211207 - 16 McAnally Drive - SD schematic design - full set - DA lodgement
Very large file: it may take a few minutes
The original of this document is very large (60.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
.
sheet number sheet name Current Revision Current Revision Date COPYRIGHT: Drawings remain the Copyright of the Architect: Shaun Lockyer LICENSED TRADESPERSONS: All services to be installed by licensed
tradespersons in accordance with local authority and with current manufacturers
ALL WORKS shall be carried out in accordance with the Building Code of specifications.
000.00 perspective images C 07.12.21 Australia, Australian Standards, Local Council requirements, QDC guidelines and
all other relevant by laws and authorities. In particular refer Australian standards: ROOF DRAINAGE: All downpipes to be located as noted on the drawings and sizes
000.01 cover page D 07.12.21
ꞏ site preparation A.S. 3798 as scheduled. Allow to connect to in-ground storm water drains with 90mmØ UPVC at
010.00 reference images - sheet 01 C 07.12.21 ꞏ concrete construction A.S. 2870 1:100 minimum grade. Allow for I.O.'s at each change of direction and at 6000mm
010.01 reference images - sheet 02 C 07.12.21 ꞏ timber construction and details A.S. 1684.2 centres.
010.02 material palette C 07.12.21 ꞏ steelwork AS 4100, AS 1111 and A.S. 1112
020.00 external photos B 07.12.21 . termite protection BCA and A.S. 3660.1 SITE DISCHARGE: All stormwater and sanitary plumbing to be connected to existing
. artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680 council system in accordance with the requirements of the relevant local authority.
020.01 internal photos B 07.12.21
. fire safety BCA part 3.7
020.02 context view B 07.12.21 . smoke alarms BCA part 3.7.2 and A.S. 3786 WATER LINES: All hot water lines shall be fully insulated. All domestic hot water to
020.03 context view B 07.12.21 . glazing BCA part 3.6 and A.S. 1288 and A.S. 2047 basins, showers and baths to have maximum temperature of 50°C. Allow to supply
040.00 perspective images C 07.12.21 and install tempering valves where required, as nominated in the BCA and relevant
040.01 perspective images C 07.12.21 APPROVAL: No building work shall be undertaken prior to Building standards.
040.02 perspective images C 07.12.21 Approval by a registered Certifier.
STAIR AND BALUSTRADES: All stair and balustrades shall comply with part 3.9 of
040.03 perspective images C 07.12.21
CONSULTANTS: Drawings shall be read in conjunction with engineers drawings the BCA. Steps to be provided where fall from dwelling exceeds 190mm.
040.04 perspective images C 07.12.21 and computations. All structure to Engineers design. Hydraulic sizing and design
040.05 perspective images C 07.12.21 to hydraulic engineers requirements. All drawings to be co-ordinated with ALL PRODUCTS: To be installed to manufacturers requirements and to be in
040.06 perspective images B 07.12.21 consultant documentation prior to construction. accordance with manufacturers requirements for suitable exposure levels.
040.07 perspective images B 07.12.21
040.09 perspective images B 07.12.21 DIMENSIONS: Do not scale off drawings - use figured dimensions only. PROPRIETARY ITEMS: Identification of a proprietary item does not necessarily
Contractor shall verify all dimensions on site prior to construction. Any imply exclusive preference for the item so identified, but indicates the necessary
040.10 perspective images B 07.12.21
discrepancies or errors shall be referred to architect and client prior to installation properties of the item. If alternatives are proposed, submit proposed alternatives and
100.00 site plan E 07.12.21 / manufacture of any works. Confirm levels & RL's on site prior to commencement include samples, available technical information, reasons for proposed substitutions
100.01 site cover existing D 07.12.21 of work. and cost.
100.02 site cover proposed D 07.12.21
general construction notes
architectural drawing list
100.05 cost guide area D 07.12.21 SETOUT: Contractor to confirm exact siting and orientation prior to construction TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with silicone rubber.
100.06 area plans D 07.12.21 setout. All building setout and confirmation of setbacks and height to be carried Grout for wall: Epoxy based mildew resistant. Grout for floors: prepared grout to be
out by a Licensed Surveyor. No footing, or wall to encroach the title boundary. acid resistant. all wall tiles to have fcsubstrate.
