provided a professional service to the community over the permit term and there
have been no compliance issues regarding the permit holder’s performance over the previous
permit term.

Kayak Hire and Tours –Noosa Main Beach West

Council received one application for this activity. Noosa Ocean Kayak Tours and Hire is the
existing permit holder and has operated from Noosa Main Beach West for approximately 17
years. The respondent provided a thorough application which fully addressed the assessable
criteria.

The respondent demonstrated an extensive track record and appropriate levels of capital
investment. The respondent’s contribution to the local community, the local economy and number
of relevant industry affiliations were also of a high standard. The respondent has provided a
professional service to the community over the permit term and there have been no compliance
issues regarding the permit holder’s performance over the previous permit term.




                                                                                   Page 43 of 94

Section 44

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      6 JUNE 2017


Beach Equipment Hire – Main Beach

Council received 7 applications for his activity. Noosa Beach Surf Hire is the existing permit
holder and has operated beach hire activities on Manly Beach since 1992 and Bondi Beach since
2009. The respondent provided a thorough, well written application that fully addressed the
assessable criteria.

The respondent demonstrated an extensive track record in the industry and appropriate levels of
capital investment. The respondent’s contribution to the local community, the local economy and
the number of relevant industry affiliations were also of a very high standard. The respondent has
provided a professional service to the community over the permit term and there have been no
compliance issues regarding the permit holder’s performance over the previous permit term.

Proposed Permit Condition Changes

a)   The evaluation panel noted that existing conditions for this activity do not include a defined
     size (i.e. square metres) for the permit area. If left unaddressed this may lead to activity
     spread along the beach and undesirable visual clutter. It is recommended a defined permit
     area is implemented to ensure the activity is suitably contained. It is proposed that an
     operating area of 49m2 area be conditioned in the new permit commencing 1 July 2017.
     This represents a minor increase of 7m2 from the permit period 2010-2014 but a reduction
     of area compared to that observed during a recent site inspection.
b)   The evaluation panel also considered an appropriate trailer delivery time for the permit,
     given the area is heavily utilised by the public and is a busy pedestrian thoroughfare. It is
     recommended the equipment trailer delivery to the permit area occur generally before
     6:00am in the summer periods (September School Holidays commencement to Easter
     School Holiday completion) and before 7:00am at other times.

Beach Equipment Hire –Noosa Main Beach West

Council received three applications for this activity. The assessment panel recommends that Go
Ride a Wave Pty Ltd (trading as Noosa Surf Lessons and Go Ride a Wave) replace the existing
permit holder Vaclore Pty Ltd (trading as The Original Noosa Beach Hire). The respondent has
operated beach hire activities at multiple locations and previously held the Noosa Main Beach
Hire permit from 2010 – 2014. Overall, the respondent’s submission was of a higher standard. In
particular, the applicant demonstrated a more professional approach to business planning and
operations, a commitment to higher standards of service and quality of equipment. The panel
noted the strong contribution to the local community and a proposed level of capital investment
that was suitably detailed and realistic.

The panel noted the long family association with this permit of the current permit holder but found
the recommended applicant’s submission to be of a higher standard and indicated a more
professional operator likely to provide a higher standard of service.

Proposed Permit Condition Changes

For consistency, it is recommended a new condition also be added to this permit limiting the
operating area to 49m2. A trailer deliver time is not considered necessary for this permit due to it
being in a lower pedestrian traffic area.




                                                                                     Page 44 of 94

Section 45

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           6 JUNE 2017


Snacks and Drinks Refreshment – Noosa Spit

Council received two applications for this activity. The existing permit holder David Draper
(trading as Spit Beach Snacks) has held the permit for successive permit terms and
demonstrated a strong track record. The submission demonstrated sufficient competence across
all assessment criteria and is recommended to be offered a further permit. The respondent has
provided a professional service to the community over the permit term and there have been no
compliance issues regarding the permit holder’s performance over the previous permit term.

Surf Dancing – Noosa Main Beach West

Council received one application for this activity which was from the existing permit holder
Surfdancer Pty Ltd (trading as Surfdancer). The applicant demonstrated sufficient competence
across the assessment criteria and is recommended to be offered a further permit. The
evaluation panel noted this activity has ongoing potential to compete with permitted Learn to Surf
schools because learn to surf lessons are more popular than surf dancing lessons. The current
permit does not allow the permit holder to operate as a surf school open to the general public and
this permit will require ongoing monitoring by Council, as this condition will be retained in the new
permit.

Beach Massage – Noosa Main Beach

Council received no applications for this activity. Subsequently, on the 11 May 2017 the current
permit holder requested Council allow it to lodge a late submission, alleging a lack of notification
by Council. Council’s Procurement Branch advised the request was not able to be considered in
the current permit period because the public EOI process formally closed on 2 May 2017.

Given the interest expressed in the beach massage activity from the incumbent permit holder, it
is recommended Council publicly re-advertise the EOI for the permit, subject to the following:
    As the EOI process has formally closed, re-advertisement would occur after 15 June 2017
      (Council’s Ordinary Meeting);
    Respondents would be invited to submit applications to Council’s e-tender portal (LG
      Tenderbox) and an evaluation panel will be required to assess the applications. A report to
      Council will be required to report on the application assessment outcomes; and
    Given the advertising, assessment and reporting timeframes the appointment of the new
      permit holder will require some weeks to complete.

It is important to note that re-advertising this permit will result in the redirection of staff effort and
other additional costs to meet Council’s EOI protocols.

If this approach is adopted, a suitable interim permit arrangement with the existing permit holder
is also recommended to allow the activity to continue until the new permit arrangement is
confirmed by Council.

Kite Surfing Lessons – Noosa River Mouth

Council received one application for this activity from the existing permit holder Tarr’s Enterprises
Pty Ltd (trading as Adventure Sports Kitesurf Australia). The applicant demonstrated sufficient
competence across the assessable criteria and is recommended to be offered a further permit.

The respondent has provided a professional service to the community over the permit term and
there have been no compliance issues regarding the permit holder’s performance over the
previous permit term.



                                                                                          Page 45 of 94

Section 46

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 6 JUNE 2017


Settler’s Cove Jetty Water Taxi

Council received one application for this activity from the existing permit holder Wilschke
Discretionary Trust (trading as Gondolas of Noosa Pty Ltd). The applicant demonstrated
sufficient competence across the assessable criteria and is recommended to be offered a further
permit.

The respondent has provided a professional service to the community over the permit term and
there have been no compliance issues regarding the permit holder’s performance over the
previous permit term.

Previous Council Consideration

Ordinary Meeting, 16 February 2017, Item 1, Page 7

That Council note the report by the Property Advisor to the Services & Organisation Committee
Meeting dated 7 February 2017 and adopt the updated Commercial High Use Permit fees
effective 1 July 2017, as detailed in the report with an amendment to the proposed fee for the
Beach Hire – Rock Wall activity to retain the current fee level of $1,561.10.

Ordinary Meeting, 16 March 2017, Item 7, Page 9

That Council note the report by the Property Advisor to the Services & Organisation Committee
Meeting dated 7 March 2017 and
A.   Adopt the Expression of Interest (EOI) application assessment criteria and weightings as
     detailed in the report.
B.   Agree to proceed to the public EOI process for the Commercial High Use Permits.

Finance & Risk

Finance
1.   The costs incurred in the compliance and administration of these permits are
     accommodated in Council’s operational budget (predominately as labour costs) within the
     Corporate Services Department.
2.   The recommendation to re-advertise the beach massage activity will incur additional costs
     and staff time should Council wish to proceed to a further EOI process

Risk
1.   Commercial High Use Permits including the EOI process are a high profile component of
     Council’s land management. The activity locations are highly desirable community land
     parcels which are extremely well patronised by tourists and local residents and the
     activities have the potential to conflict with commercial businesses providing similar
     services leasing premises at commercial rates.
2.   Commercial High Use permits are highly competitive and subject to complaints, driven by
     existing permit holders and other competitors trying to enter the market.
3.   History shows that competitors have taken complaints to the CCC and Ombudsman for
     investigation regarding the transparency and rigour of the permit process.




                                                                                Page 46 of 94

Section 47

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                 6 JUNE 2017


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Director Corporate Services
Procurement and Fleet Manager
Property Advisor
Governance Advisor

Departments/Sections Consulted:

      Chief Executive Officer                Community Services                 X   Corporate Services
      Executive Officer to the Mayor & CEO   Community Facilities                   Financial Services
      Executive Support                      Community Development                  ICT
                                             Libraries & Galleries              X   Procurement & Fleet
                                             Local Laws                         X   Property & Facilities
                                             Waste & Environmental Health           Revenue Services

      Executive Office                       Planning & Infrastructure
      Community Engagement                   Building & Plumbing Services
      Customer Service                       Civil Operations
      Economic Development                   Disaster Management
X     Governance                             Infrastructure Planning & Design
      Human Resources                        Planning & Environment
      Sustainability                         Strategic Land Use Planning




                                                                                                Page 47 of 94

Section 48

ATTACHMENT 1




  Page 48 of 94

ATTACHMENT 1
    NOOSA SHIRE COUNCIL __ Weighted Attribute Evaluation Spreadsheet - Final Evaluation

   NAME OF TENDERER                    PRICE
   (Conforming Tenders Only)         (excl of GST)
 1
 2
 3 [ee   ee re eee ee GO ee eee el
 4 he cee fo sae, We eee             eee     |
 5 le     ee eg en Ce eee
 6 | gh OO oe a ea ee                ee gee |
 7 bse ee       ge   eS ee ee ae ee ar ee
 Sea ane eer eee ee et
 9: [RE SN           Ca        eae a eT, |
 20 [ei et RR an ee eT
   NON-CONFORMING TENDERS

                                        a          2           3          4          5          6          7          8          9         10
           PART A Non pie elements liam      |" mene seme)  es  6] eT]
               .                   Se                                           Ee                    ee
                                         Resukant   Resultant                         Resultant             Resukant  Resultant  Resultant
   Evaluation Criteria   Weighting (%)   score x    scorex                            score x               score x    score x    score x
                                        weighting   weightin,                         weightin;              hting      ighting     ti
  eee                       ee        [we |       fe |         oe [on Pom |e [ole pm) fom]                          few] t fee fe foe
         =      a EE Ee                                                                           ee
  ono                              ws Pm [os [oe [oe [om fo fom fo [om] of] © | w]e fo] Pom                                                Pom]
pee                   |   me    fos [os fons [oe |e [om [fom] © | om | © fom] © fom] » [om |» fom [poo]
  Emissions Reduction & Environment
  pees nas eigen                 paces | us | sox [vs [ o | om | > [om [           | om | > | om | o [om] o [om] [om] ao [om |
 fester)                                                 OO
  Economy & Industry Affiliations                     .

