Council archive · source document
OPW13/0859 Application for permit to damage vegetation 8 Bunya Lane Black Mountain
cu:::;.
5. Are there any current approvals (e.g.a preliminary approval) associated with this application? (Non-
mandatory requirement.) ,
D No D Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is owner’s consent required for this application? (Refer to notes at the end of this form for more information.)
D No
Yes-complete either Table G, Table H or Table I as applicable
I Table G
Name of ownerls of the land
Nt c#eu-!rS ...e... MA-~A 6’~. _i..
I/We, the above-mentioned ownerls of the land, ~ent to the making of this application.
Signature of ownerls of the land
A ~ f?r -
t
Date
/~ "yO/It:> /J~
~ "- " r
Table H
Name of ownerls of the land
D The owner’s written consent is attached or will be provided separately to the assessment manager
Table I
Name of ownerls of the land
D By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
7. Does the applic tion involve a state resource? (E.g. the application involves taking water or qUarry material, or
interfering with the flow of water. Refer to the notes at the end of this form for more information) (Non-mandatory
req uirement.)
~ No D Not identified whether or D Yes-complete Table J
not the application
involves a State
resource
Table J
Nature of state-owned resource (if identified)
4 IDAS form 1-Applcaton dela s
Version 2.031 Marcf12013
we ** I." 1M’ 11111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW13/0859 Application for permit to damage vegetation 8 Bunya Lane Black MountainRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.