Skip to the record
Accept no substitutions.

Original source · versioned page text

Swmp

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

                                                                        Wyandra Street
                                                                                                         Qchange
                                           A.E.P                Qexisting      Qproposed    Qchange       (%)
                                                                (m³/s)         (m³/s)       (m³/s)
                                             1EY                 0.014          0.015        0.001         7%
                                            50%                  0.016          0.018       0.002         13%
                                           0.2 EY                0.025          0.027       0.002          8%
                                            10%                  0.032          0.032          0           0%
                                             5%                  0.036          0.036          0           0%
                                             2%                  0.041          0.042       0.001          2%
                                             1%                  0.045          0.046       0.001          2%



As expected, the site has increased the total peak flows from the site for a number of storm events. Attenuation will
be provided to mitigate the outflows to ensure that the development does not exceed the predevelopment levels
to minimise impacts to the downstream environment.

The mitigated post-development model splits the catchment into a roof area, which drains to an on-site detention
(OSD) tank, and the remainder of the site which is not attenuated. An iterative process was used to determine a
suitable configuration of storage volume, low-flow, and high flow pipe outlets for the OSD to deliver the required
reduction of the flow rates from the site.

The result of the iterative sizing process determined that the OSD storage will need to provide an attenuation
capacity of 4,000L for the proposed roof area with the maximum possible roof area to be plumbed to the tank. A low
flow outlet consisting of a 58mm orifice plate is to be provided the base of the tank, and a 100mm high flow outlet
at the head of the tank will provide discharge for larger storm events.

Using this mitigated development model, the proposed developed flows were again compared to the existing state
as shown below in Table 3.2 Existing and proposed mitigated site peak discharge rates.

                                Table 3.2 Existing and proposed mitigated site peak discharge rates

                                                                        Wyandra Street
                                                                                                         Qchange
                                           A.E.P                Qexisting      Qmitigated   Qchange       (%)
                                                                (m³/s)         (m³/s)       (m³/s)
                                             1EY                 0.014          0.014         0            0%
                                            50%                  0.016          0.016          0           0%
                                           0.2 EY                0.025          0.024       -0.001         -4%
                                            10%                  0.032          0.028       -0.004        -13%
                                             5%                  0.036           0.03       -0.006        -17%
                                             2%                  0.041          0.035       -0.006        -15%
                                             1%                  0.045           0.04       -0.005        -11%



As the total peak flows are equal to or below the existing site conditions for all storm events, the proposed OSD area
will provide the mitigation required for the peak flow storm events from the development.




Project number 20220130
File RECOR Preliminary Stormwater Management Report - 20220130.docx, 2022-05-19                                      Page 10 of 16
Revision 1


P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566            E [email protected]    recorconsulting.com
Log in to download the original file

SWMP.pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.