     peak flows are not increased. It should be noted that the attenuation that will be provided by the bio-
     retention basins and rainwater tanks has not been included in the flooding analysis. These will provide
     some additional attenuation, particularly for the minor storm events. Therefore the developed case peak
     flows that have been modelled are a conservative assumption. Appropriate erosion and scour control
     measures will be required on all outlets and culvert crossings.



            Lake Weyba Water Quality Objectives (WQOs) are provided and it‘s further mentioned
             that Healthy Waterways undertakes regular monitoring under an Ecosystem Health Monitoring
             Program. It is further claimed in relation to this that MUSIC modelling (for the WSUD)
             background concentrations can be higher in some instances than the WQOs (eg background
             Total P concentration in bio-retention systems is assumed to be 130 µg/L, >WQO concentration)
             and therefore concentration based WQOs cannot be determined through MUSIC modelling.
             From this, the consultant recommends that the results from water quality monitoring carried out
             by the Healthy Waterways be used to determine whether there is an impact from the
             development.

             Whilst these results can be used, the applicant will need to be responsible by implementing an
             appropriately tailored water monitoring program as the Healthy Waterways monitoring may
             not suit the specifics of the proposal and cannot be relied on to continue for the life of the
             development especially where a State Government could either halt or reduce funding for such
             programs.

     Response:

     Section 5.3 of the amended Stormwater Management Plan addresses this item (see Attachment 16). A
     monitoring program has been proposed for the site so that the existing water quality parameters can be
     defined, and the effectiveness of the proposed stormwater treatment devices can be established.

Information Required

90       Provide information including revised MUSIC modelling results, amended plans and all relevant
         details that demonstrate the above issues have been addressed.

     Response:

     Section 8.3 of the Stormwater Management Plan amended addresses this item.

     The MUSIC analysis was re-run to determine the increase in bio-retention treatment size that would be
     required to compensate for the loss of the rainwater tanks and still meet the stormwater quality
     objectives. As the proposed development has targeted a higher level of treatment than typically required,
     the increase required was not as significant as that necessary for similar developments. It was found that if
     the bio- retention filter media area in the basins and swales was increased by 25 percent then the WQOs
     could be met. The exception was for areas F and G, where a 50 percent increase in the bio-retention
     gardens was required. It would also be necessary to drain the roof areas to the road, rather than directly to
     underground drainage. The resultant load removal for the combined site was 83% for TSS, 60% for TP and
     48% for TN.

      While the water quality objectives can be met if the bio-retention areas are increased, it is still
     recommended that rainwater tanks be adopted on site. The proposed development aims to promote the
     use of ecologically sensitive design and the use of rainwater tanks plays an important role in this regard. As
     this will be a Body Corporate development there will be more control available on the development
     conditions for each lot. The use of rainwater tanks will significantly reduce the water demand of the site
     (by up to 53%), reduce stormwater flows being discharged off-site and allow the remaining treatment
     devices to be better target utilised treating ground and road runoff, rather than relatively clean roof runoff.

                                                      60

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Lake Weyba Information Response 28-10-13_FINAL.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.