Council archive · source document
Council Lake Weyba Information Response 28-10-13_FINAL · MCU12/0208
iii. Traffic Impact Assessment Report
iv. Urban Design Report
The changes to the abovementioned reports has resulted in the following changes being made:
The amended Engineering Report included in Attachment 8 also addresses the proposed road network with
regards to trunk road alignment (sections 3.1) and existing road upgrades (section 3.3) and the fundamental
design principles implemented to ensure the protection of the environment.
The removal of the road within Hollet Road reserve to the west of Walter Hay Drive and replacement with an
internal driveway to precincts J, K & L has reduced significantly the amount of vegetation to be removed
including old growth trees in the road reserve. The location of the internal driveway is along an existing gravel
track which is largely cleared of vegetation.
The relocation of the collector road within Hollet Road reserve to the east of Walter Hay Drive and relocation to
the internal alignment to the south of precincts F & G, has also greatly reduced the amount of vegetation to be
removed. Hollet Road East will now contain only a 4m wide bushfire emergency, access track and cycleway
which has been located to reduce the impact on mature and hollow bearing trees.
Issue
Expansion to Noosa National Park
Information Required
23 Provide evidence of the Department of National Parks, Recreation, Sport and Racing, Qld Parks
and Wildlife Service commitment to the provision of access and associated capital works and
resulting ongoing maintenance for the active use proposed expanded Noosa National Park, as
anticipated by the application material.
Response:
Please refer to the amended Economic Needs Report within Attachment 5 This report has undertaken further
analysis in response to Council’s request for further information and concludes the following;
Section 3.3.2 Send Site on pages 17 and 18 of the Needs Assessment states that in conjunction with the transfer
of the 139.5 Ha of Send Land to be transferred to the State for inclusion into the Noosa National Park, the
developers propose to develop sealed access roads along Hollett and Tidswell Roads and new cycle access paths
from Walter Hay Drive and Noosa-Eumundi Road. As such, this provides the potential to unlock the major
component of Lake Weyba and provide public access to a greater range of National Park.
Furthermore the Department of National Parks, Recreation, Sport and Racing, Qld Parks and Wildlife Service
have provided written confirmation, in a letter dated 2 August 2013, that they support the proposal in terms of
the provision of access to land transferred to the State for incorporation into the National Park estate for the
purposes of undertaking environmental enhancement and offset works. Please refer to Attachment 18 for the
subject letter from the Department of National Parks, Recreation, Sport and Racing, Qld Parks and Wildlife
Service detailing the above.
24 Provide evidence of how the proposed economic benefit of the expanded Noosa National Park
can be achieved when all / any park embellishments and maintenance costs are dependent upon an
external party (NPWS) which is not included in this application.
Response:
Please refer to the amended Economic Needs Report within Attachment 5 This report has undertaken further
analysis in response to Council’s request for further information and concludes the following;
21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.