              Assessment Panel               Position Title                                                 =            «
 |___Contract Administrator & Assesment Panel Member | ____PropentyManager(a)  and weightings of this evaluation 7  AN
                                                                           The Contract Administrator confirms the above scores n
                                    Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)
                                      Governance, Risk and Legal Specialist (PB) Contract Administrator's signature: Property Manager (Cl)
           Assesment Panel Member 5

                                                                                                                               Page 48 of 94

Section 49

Page 49 of 94

NOOSA SHIRE COUNCIL —_ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
                      Permits for the Commercial Use of Community Land #2

  NAME OF TENDERER                  PRICE
  (Conforming Tenders Only)       (excl of GST)
1 |Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go Ride A
2 |Surfdancer Pty Ltd t/as Surfdancer
3 | ae     ees ee         ee |       ree S|
‘ (2    ee      ee                    ee
5 |S ss ee                        ee      |
6 le eo re                      ee eee |
7 [ee ee ee          ee     ee            |
’ (ee ee                 ee a oe          |
| eS See
We a eee        i ee ee a)
  NON-CONFORMING TENDERS

                                      1         2           3         4          5         6          f         8          9         10
  sk ise REA ae tee          3        imam | vesmaqmmee [es   a]    geek] Ee         |i ee ec                  a     |      i
                                 Ltd t/as Noosa ‘as dancer
                        :             Resultant   Resultant  Resultant Resultant            Resultant  Resultant Resultant Resultant  Resultant
  Evaluation Criteria   Weighting (%) Score score x Score score x Score score x Score score x score x  score x Score score x score x Score score x
                                      weighting  weighting   weighting weighting            weightin, ‘weightin; weighting weighting  weightin,
 Prawnacos       Tm Te | sexo [ve | zoo [io | om | oo | ow | o | om | o | om | o | om | o | om | o | om | o | om |
 emratimenmene       |   mm |e | oo | | zoo | oo | om | io | a [io | om | io | om | o | om | o | om | o | oo | o | om |
 isin               | mes fm [= fm fe] om] fe] >fm[ |=] e[m|>)w[ [mo]
soni                |    tm    | es | es | om [rm | o | oo [| o | om | 0 | om [| o | om | o | ow | » | om | o | om | o | om |
  aes                          Pes [as | on [as |         [ow [oe Poe Te [oof              [emf fom fe fom fo [om le [|
  Sustainabil
  Economy & Industry Affiliations | om | mi  .    =
                                        i    93.75 i

                                                                       The Contract Administrator confirms the above scores
    Contract Administrator & Assesment Panel Member 1                       and weightings of this evaluation a MM
                                   Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)
                                    Governance, Risk and Legal Specialist (PB) Contract Administrator's signature: Property Manager (Cl)
                                        Property Advisor (DW)

                                                                                                                        Page 49 of 94

Section 50

Page 50 of 94

NOOSA SHIRE COUNCIL —_ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
emai
   NAME OF TENDERER                              PRICE
   (Conforming Tenders Only)                  (excl of GST)
 1
 2 [RE ee Leet ee Te ee                    | ee ee |
 a | ae    2         Se ae                       ee |
 4 |  Se               ee             ee           er |
 5. [eee ce Oe           I ee ee ee |
 6 [Coke sae              eee            elt eee ce |
 ?        ee                      ee       eee
 8 |                        eee        ee ee             |
 9 |e i                ee eee eee                   ree |
 10 |S cake       eee           ee eee ee
   NON-CONFORMING TENDERS

                                                   1             2              3             4             5             6            rs             8             9             10
                                            Surf Skills Pty Ltd t/as
              PART A - Non price elements_       O
              PART A - Non pri n             Ni     ikea
                                                    Resultant     Resultant      Resultant                   Resultant      Resultant    Resultant     Resultant                   Resultant
   Evaluation Criteria          Weighting (%) Score  score x Score score x        score x              Score  score x       score x       score x Score score x                     scorex
                                                   weighting      weighting      weighting        g           weighting     weighting    weighting     weighting       g  g        weighting
   Prowtecord           Tm                  | | see |e | om             | io | om | o | om | io | om | oo | om | io | om | o | oo | o [om] o | om |
  epnatvesment               |    tm      | ers |    so [oo | om [io | om | io | oo | o | om | o | om | o | om | o [ om | o | om | o | om |
  jcvnnionenron             |      met ws | om |               fom |         fom fe fem                elm]             fem] >fem| fm] elm]                                    ||
      ;  ss                                   92.5
   Sustainabili
   Contribution to Local Community &

                                                     =e Soe?                                                                                       es

                                                               :                               The Contract Administrator confirms the above scores   ‘
       Contract Administrator & Assesment Panel Member 1 Property Manager (Cl)                        and weightings of this evaluation          “  A An
                                               Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)
                                                 Governance, Risk and Legal Specialist (PB)        Contract Administrator's signature:         Property Manager (Cl)
                                                       Property Advisor (OW)

                                                                                                                                                                Page 50 of 94

Section 51

Page 51 of 94

NOOSA SHIRE COUNCIL _— Weighted Attribute Evaluation Spreadsheet - Final Evaluation
   Serer                            Tene ectneomeciestommumtnt |
     NAME OF TENDERER                                                 PRICE
     (Conforming Tenders Only)                                    (excl of GST)
 1   |Adam McKane and Isaac Smith t/as Noosa Hire
 2   |Dorojar Pty Ltd t/as Noosa Beach Surf Hire
 3  |Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go Ride A
 4  [Golden Breed Corporation Pty Ltd
 5  |Vaclore Pty Ltd t/as The Original Noosa Beach Hire
 6  [1B Noosa Pty Ltd
 7  [Noosa Blue Resort Management Pty Ltd t/as Stay Noosa Beach
 8        ee i                                       ee
 9 le eg oe ee ee
10 be oe                                    ee
    NON-CONFORMING TENDERS

                                                                        t                    2                    3                   4                   5                   6                   i                   &                   9                  10
                   PART A - Non price elements                   Isaoc Smith t/es  —|Noosa Beach Surf Hire | Ltd t/as Noose   Corporation Pty Ltd | The Original Noosa | 78 NO0S@PtY Ltd | ny aaememt Pty Ltd
                                  E                            Adam McKane and     Dorojar Pty Ltd t/as Go Ride A Wave Pty     Golden Breed       Vaclore Pty Ltd t/as                   Noosa Blue Resort
                                                                         Resultant            Resultant            Resultant            Resultant                                                  Resultant           Resultant                               Resultant
    Evaluation Criteria                      Weighting (%)      Score     score x   Score      score x              score x    Score    score x    Score               Score                        score x              score x                      Score      score x
                                                                        weighting            weighting            weighting            weighting                  2                                weighting           weighti                    ‘            weightis
posers                         [we                                 [ow Pn Pe [oe Pom fo [oe |                                                           fae]                  oe                Peele pee                        ee
            a
   Sustainabilit                    ee
  Emissions Reduction & Environment                              =         a                                         =          a                  ae         ee                                | 4.00 |
   Contribution to Local Community &
                                                                                                       a as                             |,                                           HiRes oa
                                                             i           ne |                                     eee                                                      —$———                      eee |
                                                                                                                                                                                                             ee
                        Assessment Panel                                         Position Title                                                                                                           Y                <
                                                                                                                                       The Contract Administrator confirms the above scores             /       7
        Contract Administrator & Assesment Panel Member 1                    Property Manager (Cl)                                              and weightings of this evaluation                       q      ¢ 7        ca
                   Assesment Panel Member 2                       Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)                                                                                    si
                                                                    Governance, Risk and Legal Specialist (PB)                              Contract Administrator's signature:                             Property Manager (CI)
                   Assesment Panel Member 5                                 Property Advisor (DW)

                                                                                                                                                                                                                                   Page 51 of 94

Section 52

Page 52 of 94

NOOSA SHIRE COUNCIL _ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
            Contract Title:         Permits for the Commercial Use of Community Land #5
Somes
    NAME OF TENDERER                                       PRICE
    (Conforming Tenders Only)                           (excl of GST)
 1
 2 |Go Ride A Wave Pty Ltd t/as Noosa Surf Lessons and Go RideA $ 1,561.10
 3 |Vaclore Pty Ltd t/as The Original Nocsa Beach Hire
 4 ee A a OE ee ee                                         a eT |
 Be eee                                                          eT
 6 [oe            ee ae    ag ee ee ee ee ee
 Fe        ee ee Ne ee ee ee                                         |
 8            ee          et ie     ee     ee                        |
 9                           ee     ee            ee
 30 fe Seale nes             ee        Re Ree a ee               ar
    NON-CONFORMING TENDERS

                                                             1                4                 3                4                5                6                7                8                9               10
                 at |                               (oe                oe                en                           ie a                 i                an                  a                        ae
                                                     Adam McKane and Isaac [7 "#9  ae |  Vaclore Pty Ltd t/as The
                                                              Resultant         Resultant         Resultant        Resultant        Resultant       Resultant        Resultant        Resultant                         Resultant
   Evaluation Criteria                Weighting (%)   Score    score x  Score    score x           score x Score    score x          score x          score x         score x          score x                           score x
                                                             weighting          weighting        weighting        weighting         weighting        weightin;        weighting         eighting           tiny         weightin,
=                       SE                                                                                                             ee
 omens                                 ae                 [om [es [ce [To [aw |e Pom |e fom |                                                   fom              fem |             Pome pew                         pom]
power                              me [om [es                                   ee [oe [om |e fom |                            [om |              | om]          [om fe fom |                       peep op a]
   soca                           |          | [om Pes [os |                                 Poe [oe [om fo | om |                               | ow |          fom |» fom |» [om [poo]
   Emissions Reduction & Environment
fcomsiatanm                      |     =          | me | xe | os [aw [ms | wm |» [om |                                       » fom | o |e] fem} oem |] em] a [on]
   Contribution to Local Community &

                                                                                                                                                                               £2)
                    Assessment Panel                                 Position Title
                                                                                                                  The Contract Administrator confirms the above scores
       Contract Administrator & Assesment Panel Member 1         Property Manager (Cl)                                    and weightings of this evaluation
                Assesment Panel Member 2                Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)
                Assesment Panel Member 3                  Governance, Risk and Legal Specialist (PB)                  Contract Administrator's signature:                   Property Manager (Cl)
                                                                 Property Advisor (DW)
                Assesment Panel Member 5

                                                                                                                                                                                               Page 52 of 94

Section 53

Page 53 of 94

NOOSA SHIRE COUNCIL _ Weighted Attribute Evaluation Spreadsheet - Final Evaluation

         NAME OF TENDERER                     PRICE
         (Conforming Tenders Only)          (excl of GST)
       1
       2
       9       eee          ee  ee ee
       4    ee                    ie
       SO  etait Sec ee ees
       9 ee ee                               ee
       7 ee                    a ae         re
       © Cet eninnena      eee               eee
       9 sarees aca Sages ac,
      10 ee                                  ee ae
        NON-CONFORMING TENDERS

                                               1           2          3           4          5           6          7          8           9          10
                   ra:                   immer | sateen boas -: 22] Careneel                       eat
                PART A - Non price elements. Means py thet Suen Sick
              ee              eee        oe =             ee Se ee                                                                 ae
                                                            Resultant
        a Se                            ee                                                                                                    ee
    a a
        Activity Management Pion eee     S| ee Po                 eo fw                     [ole ple lot                       lle lel le
        Emissions Reduction & Environment
        coumaninatines     | %           | | so [ws [vo | o | om | » | em]                  |em| eo |om}o                 a]                  |e | om |
      Ftrecmicalscore     | tome                                     a
        eet                                       ai                                                                     f |
                                                   Position Title                 The Contract Administrator confirms the above scores «
       |__Contract Administrator & Assesment Panel Member | Property Manager(@)        and weightings of this evaluation QA
                                                                                                                       -
                                             Governance, Risk and Legal Specialist (PB) Contract Administrator's signature: | PropertyManager() Sid

                                                                                                                                        Page 53 of 94

Section 54

Page 54 of 94

NOOSA SHIRE COUNCIL _—_— Weighted Attribute Evaluation Spreadsheet - Final Evaluation
a
a ee                                                             gen”
  (Conforming Tenders Only) (excl of GST)                        \\
 1                                                           @¥
  ee ee eee
 ; ee                   ee                                XN
 5    ee               ee                              & ©                   ©
 6 [ie 5 oiapelisieetineeneeemagg ai ansegeaaeteliadaetenen a ®            &   ;
 0         healer ielgeee ne Ete              Sa}         @o          eS
0  aa   ee re      eee ee                    es         S)         eS
  NON-CONFORMING TENDERS                 e©         Ow)        & ®
                            | =— lf GS       _ ash         a                                 .
 peer          | ee        aoe         ee — aa                = Sl SS ieee
    EE                 OS    OE Se EE                                            eee
 Seiten       ET wm Lee Ns                 Bs eer     fe) | ee) | ce |e oe            ||
 a. ee ee                | om | + | ee |          ee |e fe |   Lom] foe |     [owe Pe |e |e |
                         a \\ VA
                         Ww                           idbiicetis
 |     Assesment Panel Member 2 (\\\u=—d> Chief Lifeguard Surf Lifesaving Qid (Greg Cahill) |
 |     Assesment Panel Membeh, (SM | Governance, Risk and Legal Specialist (P8)——_—| |__ Contract Administrator's signature: | PropertyManager(C)
 [|    Assesment PanelMembers | Procurement Advisor(AM)

