Skip to the record
For the highest quality transcripts.

Council archive · source document

Council Lake Weyba Information Response 28-10-13_FINAL · MCU12/0208

of 64

Text shows just the words. Original shows the document exactly as it was published.

Response:

Please note the current proposal relates to a Preliminary Approval and as such the road alignments within each
precinct will be confirmed as part of further reconfiguration approvals. To assist Council’s review of the potential
road alignments within each precinct please refer to Attachment 3 which includes the A1 Concept Master Plan. It is
anticipated that any further road design could be conditioned by Council to comply with Specific Outcome 012 of
the Natural Hazards and Natural Resources Overlay Code.


    SERVICES

    Issue
    The development requires the upgrade of the Noosa Heads Sewage Treatment Plan.

    Information Required

    61     Provide details of the nature and extent of upgrade works required to the Noosa Heads Sewage
    Treatment Plant to cater for the development.

Response:

Please refer to the attached revised Civil Engineering Report from Cardno included within Attachment 8 which
addresses the future works required to the Noosa Heads Sewage Treatment Plant. Further details are also included
in Section 6.4 and Appendix C and Appendix F of the amended Water Supply and Sewerage Analysis (see
Attachment 15).

    Issue
    The alignment of proposed water mains and sewer rising mains are located within private property, Parks
    and proposed open space areas.

    Information Required

    62      Provide additional detail on the alignment of the proposed water mains and sewer rising mains.
            The detail must demonstrate that the works are achievable and include:
                 (a)     The consent of land owners that are affected by the works
                 (b)     The delineation between private and public infrastructure

    Response:

    R62(a) Please refer to the attached revised Civil Engineering Report from Cardno included within Attachment 8
    which provides additional detail on the alignment of the proposed sewer and water reticulation in section 5.1
    and 6.1 respectively. Final alignments of proposed water and sewer mains will be located in road easements
    and public land to allow access. The alignment of the proposed DN150 rising main from the site will cross Noosa
    Civic land. Although it is noted that the development can be completed without any landowners consent if
    required, negotiations with Noosa Civic representatives is ongoing in regard to a permit to construct the rising
    main within their car park.

    R62(b) Refer to section 5.3 and 6.2 and sketch SK702 of the amended Engineering Report (see Attachment
    8)- Following discussions with Unitywater and Cardno’s experience on multiple developments of a similar
    nature, all infrastructure proposed for the development will be transferred to Unitywater in the first instance.
    Ongoing consultation with Unitywater in regard to the ownership of assets will result in an Infrastructure
    agreement which could be conditioned as part of any approval documentation. .

    Issue
    The alignment of proposed water mains and sewer rising mains are located within common property, Parks

                                                         46

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Lake Weyba Information Response 28-10-13_FINAL.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.