Council Lake Weyba Information Response 28-10-13_FINAL · MCU12/0208
Section 3.6 of the TIA provides no traffic engineering assessment of the proposed internal road
network. It is noted that these details are not provided in either the TIA or the civil engineering
reports.
Information Required
72 Provide the following details:
(a) Justification for proposed adoption of cross sections and alignments contrary to Council‘s normal
standards,
(b) Details of intersections and speed control devices, and
(c) Speed control mechanisms which adequately address the issues associated with long journey paths
purported to occur at low operating speeds for environmental reasons. As a general rule, it cannot be
reasonably expected that motorists will adopt low speeds (40 km/hour) for more than 60 to 90 seconds.
Much longer low speed routes are currently proposed.
Response:
R72(a) Please refer to Section 4.2 of the amended Traffic Assessment Report for justification of the proposed
adoption of cross sections and alignments which do not necessarily replicate the normal standards as those
stipulated by Council.
R72(b) Please refer to Sections 4.4 and 4.6 of the of the amended Traffic Assessment Report for details regarding
proposed intersections and speed control devices to be implemented through the proposed road network.
R72 (c) Please refer to Section 4.5 and 4.6 of the amended Traffic Assessment Report for further information
regarding speed control mechanisms including the proposed location of round-abouts and T-junctions. Please note
that although more detail regarding proposed internal road network will be provided as part of future Development
Applications, they will be based upon the road network and development proposals envisage for the proposed
intersections, shown in Figure 4-3 of the amended Traffic Assessment Report.
Issue
Section 7.1 of the Planning Report describes what are perceived as a number of grounds, some of which
may be based on traffic engineering considerations.
Information Required
73 Clarify which of the nominated grounds are based on traffic engineering considerations,
together with any additional information in explanation considered necessary.
Response:
The following Noosa on Weyba benefits have been based or partially based on traffic considerations;
The proposed roundabout on Walter Hay Drive will achieve the following:
(a) slow traffic speed down to 60kmph for a section of the road which will lower the incidents of ‘road
kill’ of wildlife.
(b) Create an alternate access/ egress for residents in Hollett Road
(c) Lower the traffic speed on Walter Hay Drive which will in turn lower the road noise impact on
Hollett Road residents
The project will deliver sealed roads along the current dirt tracks in the Tidswell and part of Hollett Roads road
reserves at no cost to the public
Tidswell Road will be constructed to a ‘flood free’ standard which will provide existing residents along this road
with flood free access
50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Lake Weyba Information Response 28-10-13_FINALRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.