200.00 lower level floor plan D 07.12.21
200.01 middle level floor plan D 07.12.21 TERMITE PROTECTION: Termite protection by means of termimesh s.s. mesh INTERNAL PAINTING: Unless noted otherwise paint system to be Dulux approved 3
200.02 upper level floor plan D 07.12.21 hysical barrier in accordance with A.S. 3660.1/2000 and installed in strict coat system - low sheen finish. Colours to be supplied by Architect during contract
200.03 roof plan D 07.12.21 accordance with current manufacturers specifications. and applied as per Dulux's recommendations and guidelines.
300.00 west elevation D 07.12.21
STRUCTURAL STEEL: Unless noted otherwise all exposed structuralsteel, JOINERY ITEMS SHALL INCLUDE: Manufactured casework items, including:
300.01 north elevation D 07.12.21
anchor bolts and other attachments shall be hot dip galvanised. A cold gal kitchen cabinets and cupboards; bathroom cabinets; robes.
300.02 east elevation D 07.12.21 painted finish shall be applied to any field welding to existing or new steelwork. All
300.03 south elevation D 07.12.21 steel work cast in concrete footings or slab shall have a bitumen finish applied to SANITARY COMPARTMENTS: Provide removable hinges to doors of sanitary
310.00 western boundary elevation D 07.12.21 full extent of cast in concrete steel. Check all dimensions on site prior to compartments to comply with BCA 3.8.3.3 and be readily removable from outside
310.01 northern boundary elevation D 07.12.21 fabrication of steelwork. unless there is a clear space of at least 1200mm b/w closet pan within the sanitary
310.02 eastern boundary elevation D 07.12.21 compartment and the nearest part of the doorway.
RETAINING WALLS: All retaining walls to structural engineers details. Provide
310.03 southern boundary elevation D 07.12.21
rubble backfill and agg drainage to all retaining walls. Builder to provide tanking APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and equipment
400.00 building section 01 D 07.12.21 where required. locations on site and with joiner. installation and final connection by the contractor.
400.01 building section 02 D 07.12.21
400.02 building section 03 D 07.12.21 SLAB & FOOTINGS: All slabs and footings to structural engineers details. A WEATHERSTRIPS: All external doors to contain weather stripping (type to be
400.03 building section 04 D 07.12.21 polyethylene moisture barrier shall be lapped 200mm and fully taped under any confirmed by Architect prior to manufacture)
habitable concrete slab and shall extend 100mm onto the perimeter footing.
DOCUMENTATION: The contractor shall carry out works in accordance with the
ARTICULATION JOINTS: Provide articulation joints to comply with "Cement and signed drawings and schedules and anything reasonable inferred, and with the
Concrete Association Construction Note TN9". Conditions of Contract, and in accordance with the directions and to the satisfaction
of the Architect, whose interpretation of the contract documents shall be final. The
EROSION CONTROLS: All building works to comply with local authorities Erosion drawings and specifications/schedules shall be considered complementary, and any
and sediment control standards. work and/or materials absent from one but present or implied in the other shall be
furnished as if they were present in both.
WATERPROOFING: All wet areas and walls to be waterproofed in accordance
with the BCA 3.8 & AS 3740. Builder to provide certificate of installation and FINAL CERTIFICATE: At completion of work, Builder to obtain and supply a
compliance. Certificate of Classification from a Building Certifier.
CONCEALMENT OF SERVICES: All services shall be concealed in walls or POOL: Contractor to confirm heights/depths/steps and plumbing/electrical
ducts. Where services are exposed they must be confirmed by the Designer on requirements and locations prior to construction
site prior to installation unless noted otherwise.
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0379
ac
ac
A
B
25.10.21
02.11.21
schematic design
schematic design ‐ revised
16 McAnally Drive, Ian & Susan Mackie contents SD 000.01 D SCALE 1:1
cover page
ac C 12.11.21 development application Sunshine beach
ac D 07.12.21 development application schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.