ingeniir
Detailed Erosion and Sediment Control design and plans should be documented by a suitably experienced
professional in conjunction with any application, or prior to commencing with the Operational Works
associated with the proposed development on site.
5.2 Operational Phase
The site has an allotment area of 1012m2 and as such does not trigger local or state requirements for
operational treatment objectives for stormwater quality.
The above ground rainwater retention tanks will provide opportunity for nutrient retention on-site and it is
proposed that the tanks will be used for landscape irrigation and other external uses. In context of the scale
of the development the re-use of rainwater on site is considered an acceptable outcome.
6. STORMWATER QUANTITY
The development is proposed to incorporate stormwater detention to mitigate the increase in peak discharge
from the site.
The Bureau of Meteorology 2016 IFD service has been used for all analysis in this report.
A Rational Method estimation of the stormwater discharge has been used to estimate the pre-developed
runoff performance of the site. The detention analysis has been proportioned to match or improve on the
pre-developed flows as determined by the Rational Method. A summary of the Rational Method discharge
estimations are presented in Table 1.
DISCHARGE ESTIMATES ( m 3 / s)
Pre-Developed Flow Rates Developed Flow Rates
AEP Rational Method WBNM Difference Rational Method
63.20% 0.02 0.021 0.001 (105%) 0.022
39.35% 0.027 0.029 0.002 (107%) 0.029
18.14% 0.038 0.039 0.001 (103%) 0.04
10% 0.046 0.049 0.003 (107%) 0.048
5% 0.054 0.06 0.006 (111%) 0.058
2% 0.07 0.067 -0.003 (96%) 0.074
1% 0.08 0.074 -0.006 (93%) 0.085
Table 1: Rational Method discharge estimation for the site
A WBNM 2017 (v001) hydrology model has been used to determine the detention volume required to
maintain or improve on the current flow characteristics of the site. Temporal patterns from ARR2016 have
been used in the analysis, along with reference parameters from the ARR Data Hub.
The WBNM pre-developed model was calibrated to achieve an acceptable alignment with the existing site
Rational Method estimates for whole of site discharge.
Ingeniir Pty Ltd | 215101-SMP-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 6 | 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.