Skip to the record
Search everything, all in one place.

Original source · versioned page text

Attachment 5 - Servicability Report.pdf

of 61
NOOSA CITY PLAN - WATER QUALITY AND DRAINAGE CODE                                                                                                      Job Ref No.: 22159
Performance Outcomes and Acceptable Solution

Table 9.4.8.3 – CRITERIA FOR ASSESSMENT

PO7                                        AO7.1                                             PO
Water quality treatment systems use        Water quality treatment systems are                    Water quality treatment systems are designed to be
natural processes and materials,           designed to be integrated into the                     integrated into the landscape consistent with the
whenever possible, and are integrated      landscape consistent with the technical                technical design guideline.
into development to enhance                design guideline published by Healthy Land
biodiversity and landscape benefits.       and Water Water by Design for the feature.             Refer to Bornhorst and Ward SBSMP report for
                                           (eg. For Bioretention Basins: Bioretention             details.
                                           Technical Design Guidelines (October 2014)
                                           and for Wetland Systems the Wetland
                                           Technical Design Guideline (May 2017).

                                           AO8.1
PO8                                        Detailed life cycle costing is provided for the
Water quality treatment infrastructure     entire treatment train system including                Water quality treatment systems are dedicated as
to be dedicated as public assets are       replacement costs of asset parts.                      public assets and proven to be suitable for its use and
proven to be suitable for its use and of                                                          of a cost effective and efficient standard.
a cost effective and efficient standard.   AO8.2
                                           Treatment systems dedicated as public             PO   Refer to Bornhorst and Ward SBSMP report for
                                           assets are designed to minimise                        details.
                                           maintenance, renewal and adaptation costs
                                           and the requirement for specialised
                                           equipment, material or maintenance
                                           techniques.

                                           AO8.3
                                           Vegetated stormwater management systems
                                           to be dedicated as public assets are
                                           established and maintained during the
                                           maintenance period to ensure optimal
                                           vegetated growth and that the functional
                                           elements of the system achieve the design
                                           function at the end of the maintenance
                                           period
1.  Solution: PO = Performance Outcome
                A/O = Acceptable Outcome
                N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville

Log in to download the original (Attachment 5 - Servicability Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.