demolish existing garage demolish existing roof, create opening in wall. refer
roof, gutter and dps gutter and dps to struct eng and proposed
architectural drawings site boundary | 35.204 m approx | 94° 22' 15"
1 provide opening in foor to replace existing with new
accomodate new stair stair. refer to arch drawings
for new layout and location
demolish existing tiling to remove existing remove existing bar demolish existing roof
roof line over wall and floors and remove windows and doors
sanitaryware
2
existing bar
existing wir
existing existing roof
stair
existing bed 04
site boundary | 15.086 m approx | 4° 20' 40"
site boundary | 15.086 m approx | 184° 20' 40"
existing ensuite
roof line over
3
existing external
deck uncovered
4
demolish existing floor to
accomodate void
existing retreat existing external
remove existing
existing pwd deck covered floor tiles
remove existing balustrade
roof line over
demolish existing tiling to remove existing awning
existing pergola structure
wall and floors and remove
sanitaryware
create opening in wall. refer
to struct eng and proposed
architectural drawings
existing study existing roof
remove existing awning under
windows and doors
5
remove existing pergola
create opening in wall. refer demolish existing roof
structure and roof
to struct eng and proposed
hood under architectural drawings
roof line over
demolish existing roof
cimnery
site boundary | 35.204 m approx | 274° 22' 15"
1. demolition or removal of all structures to comply with AS2601.
demo notes
16 McAnally Drive
site details
2. remove all elements shown hatched
Sunshine Beach, QLD 4567 3. remove existing landscaping, and trees where noted
4. all services (power, gas, water, etc.) to be disconnected.
5. plumbing drains and sewer main to be sealed and capped.
Lot 85 on DP 81810 contractor to obtain plumbing approval from council
Site Area 531.09 sqm 6. demolish section of flooring and rip or replace joists as required to
provide setdown for new bathroom floor
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0379
ac
ac
A
B
28.10.21
02.11.21
schematic design ‐ areas + demo
schematic design ‐ revised
16 McAnally Drive, Ian & Susan Mackie demolition floor plans SD 180.02 D SCALE As
indicated
demolition upper level floor plan
ac C 12.11.21 development application Sunshine beach
ac D 07.12.21 development application schematic design
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
1:1 @ A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.