SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 JUNE 2017
Page 64 of 94
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 JUNE 2017
COUNCIL POLICY - NON CURRENT ASSET ACCOUNTING POLICY
8 Assets under Construction (Work in Progress)
Work in Progress (WIP) represents the accumulated costs of constructed assets e.g. costs associated
with constructing or rehabilitating assets such as stormwater, roads, buildings and parks.
The cost base of self-constructed assets is similar to the cost base for assets purchased including the
following components:
e Direct materials, including stock issues;
° Direct and contract labour including on-costs; and
° Plant hire.
Where a project is to be completed in stages, capitalisation of each stage may still occur providing the
asset recognition criteria is met.
9 Asset Expenditure
Items that are less than the recognition threshold and do not form part of a complex asset or network
are treated as an operating expense.
The following initial costs are expensed not capitalised:
° General administration and other indirect overhead costs;
° Training costs; and
° Financing Costs - Interest charged on borrowings to fund asset purchases.
Expenditure after Initial Purchase
Costs incurred subsequent to the initial purchase of the asset will only be capitalised when it
improves the condition of the asset beyond its original intended use or service capacity. This can
occur through:
° Extending the service potential provided by the asset; or
° Extending the useful life of the asset.
Repairs and maintenance are to be expensed as incurred, this includes expenditure incurred to
restore an asset to its predetermined condition and/or its required service level. Examples include:
° Work conducted to preserve the asset’s condition and prevent deterioration and failure, i.e.
regular servicing of vehicles.
e Restoration of an asset to its original state using the same / similar material.
e Replacement of minor asset components.
Spare Parts
Minor items of spare parts are charged to the item of plant and expensed. Major spare parts and
stand-by equipment are recognised as plant and equipment when:
° The expenditure exceeds the asset recognition threshold; and
e The benefit from the item will be for more than one financial year.
Page 64 of 94See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.