                                                                                     Page 54 of 94

Section 55

Page 55 of 94

NOOSA SHIRE COUNCIL   Weighted Attribute Evaluation Spreadsheet - Final Evaluation

  NAME OF TENDERER                      PRICE
  (Conforming Tenders Only)           (excl of GST)
1
2 ete eee                                     |
3 | ee ee ee ee ee                     eee    |
5                a ee    ee ee       eee eT |
§      ee Se ee eee
6 (eS Se              ee eee                  |
7 | eae ee               ee           ee      |
& | soe a Se               eee eee
9 |               ee      ee      eee as
10. | ee Bie ee ee ee ee eee |
  NON-CONFORMING TENDERS

                                         1           2           3           4          5           6          €           8          9          10

                                          Resultant   Resultant   Resultant   Resultant  Resultant  Resultant   Resultant  Resultant   Resultant   Resultant
  Evaluation Criteria     Weighting (%)    score x Score score x Score score x Score score x score x Seore score x score x Score score x Score score x score x
                                          weighting   weighting   weighting  weighting   weighting  weighting   weighting  weighti     weigh!      weighting
 racenesrs            |     wm       mm | sem |    | oo | 0 | om | © | om | o | om | o | om | o | om | o | om | io | om | o | om |
 eonarimeniment       |     mm     | | zo | 0 | om | oo | om | oo | om | io | om | io | om | io [ow [io | ow | o [com | io | oo |
 Swng                  |    mm    | sm |r | io | oo | 0 | oo | o | oo | o | om | o | om | o | om | o | om | io | om | o | om |
  Emissions Reduction & Environment
  Contribution to Local Community &

                                                                              The Contract Administrator confirms the above scores f
     Contract Administrator & Assesment Panel Member 1 Property Manager (Cl)       and weightings of this evaluation  =
                                      Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)
                                       Governance, Risk and Legal Specialist (PB) Contract Administrator's signature: Property Manager (CI)
                                            Property Advisor (DW)
           Assesment Panel Member 5

                                                                                                                                  Page 55 of 94

Section 56

Page 56 of 94

NOOSA SHIRE COUNCIL —_ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
ee

 NAME OF TENDERER     PRICE
 (Conforming Tenders Only) (excl of GST)
1
2 |S ee             | OS
3 [ee Se ee ae eee
‘+ | Se ee ee ee ee ee    |
S ee ee     ee a eee ee |
6 [FS ee    ee ee  | eee |
7 |S      a ee eee eee |
§ |redue te ee oe ss Ee eer oe ee aS eee S|
8 ee ee ee eee
2) [ee   ae   eee ies oe a ee |
 NON-CONFORMING TENDERS

                       1      2      3     4     5      6     az     8     9     10
  aS einer mn aen225ermeenier [oss a[ mae | Sa ea ea Seco [eee |            es eee
                    Tarr’s Enterprises Pty
      PARTA in pri ments Ltd t/as
                       Resultant     Resultant Resultant Resultant Resultant Resultant Resultant Resultant
 Evaluation Criteria    score x      score x score x score x   score x score x score x score x
                       weighting      ti     tin)   i    cighti tiny weighti ti   weighti
 fracknecord |  me | wm | sz | oo | om | o | ow | o | om | o | ow | o | om | o | ow | o | om | o | om | o | om |
 csonatiwesment | me | os [| ro | oo | oo | o | om | o [ om | o | oo | o | om | o | om | o [ow | o | om | o | 0 |
 rcivnymanagementrin | oe |e | rm | © | om | © | om [| o | om o | ow | o | ow | o | ow | o | om | o | om | o | om |
 Sustainabil wrenment [sm | | sm | io | om | o | ow | o | om | o | om | o | om | o | om [ o | | o | ow | o | om |
       ‘moe | 2% | ws | wso | o | om | o | om | o | om | o | ow | o | om | o | ow | o | om | o | om | o | oo |
 ame             ay          a
 Econo Industry Affiliatio i

                                                                   co
                                            The Contract Administrator confirms the above scores
 | “Contract Administrator & Assesment PanelMember1 | __—_—_—PropertyManager(G)_— | and weightings of this evaluation {/
                                             Contract Administrator's signature: | PropertyManager(Q)

                                                                         Page 56 of 94

Section 57

Page 57 of 94

NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
      Contract Title: Permits for the Commercial Use of Community Land #10

  NAME OF TENDERER            PRICE
  (Conforming Tenders Only) (excl of GST)
1 |Wilschke Discretionary Trust t/as Gondolas of Noosa $ 1,500.00
2 | > ee ee                 ae     |
3 [Sie ee ee ee    ee     | ee ee
|     i he       ee       ee       |
S es Seas ee ae ae Oe ee eee Seal | ee ame |
 Garg eS                     ee ae
 | a ee ees | ee                   |
Bape i et ge                  ree  |
L, Ee oe ee   ee ee eee
10 oe eee ee               oe     |
  NON-CONFORMING TENDERS

                               1        2        3        4       5        6       x        8       3        10
 OS Gai a ate mt          Lemme       SSL NEAR ASG]         00     gl                  | Ree ee |e neg | UO
                             Wilschke
        PART A - Non price elemen ae tea ee
                               Resultant Resultant Resultant Resultant Resultant Resultant Resultant Resultant Resultant
  Evaluation Criteria Weighting (%) score x score x Score score x score x score x score x score x     score x score x
                                weighting weighting weighting weighting weighting weighting weighting R g eight ghting
 frecinecrd      |   wm   | | som | oo | om | io | om | o | om | io | om | o | om | o | om | o | om] io | om | 2 | om |
catiwerinene     |   ame] | sm | oo | om | oo | om | o | om | io | om | io | om | io | om | oe [om] o | om | o | om |
 acivtyanazementrian [toe | | eso | 0 | cm | o [ o | o | om | o | om { o | om | o | om | o | ow | o | om | o | 2m |
 ‘oma            |   mm   | | sm | oo | om | 0 | om | © | om | o | om | o | om | o | om | io | om | o | om | o | om |
  Sustainabili
 ccoomenuny amines |     | ms | asso | io | ow | a | om | 0 | am | io | am | io | om | o | om | o | om | o | om | o | om |
  Economy & Industry Affiliations ;

                                                          The Contract Administrator confirms the above scores d *)
    Contract Administrator & Assesment Panel Member 1 Property Manager (Cl) and weightings of this evaluation Wn
                             Chief Lifeguard Surf Lifesaving Qld (Greg Cahill)        7
                              Governance, Risk and Legal Specialist (PB) Contract Administrator's signature: Property Manager (Cl)

                                                                                                 Page 57 of 94

Section 58

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                        6 JUNE 2017



6                        NON-CURRENT ASSET ACCOUNTING POLICY UPDATE
DOCUMENT INFORM AT ION




Author                              Financial Accountant, Angelique Boog
                                    Corporate Services Department

Index                               ECM / Subject / Council Policies

Attachments                         1.   Non-Current Asset Accounting Policy


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Financial Accountant to the Services & Organisation
Committee Meeting dated 6 June 2017 and:
A.                       Adopt the updated Non-Current Asset Accounting Policy provided as Attachment 1 to the
                         report; and
B.                       Note that for asset accounting purposes, this policy is to be applied from 1 July 2016.



REPORT
Council’s Non-Current Asset Accounting Policy provides a framework for the capture, recognition
and control of Council’s non-current assets based on legislative requirements and in support of
Council asset management practices. Included in the policy are minimum threshold amounts per
asset class whereby expenditure can be capitalised and depreciated / amortised.

The policy has implications for Council’s annual budget in particular operating expenditure and also
the capital program.

An annual review of the policy has now been undertaken and a minor change has been
identified. Within the Plant & Equipment class, ICT assets will now have a minimum capitalisation
threshold of $1,000 compared to the $5,000 threshold applicable to all other Plant & Equipment
assets.


Previous Council Consideration

Special Meeting, 29 June 2016, Item 2, Page 2
That Council:
1.     …
2.     Adopt the Non-Current Asset Accounting Policy, which is provided as Attachment 3.
3 – 22 …..




                                                                                                       Page 58 of 94

Section 59

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                              6 JUNE 2017


Finance & Risk

Council’s strategic risk register identified poor asset planning having adverse community impacts
as well as Council’s ongoing financial sustainability.

Consultation

External Consultation - Community & Stakeholder

The Queensland Audit Office was consulted during the interim May 2017 audit.

Internal Consultation

The Financial Services team in consultation with the Manager ICT.

Departments/Sections Consulted:

   Chief Executive Officer                Community Services                 X   Corporate Services
   Executive Officer to the Mayor & CEO   Community Facilities               X   Financial Services
   Executive Support                      Community Development              x   ICT
                                          Libraries & Galleries                  Procurement & Fleet
                                          Local Laws                             Property & Facilities
                                          Waste & Environmental Health           Revenue Services

   Executive Office                       Planning & Infrastructure
   Community Engagement                   Building & Plumbing Services
   Customer Service                       Civil Operations
   Economic Development                   Disaster Management
   Governance                             Infrastructure Planning & Design
   Human Resources                        Planning & Environment
   Sustainability                         Strategic Land Use Planning




                                                                                             Page 59 of 94

Section 60

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     6 JUNE 2017


                                                   ATTACHMENT 1




                                                     Page 60 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       6 JUNE 2017

                                                                                   ATTACHMENT 1
   |_¢ ) |     NOOSA                                                        Council Policy
    x          Keene                                       NON-CURRENT ASSET
                                                            ACCOUNTING POLICY

    Corporate Plan Reference:                 Looking after community assets
    Endorsed by Council:                     XX June 2017
    Policy Author:                            Manager Financial Services

   POLICY BACKGROUND

   Council is responsible for the management of infrastructure and assets on behalf of the Noosa
   community. Council recognises that these assets must be appropriately managed so that they can
   continue to deliver services to the community in a sustainable manner.
   The purpose of this policy is to provide a framework for the capture, recognition and control of
   Council’s non-current assets based on legislative requirements and in support of effective and
   effective asset management.

   COUNCIL POLICY

   Scope
   This policy applies to all asset accounting related activities for items of property, plant and equipment
   and intangible assets as disclosed in Council’s Statement of Financial Position. This policy will apply
   to all Council activities.

   Objective
   The objectives of this policy are to:
   °    Maintain compliance with prescribed legislation and Australian Accounting Standards;
   °    Ensure accounting principles are followed when identifying, recognising, recording and valuing
        Council’s property, plant and equipment;
   °    Ensure all processes undertaken in relation to the content of this policy are appropriately
        documented and defensible to external audit;
   °    Ensure all asset movements are recorded in the financial asset register on a timely basis;
   °    Make sure capital works in progress balances are cleared no later than 3 months after practical
        completion of works;
   °    Ensure that Council’s asset register is the point of truth for both financial asset management;
        and
   °    Make sure that asset values are indexed between years of full revaluation where construction
        unit rates have changed materially.

                                                                                      Page 60 of 94

Section 61

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 61 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           6 JUNE 2017

   COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY

   Non-Current Assets

   1     Asset Classes

   A ‘class’ of non-current assets is a grouping of assets of a similar nature and use in Council's
   operations and which, for the purposes of disclosure, is shown as a single item in Council’s general
   purpose financial statements. The classes of property, plant and equipment assets are:

    Asset Class                     Asset Type Examples
                                    Council owned or controlled land
   Buildings                        Corporate and Community buildings, housing, sheds, public amenities,
                                    sports & recreational buildings
    Other Infrastructure Assets     Includes park, beach access, sporting ground and waste management
                                    infrastructure i.e. BBQ shelters, gazebos, park furniture, playground
                                    equipment, recreational playing courts, shade covers and irrigation
                                    systems, internal roads and car parks, landscaping, fencing, fibre optics,
                                    boat ramps and pontoons
    Plant and Equipment             Office furniture and equipment, computer equipment (excluding ICT
                                    software), fleet including motor vehicles trucks, heavy equipment,
                                    trailers, mowers and boats
    Road and Bridge Network         Road structures, kerb and channel, footpaths, roundabouts, bus shelters
                                    and bridges
                                    Box Culvert, Pipes, manholes, stormwater pits
    Intangibles                     Information Communication Technology software and licences

   2     Non-Current Asset Recognition
   An asset is recognised as a non-current asset in the financial asset register if it meets all of the
   following criteria:
   °     Council has control over the asset;
   °     It is probable that future economic benefits associated with the asset will flow to the entity
         (including non-cash service benefits);
   °     The cost or fair value of the item can be measured reliably;
   °     The cost or fair value of the asset exceeds Council’s asset threshold; and
   °     Expected to be used for more than one financial year.

