Skip to the record
The only place to find full transcripts.

Council archive · source document

Council Lake Weyba Information Response 28-10-13_FINAL · MCU12/0208

of 64

Text shows just the words. Original shows the document exactly as it was published.

31      Private lots adjoin retained bushland in many areas throughout the proposed development.
        Demonstrate how this is a superior outcome to perimeter road interfaces particularly in achieving
        bushfire setbacks, managing urban runoff, private (yard) encroachment and restricting public and
        maintenance access.

Response:

Please refer to the revised Ecological Report included as Attachment 7. This report concludes the following;

The proposed Noosa on Weyba development is not a standard urban residential development and is based on a
Body Corporate model and as such many of the issues typically associated with having private lots fronting onto
open space /conservation areas will be avoided (i.e. extension of back yards, dumping of refuse, garden
escapees etc). Provision has also been made for appropriate building setbacks adjacent to all areas of potentially
hazardous vegetation and fire-trails for bushfire management purposes.

Having residential lots fronting onto open space conservation reserves in some areas also provides an
opportunity for a “soft” edge to these conservation areas as opposed to a “hard” edge that would be associated
with roadways. In areas where lots are not separated from adjacent Open Space Conservation areas, the
proposed restrictions on fencing and keeping of domestic pets within the residential lots should effectively
increase the availability of habitat for native fauna inhabiting the adjoining Open Space Conservation reserves.

Issue
Affordability of the proposed Environment Levy

Information Required

32      Provide an estimate of the proposed Environmental Levy cost to future property owners given
        this cost impost will be on top of existing Council Rates and various levies, water rates and other Body
        Corporate Charges. It is assumed from reading the Noosa on Weyba documentation that the
        Environment Levy will pay for fauna fences and associated maintenance, wildlife road crossings,
        revegetation/offset plantings and maintenance, bushfire management, feral animal control,
        weed control and the maintenance of urban park, Lake Weyba buffer, wetland/ stormwater
        treatment, roadside verges and noise buffers.

Response:

Please refer to Attachment 4 for an estimate of the proposed Body Corporate Levy cost to future property
owners within the Community Title Report. The attached Body Corporate Levy budget within the Community
Title Report shows estimates for between 800-1000 subsidiary lots and estimates the total cost to future
property owners as indicated in the below provided table:


Initial Estimate Noosa on Weyba Principal Scheme Budget




                                                     25

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Lake Weyba Information Response 28-10-13_FINAL.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.