to ceiling height of 2.7 metres; ● Provides a floor to ceiling
and height of 2.65m on the
10. enables efficient upper level and 2.9m on the
operation and use of the building. lower level;
● Provides operable windows
Editor's Note: Refer to Figure to enable occupants to
9.4.6.4. control impacts of the
weather as necessary.
Item 8
Please demonstrate the design vehicle can still manoeuvre onsite and leave in a forward
gear with a second vehicle in each garage and without encroaching into the front
landscaping or alternatively reposition the footprint of the dwelling to allow more space for
manoeuvring at the front.
Response: Please refer to the Engineering RFI Response Letter and revised Engineering Plans prepared
by Westera Partners.
Item 9
Please demonstrate the development and filling of the site will not create off-site
stormwater impacts (ponding or diversion of overland flow paths onto adjoining properties)
and/or include appropriate stormwater drainage infrastructure to convey stormwater from
adjoining properties, through the site and to the lawful point of discharge.
Response: Please refer to the Engineering RFI Response Letter and revised Engineering Plans prepared
by Westera Partners.
Item 10
Please provide a preliminary earthworks plan that indicates the volume of fill required for
the site and where necessary (if fill volume triggers the requirement against the Acid Sulfate
Soil Overlay Code), provide an Acid Sulfate Soil Management Plan prepared by an RPEQ that
provides recommendations to address the potential risks associated with the fill works.
Response: Please refer to the Engineering RFI Response Letter and revised Engineering Plans prepared
by Westera Partners.
Item 11
With existing features restricting the width of the verge area available for a 3.0m wide
footpath, please amend the engineering plan(s) to include a 2.0m wide footpath across the
frontage of the development.
Response: Please refer to the Engineering RFI Response Letter and revised Engineering Plans prepared
by Westera Partners.
For the reasons outlined above, we consider the proposed plan revisions acceptable and request that
Council proceed to issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact me directly.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.