   An item of property, plant and equipment that qualifies for recognition as an asset shall initially be
   measured at cost.

   3     Recognition Thresholds for Non-Current Assets
   In accordance with the Local Government Regulation 2012, Council must, by resolution, set an amount
   for each different type of physical asset below which the value of the asset must be treated as an
   expense. The thresholds detailed in the table below must be disclosed by way of note in Council’s
   general purpose financial statements.

                                                                                          Page 61 of 94

Section 62

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 62 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          6 JUNE 2017

   COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY

   Non-current asset thresholds are as follows:

    Asset Class                                   Asset Threshold
  plang                                                            SY
  |Builldings                                                   $15,000
    Other Infrastructure Assets                                   $5,000
    Plant & Equipment *                                           $5,000
    Roads & Bridge Network
                                                           Network Asset
    Intangible Assets                                             $5,000
   * ICT Plant and Equipment has a recognition threshold of $1000.
   Only expenditure that meets the non-current asset recognition criteria and is equal to or above the
   threshold will be capitalised within Council's asset register.
   Complex Assets
   A complex asset (i.e. a building) can be apportioned to individual significant components. Assets will
   be recognised at component level where feasible.
   The significant components of a complex asset are identified and depreciated separately. This
   provides accurate and relevant information for users of general purpose financial statements and for
   asset management purposes.
   A significant component is one that meets the following criteria:
   °     Can be separately identifiable and measurable and is able to be separated from the complex
         asset;
   °     May require replacement and intervention at regular intervals during the life of the complex
         asset;
   °     Has a significant value in relation to the total cost of the complex asset; and
   «     May have a different estimated useful life from the complex asset so that failure to depreciate
         it separately would result in a material difference in the annual depreciation expense for that
         asset.

   When replacing a component of a complex asset and if applicable the existing written down value of
   the original component should be written off.
   Components will be capitalised as long as the total capital project expenditure meets the asset
   recognition threshold.
   Networked Asset

   A network is a grouping of multiple assets that are individually below the capitalisation threshold. These
   assets perform a whole service and require recognition in the financial statements due to their
   collective value (i.e. roads and stormwater).
   Operating Asset
   Assets below the threshold may still be taken up in the asset register where required for asset
   management purposes as operating (non-financial) assets, including highly attractive items such as
   electrical equipment and small plant.

                                                                                         Page 62 of 94

Section 63

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 63 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             6 JUNE 2017

   COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY

   4     Asset Valuation

   Assets are to be recorded and maintained in Council’s enterprise management system as either a
   financial asset or an operating (non-financial) asset. On initial recognition, non-current assets will be
   measured at fair value based on the cost of the asset or for contributed assets using current
   construction unit rates or if required by initial valuation undertaken by a suitably qualified person.
   Costs need to be classified as either:
   °     Capital, which is included in the cost of an asset.  Capital costs are accounted for in the
         Statement of Financial Position and depreciated. They can be for a new, upgrade or renewal
         of an asset; or
   °     An expense in Council’s Statement of Comprehensive Income.

   5     Purchased Assets

   The cost of an item of property, plant and equipment comprises:
   e     Its purchase price, including import duties and non-refundable purchase taxes, after deducting
         trade discounts and rebates;
   °     Any costs directly attributable to bringing the asset to the location and condition necessary for it
         to be capable of operating in the manner intended.
   Directly attributable costs include:
   a)    Costs of employee expenses arising directly from the construction or acquisition of the item of
         property, plant and equipment;
   b)    Costs of site preparation;
   c) _ Initial delivery and handling costs;
   d)    Installation and assembly costs;
   e)    Costs of testing whether the asset is functioning properly; and
  f)     Professional fees.
   Once the asset is in the location and condition necessary for it to be capable of being operated in
   the manner intended, costs will no longer be of a capital nature.
   Costs of assets incurred after initial recognition are to be capitalised whenever the associated work
   either renews, extends or upgrades the asset’s underlying service potential.

   6     Contributed Assets

   Non-current assets that are ontributed to Council at no cost, or for a nominal cost, will need to be
   brought to account at fair value as at the date of acquisition. This is achieved by utilising existing
   construction unit rates or by a valuation undertaken by a suitably qualified person.

   7     Assets Not Previously Recognised
   Material assets not recognised in previous periods that subsequently meet the recognition criteria will
   be recognised from the date that the criteria are met. Where assets are identified that have not been
   previously recognised due to error, e.g. during asset verification, this is treated as the correction of an
   error under AASB 108 Accounting Policies Changes in Accounting Estimates and Errors. The error
   provisions require that the error should be corrected by making the entry that should have been made
   at the time the error occurred.

                                                                                            Page 63 of 94

Section 64

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 64 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          6 JUNE 2017

   COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY

   8     Assets under Construction (Work in Progress)
   Work in Progress (WIP) represents the accumulated costs of constructed assets e.g. costs associated
   with constructing or rehabilitating assets such as stormwater, roads, buildings and parks.
   The cost base of self-constructed assets is similar to the cost base for assets purchased including the
   following components:
   e     Direct materials, including stock issues;
   °     Direct and contract labour including on-costs; and
   °     Plant hire.

   Where a project is to be completed in stages, capitalisation of each stage may still occur providing the
   asset recognition criteria is met.

   9     Asset Expenditure
   Items that are less than the recognition threshold and do not form part of a complex asset or network
   are treated as an operating expense.
   The following initial costs are expensed not capitalised:
   °     General administration and other indirect overhead costs;
   °     Training costs; and
   °     Financing Costs - Interest charged on borrowings to fund asset purchases.

   Expenditure after Initial Purchase
   Costs incurred subsequent to the initial purchase of the asset will only be capitalised when it
   improves the condition of the asset beyond its original intended use or service capacity. This can
   occur through:
   °     Extending the service potential provided by the asset; or
   °     Extending the useful life of the asset.

   Repairs and maintenance are to be expensed as incurred, this includes expenditure incurred to
   restore an asset to its predetermined condition and/or its required service level. Examples include:
   °     Work conducted to preserve the asset’s condition and prevent deterioration and failure, i.e.
         regular servicing of vehicles.
   e     Restoration of an asset to its original state using the same / similar material.
   e     Replacement of minor asset components.

   Spare Parts
   Minor items of spare parts are charged to the item of plant and expensed. Major spare parts and
   stand-by equipment are recognised as plant and equipment when:
   °     The expenditure exceeds the asset recognition threshold; and
   e     The benefit from the item will be for more than one financial year.

                                                                                         Page 64 of 94

Section 65

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 65 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           6 JUNE 2017

   COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY

   10   Asset Disposal /Write-off
   An asset is written-off when destroyed, scrapped, lost or stolen and recorded in the Statement of
   Comprehensive Income. When consideration is received in the form of proceeds or trade-in, the
   asset is to be disposed in the financial asset register and a gain or loss on sale recognised in the
   Statement of Comprehensive Income.
   If the asset is to be sold, the provisions of AASB5 Non-Current Assets Held for Sale and Discontinued
   Operations may apply.
   The cost of demolition or removal of the old asset can be capitalised as site preparation costs of the
   new asset only if there is:
   °     No provision for restoration of the old asset; and
   °     Prior to demolition a formal Council commitment to demolish and build on the site of the old
        asset, e.g. Council meeting minute.

   If an asset is demolished or removed and there is no formal commitment to rebuild on the site prior
   to demolition or removal, the costs are to be expensed.
   Where an asset is valued at fair value and the costs of demolition or removal have been capitalised
   as site preparation costs, consideration should be given to impairment tests to ensure the asset
   value is not overstated.

   11.  Non-Current Asset Register
   A list of all of Council’s non-current assets, other than those items which are under the asset
   threshold and treated as an expense, must be recorded in a register which is to be kept by Council.
   The asset register is to record as a minimum:
   a)   opening and closing balances;
   b)   capital expenditures;
   c)   depreciation charges;
   d)   revaluation increments and decrements;
   e)   disposals/write offs;
  f)    contributed assets and previously unrecognised assets;
   g) _ internal transfers;
   h)   impairment losses; and
   i)   relevant dates for all the above transactions.

   12   Depreciation
   Where non-current assets have a limited useful life they must be depreciated in accordance with
   AASB116 Property, Plant and Equipment.        Depreciation is the systematic allocation of the
   depreciable amount of an asset over its useful life. Depreciation begins when an asset is available
   for use and ceases at the earlier of:
   a)   The date the asset is classified as held for sale; and
   b)   The date that the asset is disposed or written-off

   Each component will be depreciated separately. The depreciation charge for each period is classified
   as an expense in the Statement of Comprehensive Income. Depreciation forms part of the cost of
   operations and contributes directly to Council’s net operating result.

                                                                                          Page 65 of 94

Section 66

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 66 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        6 JUNE 2017

  COUNCIL POLICY — NON CURRENT ASSET ACCOUNTING POLICY

  The depreciation method used shall reflect the pattern in which the asset’s future economic benefits
  are expected to be consumed by the entity. Council has adopted the straight-line method of
  depreciation to reflect patterns of consumption for all non-current assets other than non-depreciable
  land, waste disposal assets and some road components.
  Work in progress cannot be depreciated as the assets are not available for use.
  Useful Lives and Rates

  The useful life of an asset is the estimated period over which a depreciable asset is expected to be
  able to provide future service potential. The estimation of the useful life of the asset is a matter of
  judgement based on the experience of the entity with similar assets.

  13   Asset Review

  Asset depreciation rate, remaining useful life and impairment are to be reviewed at least on an annual
  basis by asset custodians and management to ascertain if any amendments are required.

  14   Valuation of Assets

  Measurement after recognition
  Once assets have been initially recognised, assets are to be measured under either the cost or the
  revaluation model as required by AASB 116 Property Plant and Equipment and the Local Government
  Act 2009 and the Local Government Regulations 2012 and shall apply to an entire class of property,
  plant and equipment.
  After recognition as an asset, an item of property, plant and equipment shall be carried at its cost less
  any accumulated depreciation and any accumulated impairment losses.
  Revaluation Model

  An item of property, plant and equipment whose fair value can be measured reliably shall be carried
  at a revalued amount, being its fair value at the date of the revaluation less any subsequent
  accumulated depreciation and subsequent accumulated impairment losses.
  Cost Model

  After recognition as an asset, an item of property, plant and equipment shall be carried at its cost less
  any accumulated depreciation and any accumulated impairment losses.
  Council applies the following valuation methodology across its asset classes:

   Asset Class                         Valuation Methodology

 [Buildings                         sd Revaluation
   Other Infrastructure
   Plant & Equipment - General
   Roads & Bridges
   Stormwater & Drainage
   Intangible Assets

                                                                                        Page 66 of 94

Section 67

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 67 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           6 JUNE 2017

   COUNCIL POLICY — NON CURRENT ASSET ACCOUNTING POLICY

   15   Revaluation of Assets

   For all assets other than those valued at cost, non-current assets valuations should be reviewed at
   least once each financial year to ascertain if there has been a material movement in fair value
   (depreciated replacement cost/market value) since the last financial year.
   A full revaluation of all applicable asset classes will be undertaken at least once every five years.
   However, when an asset class has significant and volatile changes in fair value a revaluation should
   be undertaken on a more frequent basis. Council’s Audit & Risk Committee is to endorse the scope
   and methodology of all comprehensive valuations.
   If there has been no material movement of fair value, indices/desktop updates, either supplied by a
   qualified valuer or internal qualified staff, may be applied for the intervening years until a full
   revaluation is undertaken. There must be sufficient evidence retained that the index used is robust,
   valid and appropriate to the asset class. If an index is not applied in the prior year the index will then
   be cumulative.

