T000063 - 4F.2 - Peregian Beach Fire Tech Lab Drawings - Option 1
rev date issued details
B 07.06.21 MS Preliminary Sketch Design
Sketch Design
legend - proposed scope of work
Class 9b - public halls / function rooms
- building sanitary requirements.
content pod
-acoustic rated internal walls
-carpet floor, plasterboard ceiling 25,000 useable floorspace = 408m2
circulation space = 82m2
5,000 5,000 15,000
meeting room
-carpet floor, plasterboard walls + -Types of use- space
ceiling G F E D C B A
-glazing strip windows to match
existing windows on south east
5,000 5,000 5,000 5,000 5,000 2,400
theatre (1/1m2)……………….170m2
wall, refer to south east elevation double glazed sliding doors to office (1/10m2)…………………170m2
assist with acoustic store (1/30m2)…………………35m2
big data pod upgrade existing requirements and reduce
-remove all existing joinery,
setback
thermal heat load
5,930
-new carpet
-new paint A total design occupancy = 187
3.1
-remove amenities
-partition dividing walls 94 males / 94 females
co lab pod new proposed deck
-new build -Total no. sanitary requirements
-rentable office space
-retractable seating
male= 2 wc's + 2ur. + 2 wb's
flexible space if required 57 retractable seats as
-new build per Interseat details flexible
-rentable office space store stage + Co Lab pod retractable space female= 4 wc's + 2 wb's
8,045
-partition dividing wall to co lab pod projector seating (if required)
17.65 m2 screen 132.90 m2
27.10 m2 landscaping
AC
new store/ bar
-new joinery, cupboards +
benchtops
-new commercial standard floor AC
finish
-new paint
amenities new timber decking linkway
landscape breakout
3,610
-new fitout 24.05 m2
2,580 seating space landscaping/ garden
covered linkway entry/ neighbouring setback
breakout space 2
1
-new/ existing decking property
-new roof
new acoustic rated
Proposed Digital Hub internal walls
renovation
- new walls, doors, external window content main big data pod
7,490
7,490
- New internal finishes pod function 107.80 m2
2
31.60 m entry
refer to architectural drawings for
partition walls 47.45 m2
further detail.
dividing spaces
remove and restructure bracing
truss walls above
2
new double door to
2,400
breezeway entry 2
meeting room 34.69 m2
meeting 3
6,180
room entry 1
29.50 m 2 bar/ female male
3,780
store 14.45 m2 14.13 m2
2
5.25 m
pwd
revitalise existing timber deck 18.15 m2
5.25 m2
new timber deck ramp as 1:14 4
per AS1428 ramp landscaping/ garden
884
sandstone seating
dashed line denotes new up
roofline above primary entry
covered & way finding
covered linkway to
linkway
Digi Hub
*note - structure
All structural elements including
footings, walls and framing to be in
accordance with engineers design and
detail
a: suite 6, 8 kingfisher drive, peregian beach, qld 4573
p: (07) 5471 3033 Peregian Beach Community House - Fire Tech Lab Scale 1:200
sparks architects www.sparksarchitects.com
255 David Low Way, Peregian Beach Noosa Shire Council 183 MS Peregian Beach Fire Tech Lab - Ground Floor Plan SK 1.3 n
sparks architects pty. ltd. abn 89 124 611 721
qld architect's registration No. 3974 project client job no. drawn drawing dwg no.
GSPublisherVersion 565.9.54.75
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.