T000063 - 4F.2 - Peregian Beach Fire Tech Lab Drawings - Option 1

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                           rev  date   issued details
                                                                                                                                                                                                                                                                                                                                                                  Sketch Design




                                                                                                                           7,490




                                                                                                                                                                                                                                                                                                                            7,490
                                                                                                                                                                                                            B 07.06.21 MS Preliminary Sketch Design

                                                                          partition walls
                   legend - proposed scope of work                        dividing spaces
                                                                          remove and restructure bracing
                                 content pod                              truss walls above
                                                                                                                                                                                                                                                                                                                                    2
                                 -acoustic rated internal walls
                                                                          new double door to




                                                                                                                                                                                                                                                                                                                            2,400
                                 -carpet floor, plasterboard ceiling                                                                                                                                                                 breezeway
                                                                          meeting room                                                                                                                                                                                                 entry 2
                                                                                                                                                                                                                                       34.69 m2

                                 meeting room                                                                                                                    meeting                                                                                                                                                            3




                                                                                                                           6,180
                                 -carpet floor, plasterboard walls +                                                                                              room                      entry 1
                                 ceiling                                                                                                                                 2
                                                                                                                                                                   29.50 m                                  bar/                     female                          male




                                                                                                                                                                                                                                                                                                                            3,780
                                                                                                                                                                                                           store                     14.45 m2                        14.13 m2
                                 -glazing strip windows to match
                                 existing windows on south east                                                                                                                                                                                         5.25 m2
                                                                                                                                                                                                                                                      pwd
                                                                          revitalise existing timber deck                                                                                                        2
                                                                                                                                                                                                           18.15 m
                                 wall, refer to south east elevation                                                                                                                                                                                  5.25 m2


                                 big data pod upgrade existing            new timber deck ramp as                                                                                            1:14                                                                                                                                   4
                                 -remove all existing joinery,            per AS1428                                                                                                         ramp                              landscaping/ garden




                                                                                                                           884
                                 -new carpet                                                                                                                                                                                    sandstone seating
                                 -new paint
                                 -remove amenities                        dashed line denotes new                                                                                              up
                                                                          roofline above                                                                                                                                                                                          primary entry
                                 -partition dividing walls                                                                                                                                  covered                                                                               & way finding
                                                                          covered linkway to
                                 co lab pod new proposed                                                                                                                                    linkway
                                                                          Digi Hub
                                 -new build
                                 -rentable office space
                                 -retractable seating

                                 flexible space if required
                                 -new build
                                 -rentable office space
                                 -partition dividing wall to co lab pod
                                                                                                                                                                                           exist.covered                            exist.
                                                                                                                                                                                             outdoors                          shared co-worker
                                 new store/ bar                                                                                                                                                                                     space
                                 -new joinery, cupboards +
                                 benchtops
                                 -new commercial standard floor
                                 finish
                                 -new paint                                                                                                                                                          A
                                                                                                                                                                                                    3.1
                                 amenities
                                 -new fitout                                                                                                                                                                         exist. amenities
                                 covered linkway entry/                                                                                                                                                                                                                     exist. pitch
                                 breakout space                                                                                                                                                                                                                              meeting
                                 -new/ existing decking
                                 -new roof

                                 Proposed Digital Hub                                                                                                                                                                                               exist. foyer/                new                     new acoustic wall, door and
                                                                                                                                                                                                              exist.entry
                                 renovation                                                                                                                                                                                                           gallery                   meeting                  external window to match
                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                                                                                 6.29 m                  existing
                                 - new walls, doors, external window
                                 - New internal finishes
                   refer to architectural drawings for
                   further detail.                                                                                                                                                                                                                                          exist. pitch
                                                                                                                                                                                                                                                                             meeting


                                                                                                                                                                             exist. cafe
                                                                                                                                                                                                                                                                                                         new acoustic wall and doors
                                                                                                                                                                                                                                                                                                         to create secondary shared co-
                                                                                                                                                                                                                                                                                                         worker space
                                                                                                                                                                                                                                                     proposed
                                                                                                                                                                                                                                                  shared co-worker
                                                                                                                                                                                                                                                       space




                   *note - structure


                   All structural elements including
                   footings, walls and framing to be in
                   accordance with engineers design and
                   detail




                                                                                                    a: suite 6, 8 kingfisher drive, peregian beach, qld 4573
                                                                                                    p: (07) 5471 3033                                          Peregian Beach Community House - Fire Tech Lab                                                                                                Scale 1:200

                     sparks architects                                                              www.sparksarchitects.com
                                                                                                                                                               255 David Low Way, Peregian Beach                            Noosa Shire Council                                  183             MS          Peregian Beach Digital Hub - Ground Floor Plan   SK 1.5     n
                                                                                                    sparks architects pty. ltd. abn 89 124 611 721
                                                                                                    qld architect's registration No. 3974                      project                                                      client                                               job no.         drawn       drawing                                          dwg no.
GSPublisherVersion 565.9.54.75
Log in to download the original file

T000063 - 4F.2 - Peregian Beach Fire Tech Lab Drawings - Option 1.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.