   If an item of property, plant and equipment is revalued, the entire class of property, plant and
   equipment to which that asset belongs shall be revalued. Complex asset components are measured
   on the same basis as the assets to which they relate, e.g. the building asset class is valued at fair
   value therefore each building component is valued at fair value.
   Accounting for Revaluation
   When an asset is revalued, the accumulated depreciation is restated proportionately with the change
   in the gross carrying amount of the asset and any change in the estimate of the remaining useful
   life.

   Changes in the carrying amount of an asset due to a revaluation are accounted for in accordance with
   AASB 116.

   If the carrying amount of a class of assets is increased as a result of a revaluation, the net revaluation
   increase shall be recognised in other comprehensive income and accumulated in equity under the
   heading of revaluation surplus. However, the net revaluation increase shall be recognised in profit or
   loss to the extent that it reverses a net revaluation decrease of the same class of assets previously
   recognised in the Statement of Comprehensive Income.
   If the carrying amount of a class of assets is decreased as a result of a revaluation, the net
   revaluation decrease shall be recognised in the Statement of Comprehensive Income. However, the
   net revaluation decrease shall be recognised in other comprehensive income to the extent of any
   credit balance existing in any revaluation surplus in respect of that same class of asset. The net
   revaluation decrease recognised in other comprehensive income reduces the amount accumulated
   in equity under the heading of revaluation surplus.
   When an asset is disposed of, the amount reported in the asset revaluation surplus in respect of that
   asset is retained in the asset revaluation surplus and not transferred to retained surplus.

                                                                                          Page 67 of 94

Section 68

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 68 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       6 JUNE 2017

   COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY

   16    Asset Impairment
   All non-current assets including intangible assets are to be reviewed on an annual basis for indicators
   of impairment by asset custodians as detailed in the asset responsibility matrix.
   Where the fair value of the asset exceeds the recoverable amount it is recorded as an impairment
   loss. The recoverable amount of an asset is the higher of its fair value less costs to sell and its value
   in use. Where assets have been revalued at fair value there should not be any impairment loss as
   the recoverable amount should be equal to the fair value.
   An impairment loss is recognised as an expense in the Statement of Comprehensive Income, except
   where the asset is at fair value. When there is an impairment loss on a revalued asset the impairment
   loss is offset against the asset revaluation surplus of the relevant asset class to the extent available.
   Any remaining loss is then expensed in the Statement of Comprehensive Income.

   17    Materiality
   Materiality plays an essential part in the decision making process and preparation of the general
   purpose financial statements. This is because information contained or omitted can impair its
   usefulness to users.

   Materiality is a concept which requires professional judgment. An omission or misstatement of an
   item is material if, individually or collectively, it would influence the economic decisions of users of
   the financial statements or the accountability of management or governing body.
   In assessing materiality, the size and nature of the omission or misstatement are usually evaluated
   together. The surrounding circumstances will also be considered.
   As guidance in considering materiality thresholds the following can be used:
   a) | anamount equal to or greater than 10% of the appropriate base may be resumed to be
         material;
   b) | an amount equal to or less than 5% of the appropriate base amount may be presumed to be
         not material; and
   Cc) | anamount between 5% and 10% requires judgment.

   18    Disclosure in the Financial Report
   If non-current assets are stated as revalued amounts, the following will be disclosed:
   a)    The effective date of the revaluation;
   b) | Whether an independent valuer was involved;
   c)    |The methods and significant assumptions applied in estimating the item’s fair values;
   d)    ~The extent to which the item’s fair values were determined directly by reference to observable
         prices in an active market or recent market transactions on arm’s length terms or were estimated
         using other valuation techniques; and
   e)    The revaluation reserve, indicating the change for the period and any restrictions on the
         distribution of the balance to shareholders.

                                                                                      Page 68 of 94

Section 69

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   6 JUNE 2017




                                                   Page 69 of 94

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                6 JUNE 2017

 COUNCIL POLICY — NON CURRENT ASSET ACCOUNTING POLICY

 ROLES AND RESPONSIBILITIES

 Manager Financial Services — Policy Owner.
 Financial asset management requires a whole of Council approach and is the responsibility of the
 Asset Custodians, Asset Accountant and the Financial Accountant.

 RELEVANT LEGISLATION

 Local Government Act 2009
 Local Government Regulation 2012
 Australian Accounting Standards and Interpretations

                                                                               Page 69 of 94

Section 70

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       6 JUNE 2017


7                        2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
                         GRANTS (ROUND ONE) - PROGRAMS
DOCUMENT INFORM AT ION




Author                          Alison Hamblin, Community Development Manager
                                Community Services Department

Index                           ECM/ Subject/ Community Grants

Attachments                     1.   2017/2018 Round One Community Project Grants - Programs


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 6 June 2017 and approve the 2017/2018 Round One
Community Project Grants – Programs provided in Attachment 1 to the report.


REPORT
Purpose

The purpose of this report is for Council to consider and endorse the first round of 2017/2018
Community Projects Grants. Four separate reports have been provided to the June Services &
Organisation Committee Meeting reflecting the four grant categories:
1.   Programs
2.   Events
3.   Equipment
4.   Infrastructure

Background

The 2017/18 round of the Community Grants Program (Projects) was advertised in local media
and through community networks with a closing date of 29 March 2017. A total of 34 applications
were received requesting $274,361.84.

Applications were first checked for eligibility against the Noosa Council Community Grants policy
and guidelines. Eligible applications were reviewed and commented on by specialist staff with
appropriate expertise. All applications and staff comments were then discussed and assessed by
the grants assessment panel.

The assessment panel is recommending 23 applications receive $130,107.29 funding from the
Community Grants Projects Grants Program.

As per the Noosa Council Community Grants Policy, Assessment Panel members recognised
and declared any actual or potential conflicts of interest and did not debate/were not involved in
any discussions on matters relating to that application.




                                                                                       Page 70 of 94

Section 71

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     6 JUNE 2017


Implementation

Following endorsement of this report, grant applicants will be notified of the outcomes. Funding to
successful applicants will be distributed in July 2017 providing they have no outstanding debt to
Council.


Previous Council Consideration

Funding under round two of Council’s Community Grants Program was awarded at the Ordinary
Meeting on 15 December 2016. At that meeting Council also approved amendments to the
Community Grants Policy (see Council resolution below).

Ordinary Meeting, 15 December 2016, Item 1, Page 6
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 6 December 2016 and:
A.   Authorise the Chief Executive Officer to amend the Community Grants Policy so that pilot
     projects of up to three years become eligible for Community Project Grants funding;
B.   Consider Establishing a new category of grants to fund zero emission initiatives as part of
     the 2017/18 budget process; and
C.   Approve the 2016/2017 Round Two Community Projects – Programs provided in
     Attachment 1 to the report.

Finance & Risk

There is $287,300 allocated for Community Grants – Projects in the 2017/2018 budget.

Traditionally, there are two funding rounds for Community Projects Grants each financial year.


Consultation

External Consultation - Community & Stakeholder
 Free information sessions were held across the Shire for eligible not for profit community
   organisation to learn about the Council community grants program.
 Tourism Noosa
 State Government, Sport and Recreation Services

Internal Consultation

This report has been developed in consultation with staff across Council including
representatives from the following areas:
   Community Development
   Financial Services
   Executive Office
   Environmental Services

Applications for Projects have been assessed by Specialist Project Officers from the Community
Development, Community Engagement, Environment, and Natural Area teams.




                                                                                    Page 71 of 94

Section 72

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                   6 JUNE 2017


The Assessment Panel for this round of grants comprised the following Council Officers:
 Director of Community Services;
 Community Development Manager, and
 Planning and Environment Manager.

As part of the moderation process the Director of Community Services declared a conflict of
interest with regard to the application from Noosa Long Weekend.

Departments/Sections Consulted:

    Chief Executive Officer                X   Community Services                 X   Corporate Services
    Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
    Executive Support                      X   Community Development                  ICT
                                               Libraries & Galleries                  Procurement & Fleet
                                               Local Laws                         X   Property & Facilities
                                               Waste & Environmental Health           Revenue Services

    Executive Office                       X   Planning & Infrastructure
X   Community Engagement                       Building & Plumbing Services
    Customer Service                       X   Civil Operations
    Economic Development                       Disaster Management
    Governance                                 Infrastructure Planning & Design
    Human Resources                        X   Planning & Environment
    Sustainability                             Strategic Land Use Planning




                                                                                                  Page 72 of 94

Section 73

Page 73 of 94

2017-2018 Round 1 - Community Project Grant - Programs                                                                                                                                       Attachment 1
                                                                                                                                    Assessment
    Organisation Name                                                 Project Description                                             sholbis                      Conditions of Funding
                                                                                                                                    Recommend
                                                                                                                                          )

45010316462                  Contribution towards fuel costs to deliver service of LifeFlight                                                 .
                             Increase awareness of threatened aquatic species in Noosa hinterland                                                      a          ue                .
       .                        :          .                   :          :                 .         .                                           Funding is conditional on the provision of drafts of
Mary River Catchment         This proposal is to develop educational material and purchase display equipment to promote the                              :                                     .
      a.           a                             .             .                                                                        $3,300.00]}educational content to the fish hatchery steering
Coordination Association Inc|}endangered Mary River Cod breeding program at the Gerry Cook Hatchery, Lake Macdonald as an eco                            .        .                wo
                                 .       oo.                                                                                                      committee for sign off before publishing.
                             tourism destination.
                             Noosa Catchment Biopassage Assessment
                             This is stage two of a previously funded project to assess and rectify barriers to fish passage and other
Noosa and   District Landcare aquatic animals within the Noosa River catchment (estuary and freshwaters). Barriers preventing such
                             movement are more often than not a result of human settlement and include culverts, bridges, weirs,      $12,301.20
Group Inc.                                                   oe                   a                  .         a     ~
                             weed chokes etc. Removal or mitigation of these barriers improves aquatic connectivity (similar to
                             wildlife corridors on land) and allows fish and other aquatic animals to utilize their full suite of habitats
                             from birth to death which are necessary for healthy, viable populations.
Noosa Bushland Beach and Heathland Cooloola Reserves Rehabilitation
Creek Care                   Rehabilitation of a Council Road Reserve with additional weed control in nearby Council Bushland               $0.00
                             Reserves
           a                 Street Reach - Hydration Station
Noosa Christian Outreach     Providing hydration station, transport and first aid for young people in Noosa nightclub district on           $0.00
Centre                                  :
                             Saturday Nights
                             Scoping ‘Garden for Wildlife’ in Noosa                                                                                        an     a          .     .            '
                                           .        .               :           .                        .                    ae                  Funding is conditional on discussing the study's report
                             The proposal is a scoping study for the implementation of a Gardens for Wildlife (GFW) program within                         .        i      .
Noosa Integrated                           .      .                se          :                                          .      .                format with Council's Environment Officer (EO) for
                  ag.        the Noosa Shire. It will assess the feasibility of rolling out a GFW program to engage urban residents in  $3,000.00]  —.                :          .        :             '
Catchment Association Inc.     |...   .            .         oe                           oe      .                         :                     Rivers and Coast with a commitment to include the EO's
                             biodiversity conservation by assisting them to create (or transition) their gardens to weed free native                            .
                                      .                                                                                                           recommendations.
                              plant habitats.
           '                 Creative Leatherwork                                                                                                          .                           .
Noosa Men's Shed Inc.        Purchase of equipment and training to introduce leatherworking as an ongoing activity for members          $5,570.00) Part funding towards purchase of equipment
Queensland Koala             Koala Community Awareness Initiative
                             This proposal by the Qld Koala Crusaders sets out a number of activities for the training of citizen           $0.00
Crusaders Inc.                     ran                   oe          .
                             scientists in koala conservation in the Shire.
School Breakfast Support                                                                                                                          Part funding recommended for MR Driver training +
Group, a Division of         Driver Training for Delivery Volunteers                                                                    $3.961.00 Driver test fee + written test x 6 participants. Quote from
Scripture Union QLD Noosa Training of volunteers who deliver supplies for the Noosa school breakfast program.                             “~“""   Elite Truck Training to be resubmitted to include 6
Region School Chaplaincy                                                                                                                          persons.
                             Prioritised Referral Program
SunnyKids Inc.               For staff wages for the delivery of 10 individual family support programs via establishment of referral        $0.00
                              program with Cooroy State School
                                                                                                                              Total}  $27,932.20

                                                                                                                                                                                      Page 73 of 94

Section 74

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                        6 JUNE 2017



8                          2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
                           GRANTS (ROUND ONE) - EVENTS
DOCUMENT INFORM AT ION




Author                                    Alison Hamblin, Community Development Manager
                                          Community Services Department

Index                                     ECM/Subject/Community Grants

Attachments                               1.     2017/18 Round One Community Project Grants – Events


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 6 June 2017 and approve the 2017/2018 Round One
Community Project Grants - Events provided in Attachment 1 to the report.


