Original source · versioned page text
51901.3614.03, 51901.3786.04, 51992.479.03, 51994.1048.03, 51994.1249.03, MCU13/0081.03 – MINOR CHANGE TO DEVELOPMENT APPROVALS FOR 47 MULTIPLE DWELLINGS, ENTERTAINMENT & DINING - TYPE 1 FOOD & BEVERAGE AND RETAIL BUSINESS - TYPE 1 LOCAL AND TYPE 2 SHOP & SALON AT ‘NETANYA’ - 71 HASTINGS STREET NOOSA HEADS DESCRIBED AS LOT 0 ON BUP101500 · ATTACHMENT 3 – (51901.3614.03 51901.3614, 51901.3786.04, 51992.479.03, 51994.1048.03, 51994.1249.03, MCU13-0081.03) – Proposal Plans
Plans and drawings: the text below has words only, no drawings.
Very large file (10.9 MB): may take a few minutes to open.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
.B. lum
tail a l o n
de c t u r b e c
, T co
C.
fut h i n s i p e t o
REV DESCRIPTION DRN DATE
ure t r u
w i t wnp
A Minor
MCU DA Change
Issue- Stage 1 & 2 Works MS 10.12.21
25.02.20
EX-DP
Do
RF-A 1995 EX-DP TI N-DP B Site
MCUCover Revisions
DA Issue MS 02.02.22
02.03.20
Gate 1660 200 TOW 2.700 approx.
up
SW
N-RWO Gravel Courtyard C Minor
MCU DA Change
Issue- Stage 1 & 2 Works MS 08.04.22
06.03.20
approx.
te
Existing 1
1975
AC
D Client Change
Minor Revisions
- Stage 1 & 2 Works MS
NN 14.04.20
29.11.22
Ga
New
Office
up
Ne2 3
BAL-ST1
1 TL-12
landsc. Lift Core 02 GPT Sta w 4 E MCU DA MS 05.08.20
EX-
planter
Plant
BAL-ST3
10 2 TL-01 up ir
DP Information Response
BAL-ST3
Glass
dn
1 ES
9 Bricks KIN EX-COL EX-COL TL-12 F GIA Issue MS 07.04.21
BAL-ST3
3
WT 1 2 TI
8 under AC AC G GIA Variations MS 24.06.21
4
3 EX-DP AC
7 H GIA Variations MS 11.08.21
EX-COL 5 dn
4 dn
6 I Minor Change Revision MS 21.09.21
Screen
SC-18 BAL-ST7
BAL-ST7
5 1050 TI
ES
J Minor Change - Stage 1 & 2 Works MS 10.12.21
up TL-01
K Minor Change - Stage 1 & 2 Works MS 08.04.22
1,995
Existing card reader Provide 50 - 75 mm
f u t nd t e d
1365
d e ate
to be retained. up contrasting nosing
s
1000 min.
t o en a r c o a
tail
g
strip to all stair treads
Gate
e
Stormwater Grate 750
Move 2 x RHS to GP TL-07 as per AS1428.1
sc o w d
Single handrail &
ure
3 eq. goings
FFL 2.170 end of block wall, Under TI Existing Tenancies EX-HYD non-slip &
ium w p
re
fixed to wall with 4 3 2 1 New powdercoated luminance contrast EX-HYD 2 no.
(no works)
00
12mm wall plate 2 no.
min N e
aluminium gate and nosing required. RHS
35
RHS
to eng. detail. 2340 1,250 screen GL0-05. Refer
190
to CD70.20 for details
alu
5.0 m2
4.0 m2
D
fall
00
30
0Ø
1,5
Co
nc
.C
2,1 Ne
EX-DP Planter 50
olu
mn EX-HYD ste w 1:
p r 10
am New
p FFL 2.625
4.5 m2 landscaped
FFL 2.765 1,0
nts
Tenancy 5 00 planter
fro
(no internal works)
op
2 no.
sh
D
RHS Existing landscaping:
w
EX-COL
Ne
Total area = 34.5m2
150 x 50 hardwood Tenancy 4 D
30
timber batten screen 0Ø
(no internal works)
@ high level.
Co
nc
.C
olu
Blue hatched area indicates external New landscaping:
exclusive use area on Tenancy 5 title. New timber Provide new PWD-
Total area = 37.5m2
mn
deck compliant access to
Provide 2 no. new
powdercoated raised timber deck
aluminium RHS
posts either side of
existing SHS column EX-COL Tenancy 3 New shopfronts
(no internal works) Generally throughout:
FFL 2.800
2 no. - New render and paint finish to all external walls
RHS Line of new feature roof
awning over shown dotted - New anodised aluminium (25µm coating)
30
0Ø
Co
sliding doors to terraces / balconies
nc
.C
olu
mn
FFL 2.749 - New anodised aluminium (25µm coating) windows
New shopfronts - New frameless glass balustrade with
Provide new step FFL 2.765
ramp as required Framed Glass Wall Timber New anodised aluminium (25µm coating) uprights
Deck landscaping
- New tiles to walkways, terraces and balconies
Timber New timber deck New landscaping with
Deck
FFL 2.763 reconfigured stone-faced
EX-COL walls to match existing
FFL 2.740
Provide new step 150 x 50mm HWD
Timber
Deck ramp as required timber batten screen
30
0Ø
Co
New timber deck TI Select new timber decking
Block Wall
nc
.C 2 no. to front of tenancies to
olu
mn
New powdercoated
RHS match existing
FFL 2.740 Facade
aluminium balustrade and dn 2
Rock Wall
2 no.
s
GP
ord
handrail, Type BAL-ST5 RHS 1
rec
Under
BAL-ST5
D
BY
Timber up
New timber deck TI
dD
Deck
an
10.5 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.