REPORT
The purpose of this report is for Council to consider and endorse the first round of the 2017/18
Community Project Grants for Events as provided at Attachment 1 to this report.

Refer to report titled “2017-18 Community Grants Program Funding – Community Project Grants
(Round One) – Programs” for background and implementation information.


Departments/Sections Consulted:

                         Chief Executive Officer                    Community Services                     Corporate Services
                         Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
                         Executive Support                          Community Development                  ICT
                                                                    Libraries & Galleries                  Procurement & Fleet
                                                                    Local Laws                         X   Property & Facilities
                                                                    Waste & Environmental Health           Revenue Services

                         Executive Office                       X   Planning & Infrastructure
X                        Community Engagement                       Building & Plumbing Services
                         Customer Service                           Civil Operations
                         Economic Development                       Disaster Management
                         Governance                                 Infrastructure Planning & Design
                         Human Resources                        x   Planning & Environment
                         Sustainability                             Strategic Land Use Planning




                                                                                                                       Page 74 of 94

Section 75

Page 75 of 94

2017-2018 Round 1 - Community Project Grant - Events                                                                                                                                                   Attachment 1

                                                                                                                                      Peo als
                  ele UI    elm Cul                                                  Project Description                                  ET |                           Conditions of Funding
                                                                                                                                      Recommends
Central Queensland, Wide Bay, Sunshine Coast Primary 16. vtibution towards 2017 Healthy Towns Program                                     $1,000.00|Part funding towards the awards and celebration event.
Health Network (PHN
                   eae                                   A weekend event based in Cooroy, which features body art and entertainment.          a pt
                                                         Australian Body Art Festival

  :                    ‘                                 Noosa Botanic Gardens Plant Fair                                                                    ‘
Friends of Noosa Botanic Gardens                         To be held in September 2017 in the gardens.                                     $2,250.00]Part funding towards the event
                                                         2017 Nodes intermationad Fila Feativel                                                      Part funding towards the event. Funding is conditional on the
NIFF Inc. trading as Noosa International Film Festival                 ;       y      erasers  .         .                                $5,000.00]provision of a current Public Liability certificate and quotations for
                                                        A four day multi-genre film festival including screenings, events, workshops etc.            venue his
iin                                                     A series of community events to celebrate Noosa Radio 21st Birthda                    m0) {_rrrti—“t;C;*™*™*™CTCCCC~—
        —              ‘         :                       Noosa FM 21st Birthday Celebrations

                                                         Noosa Wallum Festival                                                                               Tr     ay           7%       .        ‘
Noosa Integrated Catchment Association Inc. (NICA)      A three day program of talks and activities to learn about and celebrate Noosa's  $2,915.00 FUREAG Is condbien 00 ve     Rea MEO UEES on He: aereae
                                                                                                                                                     of the program and details of event management.
                                                         ecosystem.
                                                         Noosa Strade Bianche 2017                                                                   Funding is conditional on Council Community Development Officer
Noosa Strade Bianche Association Inc                    A two day classic (recreational) cycling festival combining the coastal and       $4,000.00](CDO) to see quotes for advertising in cycling and travel
                                                         hinterland regions, available to local, domestic and international riders.                  magazines, guest speaker and photography services.
                                                         Seniors Art Exhibition                                                                      Funding is conditional on the provision of a revised budget with
Sunshine 60 and Better Group Inc.                       An art exhibition at the BFAC showcasing art created by seniors through           $1,525.00}clearly stated items for funding by Noosa Council.
                                                         workshops and community art programs                                                        It is also desirable this exhibition happen during Seniors Week.
                                                         anes  amines rooney ;                   :                     .                             Part funding towards the Noosa session. Funding is conditional on
      ;                 ae                               Reconciliation Sunshine Coast runs a seminar program about Indigenous and                          ae                                                 :
Sunshine Coast Reconciliation Group                          Bice       ;      Bo               ‘         :                   ;           $2,000.00]the provision of a budget for Noosa only components and setting
                                                         non-indigenous interaction in our area. This request is to fund one event in                Sete Bike 1ries WGI tas afinitlelile As Whe Marated wadianiks
                                                         Noosa (The J) as part of their wider Sunshine Coast program                                      P    9                            9              .
                                                         Festival Young Artist’s Program:
The Noosa Long Weekend Inc.                             Children’s Chorus and Regional Scholarship, participation in Opera Australia’s    $6,238.00
                                                         The Marriage of Figaro as part of the Noosa Long Weekend Festival.

                                                         Sunshine Coast Open House 2017                                                              eee
The Royal Australian Institute of Architects Ltd         General support for an Open House program in Noosa Shire (as part of a wider     $5,000.00         FER: 8 PARIS:                    :     ;      ;       :
                                                               Y                                                                                     Public Liability certificate, completed permit requirements, quotation
                                                         Sunshine Coast event)                                                                                                             cerekeciiy    ‘
                                                                                                                                                     for purchases over $1000 and the organisation's financials.
                                                                                                                               Total     $29,928.00

                                                                                                                                                                                         Page 75 of 94

Section 76

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                        6 JUNE 2017



9                          2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
                           GRANTS (ROUND ONE) - EQUIPMENT
DOCUMENT INFORM AT ION




Author                                    Alison Hamblin, Community Development Manager
                                          Community Services Department

Index                                     ECM/Subject/Community Grants

Attachments                               1.    2017/18 Round One Community Project Grants – Equipment


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 6 June 2017 and approve the 2017/2018 Round One
Community Project Grants – Equipment provided in Attachment 1 to the report.


REPORT
The purpose of this report is for Council to consider and endorse the first round of the 2017/18
Community Project Grants for Equipment as provided at Attachment 1 to this report.

Refer to report titled “2017-18 Community Grants Program Funding – Community Project Grants
(Round One) – Programs” for background and implementation information.


Departments/Sections Consulted:

                         Chief Executive Officer                    Community Services                 X   Corporate Services
                         Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
                         Executive Support                          Community Development                  ICT
                                                                    Libraries & Galleries                  Procurement & Fleet
                                                                    Local Laws                         X   Property & Facilities
                                                                    Waste & Environmental Health           Revenue Services

                         Executive Office                       X   Planning & Infrastructure
X                        Community Engagement                       Building & Plumbing Services
                         Customer Service                           Civil Operations
                         Economic Development                       Disaster Management
                         Governance                                 Infrastructure Planning & Design
                         Human Resources                        x   Planning & Environment
                         Sustainability                             Strategic Land Use Planning




                                                                                                                       Page 76 of 94

Section 77

Page 77 of 94

2017-2018 Round 1 - Community Project Grant - Equipment                                                                                             Attachment 1

                                                                                             Assessment
    ey cer Tal ty1itele mn Liat)                  Project Description                            eV                         Conditions of Funding
                                                                                            Recommends
                                                                                                            Part funding for the purchase of the computers is
                                                                                                            recommended on two conditions. Firstly, the budget is
AVCGA Noosa Coast Guard Upgrade to Training Room facilities                                                 resubmitted  and | a  3rd  quote  is sought | to meet
QF5                         Purchase of computers, a projector and cabinetry to upgrade           $6,860.00|procurement requirements as the purchase price is over
                            training capability for public and members.                                     $7500 and secondly, the training room to be made
                                                                                                            available to other community organisations for training
                                                                                                             purposes.
Cooroy Future Group Inc.    Purchase of public address system for the Cooroy Butter               $1,149.09
                            Factory
Flying-fox Rescue Release   |Aviary repair                                                          $555.00
Noosa Inc.                  The project is for upgrade of the flying fox aviaries.                       ,
                                                                                     Total        $8,564.09

                                                                                                                                                     Page 77 of 94

Section 78

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                        6 JUNE 2017



10                         2017-18 COMMUNITY GRANTS PROGRAM FUNDING - COMMUNITY PROJECT
                           GRANTS (ROUND ONE) - INFRASTRUCTURE
DOCUMENT INFORM AT ION




Author                                    Alison Hamblin, Community Development Manager
                                          Community Services Department

Index                                     ECM/Subject/Community Grants

Attachments                               1.     2017/2018 Round One Community Project Grants - Infrastructure


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 6 June 2017 and approve the 2017/2018 Round One
Community Project Grants – Infrastructure provided in Attachment 1 to the report.


REPORT
The purpose of this report is for Council to consider and endorse the first round of the 2017/18
Community Project Grants for Infrastructure as provided at Attachment 1 to this report.

Refer to report titled “2017-18 Community Grants Program Funding – Community Project Grants
(Round One) – Programs” for background and implementation information.


Departments/Sections Consulted:

                         Chief Executive Officer                    Community Services                 X   Corporate Services
                         Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
                         Executive Support                          Community Development                  ICT
                                                                    Libraries & Galleries                  Procurement & Fleet
                                                                    Local Laws                         X   Property & Facilities
                                                                    Waste & Environmental Health           Revenue Services

                         Executive Office                       X   Planning & Infrastructure
X                        Community Engagement                       Building & Plumbing Services
                         Customer Service                           Civil Operations
                         Economic Development                       Disaster Management
                         Governance                                 Infrastructure Planning & Design
                         Human Resources                        x   Planning & Environment
                         Sustainability                             Strategic Land Use Planning




                                                                                                                       Page 78 of 94

Section 79

Page 79 of 94

2017-2018 Round 1 - Community Project Grant - Infrastructure                                                                                                            Attachment 1

                                                                                                POET   Ths
  Oo] eT erie   meals                            Project Description                                areal)                             Conditions of Funding
                                                                                                Recommends
Noosa Beach Classic      Grandstands for the Noosa Hill Climb Course
                         Erect permanent grandstands along Gyndier Drive (for Noosa Hill                  $0.00
Car Club Inc.              .                     :
                         Climb and other community events)
                                                                                                                Expenditure of this Grant Funding is conditional on it not being spent on
Noosa Gymnastics Club |Extension and fit out to Bicentennial Hall                                   $30,000.00 ‘fitout’ until the approved extension is complete or approval is provided
Inc.                     Extension and fit out to gymnasium                                             "~~"    |by Council's Community Facilities Manager. Fit out is to be purpose built
                                                                                                                and permanently located at the Bicentennial Hall.
                         Upgrade kitchen in “Iris's Donger” for "Next Generation"                               Funding is conditional on the applicant submitting plans to Council
Noosa Show Society       Install sink and bench top, fryer and flooring in kitchen. Smaller part of  $4,250.00|Environment Health Officers (EHO) who can ensure appropriate fit out
                         a larger renovation project.                                                           for intended use.
Peregian Tennis Club     One-off court repair and re-conditioning
                              .             og:                                                           $0.00
Inc.                     Repair damaged artificial court surface
                                                                                                                Funding is conditional on the outcome of discussions with Council
Pomona and Cooran                                                                                               Community Development Officer (CDO) regarding    the seatin
Amateur Rugby League     |Construct permanent spectator seating                                      $3,160.00].       .          P              So, 9         9          9
                                                                                                                installation cost, process and the finalisation of tenure arrangements
Football Club Inc.                                                                                                                          .
                                                                                                                between the club and Council.
Pomona and District      Clubhouse upgrade and maintenance: replace floor and external
                            wg                                                                            $0.00
Squash Racquet Club      _|painting of clubhouse.
Pomona Cooroy and        Facility improvement: New path, drainage, safety fencing and                           Part fund to complete part of overall facility upgrade project, that is the
District Australian      seatin                                                                      $3,255.00   athway, drainage and fencin
Football Club Inc             9-                                                                                Pamway,        g            g.

                         Family Central’ Facility                                                               Part funding for two eligible items, roofing and trusses is conditional on
Sunshine Butterflies     Construction of final stage of community building called 'Family           $19,518.00 |gaining architectural and engineering plan certification. Payment of this
                         Central’, located at Sunshine Butterflies property.                                    grant will be differed until the roadworks outlined in MCU are completed.
Tewantin Tennis Club     Install "Book-a-Court' System
Inc                      Installation of infrastructure to support a Tennis Australia online         $3,500.00 |Funding is conditional on the provision of a revised budget.
   .                     booking system for local clubs.
                                                                                        Total       $63,683.00

                                                                                                                                                                     Page 79 of 94

Section 80

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     6 JUNE 2017



11                       REGIONAL ARTS DEVELOPMENT FUND - GRANT RECOMMENDATIONS - 2016/17
DOCUMENT INFORM AT ION




Author                           Community Development Manager, Alison Hamblin
                                 Community Services Department

Index                            ECM/Subject/RADF 2016/17

Attachments                      1.   Recommendations for funding


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Community Development Manager to the Services &
Organisation Committee Meeting dated 6 June 2017 and approve the Regional Arts
Development Fund recommendations for 2016/17 as outlined in Attachment 1 to the report.


REPORT
The Regional Arts Development Fund (RADF) supports cultural activity through the professional
development and employment of arts and cultural workers in regional Queensland. RADF is a
partnership between the State Government, Arts Queensland and Noosa Council.

The current RADF Committee comprises one Councillor, four external professional arts industry
representatives and Council Officers in supporting roles. The current RADF Committee members
are Jane Rivers, Rosie Lloyd-Giblett, Ulrike Sturm, and Janet Brimson. The Committee is
chaired by Cr Jess Glasgow.

This report covers the RADF grant round for 2016/17 which closed on 29 March 2017.

Promotion
Promotion of this RADF grant round included media releases to newspapers and social media
(Facebook).

A series of grant workshops were held by the Cultural Development Officer and Grants Officer.
All relevant information and supporting documentation was posted on the Council website.

Staff also attended face to face meetings with individual applicants and responded to telephone
enquiries and emails. As per the Community Grants Policy, all RADF applicants were required to
speak to a Grants Officer to discuss their project and get support through the application process.

Assessment
Assessment of this RADF round was a two stage process. Firstly Council invited artists and arts
organisations to provide a brief project pitch, which outlined their project idea.

This pitch was then assessed by the RADF Committee and if they judge that the project idea had
merit the applicant was invited to lodge a full RADF application.




                                                                                    Page 80 of 94

Section 81

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     6 JUNE 2017


These applications were then assessed and scored against the following RADF assessment
criteria:
1.     Will the project develop the paid artist’s professional life
2.     Will the project benefit the community, both directly and indirectly
3.     Is the project well planned and achievable
4.     Will the project increase the sustainably of quality and diverse creative communities

A total of 19 project pitches were received. 13 applications were then invited by the RADF
Committee to go to a full application resulting in 12 submitted applications requesting a total of
$59,110.

In accordance with RADF Guidelines, Committee members are required to declare any conflicts
of interest and once declared the Committee member is then not involved in related
deliberations.

In this round, conflicts of interest were declared by:
     Rosie Lloyd-Giblett who did not assess RADF7008, which was submitted by Press Gang
       Printmakers (Auspiced by Noosa Arts and Crafts Assoc. Inc), on the grounds she had
       written a letter of support for the application; and
     Jane Rivers who did not assess RADF7013 submitted by Noosa Arts Theatre on the
       grounds she is the Director of the performance and a committee member of the applicant
       organisation.

The RADF Committee recommended 11 applications totalling $40,000 for funding. The projects
recommended for funding are excellent in quality and diversity, and will employ quality artists and
arts workers who will engage in valuable arts and cultural activities across the region.

RADF funding notification
Upon Council endorsement of this report, successful applicants will be notified by mail including a
letter of acceptance for signature by the applicant.

Unsuccessful applicants who do not meet the grant criteria or who are not funded due to lack of
available funds will be advised in writing. Feedback is provided by the assessment panel on
areas of the project or application that may be improved.


Previous Council Consideration
RADF funding has been supported and administered by Noosa Council since 1996 and was
continued by Sunshine Coast Council from 2008 – 2013.

Noosa Council has continued with this partnership between State Government, through Arts
Queensland and with this grants program, allocating funds each year.

Finance & Risk
Funding of $40,000 is available in the 2016/17 Noosa Council budget for the RADF grant
projects. Funds will need to be carried over to the 17/18 budget due to the delays by Arts
Queensland in releasing the funds.

There are no risk implications.




                                                                                    Page 81 of 94

Section 82

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                    6 JUNE 2017


Consultation

External Consultation - Community & Stakeholder

      The RADF Committee, namely Jane Rivers, Rosie Lloyd-Giblett, Ulrike Sturm, and Janet
        Brimson.
      Arts Development Officer, Art Queensland

Internal Consultation
      Cr Jess Glasgow– RADF Committee Chairperson
      Director Community Services
      Libraries and Galleries Manager
      Community Development Officer – Arts and Culture
      Grants Officer, Community Development
      Management Accountant

Departments/Sections Consulted:

X    Chief Executive Officer                X   Community Services                     Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               X   Financial Services
     Executive Support                      X   Community Development                  ICT
                                            X   Libraries & Galleries                  Procurement & Fleet
                                                Local Laws                             Property & Facilities
                                                Waste & Environmental Health           Revenue Services

     Executive Office                           Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Disaster Management
     Governance                                 Infrastructure Planning & Design
     Human Resources                            Planning & Environment
     Sustainability                             Strategic Land Use Planning




                                                                                                   Page 82 of 94

Section 83

Page 83 of 94

2016-17 RADF Grant Recommendations                                                                                                                                                   Attachment 1

                                                                                                                                             RADF
 Applicant Name      Project Description                                                                            Location            Committee Conditions of Funding
                                                                                                                                     Recommends
                     Negative image: Making Light of the Dark     .               we crys             .        Cooroy Butter                        Resubmit revised budget.
                     Community awareness of mental illness. Negative Imagery exhibilition to be held during   Facto                         $1,000 Provide Certificate of Currency for Public Liability
                     Mental Health Week Oct 17.                                                                     Yy                                                          y
                     ‘In a Different Space’ (working title)
    .                The artist will work with members of Noosa's senior community to individulally choreograph,    .                                   .       ,                        Se
 Gall Hewton         perform and film a dance inspired by their lives. The resulting short dance film and collection Al Shire               $7,500/Provide Certificate of Currency for Public Liability.
                     of photographs will be exhibited widely.
                     Waterless Lithography Workshop                                                            Wallace House
 Press Gang          Professional development workshop introducing a new lithography printmaking technique            .      ,              $1,500]/Resubmit revised budget.
                                                                   .                                           Noosaville
                     for Press Gang members, teachers, and local printmakers.
                     The 'Art4Wellbeing' Program                                                               Wallace House
 Lisa Davis          Assists and empowers people through art to believe in their own creative potential to     Noosaville    ,              $2,695]Provide Certificate of Currency for Public Liability.
                     overcome life's obstacles.
 Noosa Concert       Noosa Concert Band Annual Scholarship                                                                                              .            .    ge                    .
                     Music tuition scholarship for two students for twelve months.                                                          $2,000/Provide the selection criteria for the scholarship.
                     ‘Jack of Hearts’                                                                                                                       .   .
 Noosa Arts Theatre |Secure professional actor Rory Williamson in Queensland premiere of Williamson's "Jack of s oosa Arts Theatre,         $5,000 ROCA Ferviond PADEIO
                           we                                   ..                                             Noosavile
                     Hearts" in September and workshops for aspiring actors.
                     ‘The Drum Kittys'                                                                                                                  .       .                              ee
 Anya La Zanya       Assisting local children, teenagers and adults to create and play " Drum Kittys", percussion Cooran and                $1,500 Provide Certificate of Currency for Public Liability.
                     :                                   as                                                    Pomona                               Resubmit revised budget.
                     instruments made from recycled ‘junk’.
                    ‘Treescape’                                                                                                                         .       .          .      .
 Art for ARTsake     Treescape - a leaf canopy installation made with recycled materials highlighting the      Noosaville Riverside         $2,900 Cotain permits and provide Certificate of Currency
                      .                             ot                  .         .                                                                 for Public Liability.
                     Biosphere ethos about community living in balance with our environment.
                     ‘Tree Place - Walk on Country’
 Anne Harris         Research & document historic, cultural & metaphoric explorations of place, including walks |All Shire                  $5,000]Resubmit revised budget.
                     on country and share learnings in workshops and community exhibitions.
 Playing with        ‘At the Table’
    ying W           Five arts-based workshops supporting women to develop themselves as artists, increase     Pomona
Possibilities           :    i         .          "                   oe .   .
                     their resilience to difficult emotions and reduce social isolation.
                     ‘The Love Me or Die’ preproduction
                     Preproduction support for the animation, ‘The Love Me or Die’, including mentoring from an             ,
 Stephen Famacek     experienced producer, and a community forum to be held at Central Queensland University   CQU, Nooeavile               $5,005
                     (Noosa Campus).
                     ‘arts4nSit-U'                                                                                .        .                                .   .
 Noosa Long    .     A series of indoor and outdoor pop-up visual arts and performance installations connecting Various locamans            $7,000 Reeubmk revieed budget.
 Weekend Festival       -                :      .           .          :           :                           around Noosa                         Permits may be required.
                     festival venues, creating excitement and interest during Noosa alive!
                                                                                                                             Total         $40,000

                                                                                                                                                                                      Page 83 of 94

Section 84

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         6 JUNE 2017



REPORTS FOR NOTING BY THE COMMITTEE
12                       PLANNING & INFRASTRUCTURE DEPARTMENT UPDATE - 3RD QUARTER 2016-17
DOCUMENT INFORM AT ION




Author                           Acting Director Planning & Infrastructure, Allan Hull
                                 Planning and Infrastructure Department

Index                            ECM/Subject/Branch Management/Planning and Infrastructure

Attachments                      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Acting Director Planning and Infrastructure to the Services &
Organisation Committee Meeting dated 6 June 2017 providing an update on operations of the
Planning & Infrastructure Department for the period 1 January to 31 March 2017.


REPORT
The adopted organisation structure includes the following branches under the Planning and
Infrastructure Department:
    Building and Plumbing;
    Civil Operations;
    Infrastructure Planning and Design;
    Planning and Environment;
    Strategic Land Use; and
    Disaster Management

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Planning and Infrastructure Department.




                                                                                         Page 84 of 94

Section 85

PLANNING AND INFRASTRUCTURE DEPARTMENT
BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                             THE NEXT QUARTER
Building and Plumbing
Ensure compliance with all legislated          Two-day application time frames are         Continue to maintain levels of               Develop       seamless    approval
response        timeframes          and          being met                                     legislative timeframes across the              processes and identify resource
communications with customers (internal        95% of twenty-day application                 Branch                                         management practices for proposed
agreed set KPIs and external legislative         timeframes are being met.                   Develop and implement a seamless               legislative changes.
2 and 20 day approvals/ 10 concurrence         Concurrence agency timeframes for             approval process for the introduction        Incorporation      of    additional
agency)                                          building and plumbing are being               of legislative change to adapt to              inspections
                                                 met.                                          proposed reduced timeframes for
                                                                                               Local Governments obligations to
                                                                                               approve plumbing applications.
Consolidating     Council      Backflow        Prepared reminder advice and                 Updating Council’s backflow device          Continue to identify non-compliance
Prevention Device Register                       enforcement actions                            register                                      devices
Security Contracts for Council Owned           Approval and delivery of Council             Agreement of contract to be                 Assessment of quotations and
Buildings                                        contract for security patrols for              released for tender                           identify suitable supplier
                                                 Council owned buildings                                                                    Prepare to compile collected data for
                                               Undertaken audit of council buildings                                                        preparation of five year plan
Review   educational    material      for      Researched and liaised with Qld              Compile letters for industry within         Deliver educational material and
swimming pool compliance                         Building & Construction Commission             Noosa        for    the      continued        undertake          meetings     with
                                                 to determine Council responsibilities.         maintenance of spas                           development owners and body
                                                                                              Develop scheduled meetings with               corporate reps
                                                                                                multi development owners to discuss
                                                                                                issues with maintenance of spas and
                                                                                                pools
Prepare for and implement effective            Noosa     Council    representatives         Further develop the management of         Prepare additional Fees and Charges
responses to the legislative changes to          attended two legislation workshops             actions for the introduction of new         for new legislative obligations
the Plumbing Act amendment                       in Brisbane                                    proposed changes for plumbing
                                                                                                applications.
                                                                                              Develop new templates for the
                                                                                                introduction of new legislation
Implementation of BBQ installation plan        Prepared order/delivery of new              Complete installation of identified        Project complete
                                                 BBQs                                          benches and BBQ plates
                                               Undertaken scheduled work for               Installation of new BBQs
                                                 installation of benches and BBQs
                                                 Plates
Prepare and evaluate Councils cleaning         Developed scope of works and went           Evaluation completed                       Prepare report for Council with
contracts                                        to market with request for tenders                                                         proposed desirable contractor/s for
                                                                                                                                            Councils cleaning contract/s

                                                                                                                                                                  Page 85 of 94

Section 86

BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                         THE NEXT QUARTER
Business as Usual Activities                   Existing preventative maintenance          Legislative time frames for all        Maintain 2-day & 20-day approval
                                                 programmes meeting expectations              applications                             legislative timeframes.
                                                                                            Continuation       of  preventative    Lower Mill Site contract completed
                                                                                              maintenance programs                     prepare report for Council outlining
                                                                                            Delivery of contract works for the       results.
                                                                                              lower mill site Cooroy

Civil Operations

Management of Bushland          Reserves       Appointment        of      successful      Develop        bushland    reserve       Update & improve the Bushcare
including coordination of       volunteer        consultant to begin Bushland                 restoration plans                          content on Council’s Website
Bushcare Groups.                                 Reserves Management Plans an               Assess      outstanding   Voluntary      Develop guidelines and strategy for
                                                 Ecological Restorations Plans                Conservation            Agreement          Bushcare groups
                                               Standardising     volunteer    Safety        applications
                                                 procedures to align with Council           Working with voluntary Conservation
                                               Commencement of new Green Army               Agreement property owners
                                                 team
                                               Bushcare Leader planning workshop
                                                Report to Council regarding new
                                                 Land for Wildlife MoU.
Provision of disaster response capability      Response to and subsequent clean-          Review      processes     following      Submit NDRAA claim.
                                                 up from Ex TC Debbie                         response to Ex TC Debbie                 Review Field Coordination Centre
                                                                                            Collating information for NDRAA            against deliverables proposed in
                                                                                              claim.                                     planned exercise using Debbie as
                                                                                                                                         the exercise.
Manage     the  delivery of     asset          Refurbishment of street furniture at       Finalise service levels & report to      Improvement of Branch processes
maintenance    services     including            Noosa Junction.                              Council                                    using Council’s Works system
monitoring and review of Levels of             Completion of bridge repair program        Complete Capital work program            Further role out of mobility devices
Service                                        Reconstruction of park furniture in          including, Black Mountain Road slip        to Parks and Natural Areas staff
                                                 Gympie Tce, Noosaville ongoing.              repair, Cooroy – Noosa Road stage
                                               Completion of quarterly playground           4, Lake Weyba Drive culverts and
                                                 compliance inspections                       bus turnaround
                                               Pavement Repair Program complete           Resurfacing program




                                                                                                                                                             Page 86 of 94

Section 87

BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                       CURRENT PRIORITIES                         THE NEXT QUARTER
Identify Branch level actions within           Contractors    using  “Noosaphalt”    Engaging consultant to monitor and        Engage contractor, testing and
Council's Carbon Reduction and Energy            warm mix asphalt and “Toner seal”       assess performance of “Noosaphalt”          evaluation
Efficiency Plan including waste reduction        as part of Council’s resurfacing        warm mix asphalt at a trial site at      Continue discussions, consult with
                                                 program     resulting  in  carbon       Eenie Creek Rd                             asphalt     contractor    to   provide
                                                 emission reductions and material      Maintenance      gravel   trial and        emission savings using “greener”
                                                 reuse.                                  screening of street sweepings.             asphalt      and      spray    sealing
                                                                                                                                    technologies; Participation in ZEN
                                                                                                                                    action team.
                                                                                                                                  Continue to trial and monitor recycled
                                                                                                                                    maintenance gravel and research
                                                                                                                                    methods      for    screening    street
                                                                                                                                    sweepings to turn into a useable
                                                                                                                                    asset.
Conduct a Branch Workforce Planning           Confined spaces training                 Ongoing training delivery              Implement actions arising from the
Pilot project                                 Develop training budget submissions                                                  Workforce Plan
                                                and liaise with Human Resources
                                                Branch on training needs arising
                                                from the Plan
Management of Ringtail Quarry including       Crushing       blasted   rock   and     Renew Ringtail Quarry Site Based          Implement recommendations          of
associated   Stockpile  &     materials          stockpiling                              Management Plan.                            external business review
Recycling Operations                          Ringtail Quarry nominated for          Conduct an external business review
                                                 LGMA award for excellence -              of Ringtail Quarry operations
                                                 Sustainability                         Staff    attendance     at    Annual
                                              Mulching of vegetation debris from         Quarrying Safety and Health
                                                 TC Debbie.                                Seminar
                                              Delivery of profilings to asphalt
                                                 plant for recycling
Business as Usual activities                 Civil Operations Technical Officer        Tree Policy & process review             Preparation for 2017/18 resurfacing
                                                appointed                                Completion of 2016/17 Resurfacing          program
                                             Refresh supply contracts for Traffic        Program
                                                Control services and Linemarking         Recruiting Arborist Tree Assessment
                                             Tree management workshop with               Officer
                                                Councillors
                                             2017/18 Budget preparation
                                             Resurfacing of Botanic gardens
                                                pathways




                                                                                                                                                          Page 87 of 94

Section 88

BRANCH ACTIVITIES                               RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                                THE NEXT QUARTER
Infrastructure Planning & Design
Development of the Noosa Transport                 Councillor workshop to review Draft        Report to Council to adopt Draft                Finalisation of Transport Strategy
Strategy in conjunction with Strategic               Transport Strategy                           Transport Strategy
Planning
Implement recommendations of the                   Implementation of Traffic      Study       Services relocation for design of               Design of Ernest St and Hilton Tc
Traffic Study and monitor outcomes with              recommendations ongoing.                     Ernest St and Hilton Tc intersection              intersection    improvements      and
audits with aim to improve safety                                                                 improvements continuing                           service relocation continues
standards                                                                                       Commencing design of Ernest St                  Design of Moorindil St and
                                                                                                  and     Hilton      Tc      intersection          Poinciana     Avenue      intersection
                                                                                                  improvements                                      improvements continues.
                                                                                                Commencing design of Moorindil St
                                                                                                  and Poinciana Avenue intersection
                                                                                                  improvements.
Implement Asset Management roadmap                 Appointed one Technical Officer to         Complete     the     strategic      asset       Finalise    the    strategic   asset
initiatives.                                         assist in the implementation of              management plan.                                  management plan.
                                                     roadmap initiatives.                       Compile a project plan for asset                Improve the structure and forums for
                                                   Establishment of asset management            management         from        initiatives        the various work teams that have
                                                     work teams to assist in improving            contained      within     the       Asset         been initiated to further develop
                                                     processes and procedures across              Management Roadmap                                asset management practices across
                                                     various assets.                                                                                the organisation.
                                                   Additional officer in place to assist
                                                     with AM roadmap implementation.
Commence pilot for         detailed     Asset      Finalised quotation to engage              Appoint a consultancy service to                Commence development of the
Management Plans.                                    consultancy service to assist in the         assist in developing detailed asset               detailed Asset Management Plan.
                                                     development of asset management              management plans.
                                                     plans.
Delivery     and    oversight   of  the            Significant planning and design work       Commencing construction activities              Further increase in construction
infrastructure Capital Works Program for             undertaken during the quarter of the         of a number of capital projects in                projects across the capital program
2016/17                                              capital works program, and have              order to complete the program on                  as designs are completed.
                                                     commenced construction projects.             budget.
Develop 5 and 10 year Capital Works                5 year capital program provided to         Update the priority project scoring to         A draft 5 year Capital Works
Programs for Council consideration                   Councillors in Budget Workshop 1             be more evenly weighted across the               Program to be endorsed by Council
before end of June 2017                                                                           organisations assets and services.               at budget adoption.
Develop 3 year asphalt road reseal                 Draft 3 year reseal program has            Continue with compilation of a draft          A Budget analysis finalised and a
program                                              been developed & currently under             3 year reseal program.                           proposed 3 year reseal programme
                                                     review from a financial perspective.                                                          presented to Council for comment.
Public Transport – electric bus trial              Monitor programme and key hold             Continue to monitor programme and              Continue to monitor programme
                                                     points.                                      key hold points.                                  and key hold points.


                                                                                                                                                                         Page 88 of 94

Section 89

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
Continue implementation of the mobility       Further roll-out within the Parks &         Development of more detailed              Pathway       inspections     to   be
application across the organisation with        Natural Areas crews.                          pathway inspection programmes to            implemented       in   mobility   and
greater than 50% implementation of Civil                                                      complement asset condition and              supported with detailed reporting.
Operations (including Parks).                                                                 insurance compliance.                     Planning of mobility roadmap
                                                                                            Mobility roadmap for endorsement            outside of infrastructure department.
                                                                                              by the asset management steering
                                                                                              committee.
Develop process to reduce the number          Completion of the majority          of      Continue developing an in-house         Implement the assessment tool with
of traffic related CRM’s not completed          backlog traffic related CRM’s.                assessment tool to evaluate traffic       minimal backlog CRM’s going
within timeframes.                                                                            requests.                                 forward.
Business as Usual activities                  Capital works Executive and Project         Evaluation and recommendation of        Report to CWE and PCG’s on
                                                Control Groups continue along with            Kinmond Creek Road tenders                progress of Capital Works Program
                                                reporting      spreadsheet     and          Proposal for trial section of Main      Award the following:
                                                governance terms of reference for             Beach boardwalk design and                o Kinmond Creek Road, Eastern
                                                capital works management.                     construction (between Surf Club and          Branch     and    Sandy    Creek
                                                                                              Park Road).                                  reconstruction
                                                                                            Commence Hilton corridor upgrade        Commence works for:
                                                                                              design contract.                          o Thomas          Street     culvert
                                                                                            Assess Park Road Boardwalk                   reconstruction
                                                                                              tenders

Planning & Environment

Management of Flying Fox Issues               Subsidy scheme for residents                Implementing stage 2 of Sprinkler         Ongoing operation of sprinkler
                                                affected by flying fox in Wallace Park        system in Wallace Park                      system as needed
Draft Local Government Infrastructure         Desired standards of service for all        Plans for trunk infrastructure maps       Finalise schedule of works model
Plan                                            infrastructure networks reported and          and draft schedule of future works        Finalise LGIP documents and
                                                adopted by Council                            and costs for transport and                 extrinsic materials for reporting to
                                              Plans for trunk infrastructure maps           stormwater networks                         independent reviewer
                                                and draft schedule of works for             Progressive reports to be presented       First state interest review by DILGP
                                                parks and land for community                  to      Council     for    remaining
                                                facilities network reported and               infrastructure networks
                                                adopted by Council
Develop    Noosa   River   Management         Review of Noosa River Plan Current          Continue discussions with state           Future workshops with Council to
Strategy                                        Actions                                       agencies on Jury recommendations            address Jury recommendations and
                                                                                            Review and update Noosa River               community consultation
                                                                                              Plan



                                                                                                                                                              Page 89 of 94

The text continues on section 90.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.