Appendix 5. Geotechnical Engineering Report [As Published] · 132007.2399

of 68

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Golder Associates Pty Ltd

A.B.N. 64 006 107 857 n foes

Unit 1, Dalton Centre, Newspaper Place . (Z |= Golder
Maroochydore, Qld 4558 Australia | 4 “Associates
(PO Box 5569, Maroochydore BC, Qld 4558 Australia)

Telephone +61-7 5443 3511

Fox +61-7 5443 6645
www.goldercom

REPORT ON

PRELIMINARY ACID SULFATE SOIL
AND GEOTECHNICAL INVESTIGATION
PROPOSED RESIDENTIAL SUBDIVISION
PRECINCT J
NOOSA SPRINGS, QUEENSLAND

Submitted to:

Starco Developments Pty Ltd
PO Box 1184
Noosa Heads QLD 4567

DISTRIBUTION:

2 Copies ~-Starco Developments Pty Ltd —_1 hard copy (bound); i electronic copy (PDF)
Attention: Mr Alan Starkey
1 Copy ~ Golder Associates Pty Ltd

 

October 2007 077682076(AB)
“
Hewitt
EMPLOYERS OFFICES IN ADELAIDE, BRISBANE, CAIRNS, MAROOCHYDORE, MELBOURNE, PERTH, SYDNEY, TOWNSVILLE
INDONESIA, NEW CALEDONIA, NEW ZEALAND, PEOPLE'S REPUBLIC OF CHINA, PHILIPPINES, SINGAPORE ssecounower esa

"2006/07 OFFICES ACROSS AFRICA, ASIA, AUSTRALASIA, EUROPE, NORTH AMERICA, SOUTH AMERICA
Full text of the other 67 pages

Page 2

October 2007                                     -i-                            077682076(AB)


                                 EXECUTIVE SUMMARY

Starco Developments Pty Ltd has commissioned Golder Associates Pty Ltd (Golder) to
conduct a preliminary ASS and geotechnical investigation for a proposed residential
development described as Precinct J at Noosa Springs. The proposed works include a 27 lot
residential subdivision and realignment of the 18th hole golf tees to the south-west. This
report presents the results of the investigation together with preliminary comments and advice
regarding ASS and geotechnical matters.

A preliminary investigation was conducted because details regarding earthworks and building
development were not known at the time of reporting.

The site covers an area of about 3.06 ha, mostly comprising gently sloping ground ranging in
elevation from about RL 9 m (east) to RL 1.5 m (west, south-west). The site mostly
comprises a palm plantation surrounded by the Noosa Springs Golf Course.

The investigation comprised eight boreholes drilled to depths of between 3 m and 6 m, with a
number of samples recovered from two of the boreholes used for ASS testing.

Following the field and laboratory work, the results were used to assess the extent of ASS,
together with measures for environmental management during construction, and a number of
geotechnical issues. Summarised below are the investigation findings and recommendations:

•   The western part of the site is underlain by mostly medium dense to dense sands or denser
    indurated sands (‘coffee rock’).
•   Swampy deposits including up to 1.5 m thick soft ‘marine’ clays occur in the south-
    western part of the site, overlying stiff residual clays.
•   Groundwater seepage typically occurs at depths of between 1 m and 1.5 m.
•   Potential Acid Sulfate Soil (PASS) exist within natural materials in the south-western part
    of the site, with the ‘marine’ clays being high level PASS.
•   Lime treatment is required at varying rates for material that will be excavated from the
    site, ranging from 10 kg/m³ for fill and pale coloured natural soils up to 100 kg/m³ for the
    soft ‘marine’ clay.
•   The construction of ‘bridging’ layers and/or excavation and removal of unsuitable
    materials will likely be required for fills in the south-west.
•   Dependent upon the final locations of buildings, preloading and/or piling may be required
    where soft clays occur.
•   In general, future site classifications are anticipated to be ‘S’ for residential construction
    (based on the natural soil profiles).
•   Higher site classifications are probably in areas underlain by soft ‘marine’ clay.




                                      Golder Associates

Page 3

October 2007                                             - ii -                                  077682076(AB)


                                     TABLE OF CONTENTS

SECTION                                                                                                       PAGE

1.0    INTRODUCTION .......................................................................................... 1
2.0    SITE DESCRIPTION .................................................................................... 1
3.0    METHOD OF INVESTIGATION................................................................... 2
       3.1      Preliminary Assessment ..........................................................................2
       3.2      Field Work ...............................................................................................2
       3.3      Geotechnical Laboratory Testing.............................................................3
       3.4      ASS Laboratory Testing ..........................................................................3
4.0    INVESTIGATION FINDINGS ....................................................................... 4
       4.1      Preliminary ASS Assessment..................................................................4
       4.2      Subsurface Conditions ............................................................................4
       4.3      Groundwater............................................................................................5
       4.4      Geotechnical Laboratory Testing.............................................................6
5.0    ACID SULFATE SOILS ................................................................................ 6
       5.1      Investigation Aims ...................................................................................7
       5.2      Soil Sampling...........................................................................................7
       5.3      Field pH (pHF) and Peroxide pH (pHFOX) .................................................7
       5.4      Summary of Soil Analysis Results...........................................................8
       5.5      ASS Extent and Severity .........................................................................9
       5.6      Preliminary Recommendations..............................................................10
                5.6.1 Treatment of Excavated Soil......................................................10
                5.6.2 Stockpiles and Handling ............................................................12
                5.6.3 Excavation for Services .............................................................12
                5.6.4 Extrusion of ‘Marine’ Clays Adjacent Fill Areas .........................13
                5.6.5 Dewatering.................................................................................13
6.0    GEOTECHNICAL ASSESSMENT ............................................................. 13
       6.1      Subdivision Development ......................................................................13
                6.1.1 Earthworks .................................................................................13
                6.1.2 Retaining Structures ..................................................................15
                6.1.3 Preliminary Pavement Design ...................................................15
                6.1.4 Drainage ....................................................................................16
                6.1.5 Site Management & Erosion Potential .......................................16
       6.2      Residential (Building) Development ......................................................17
                6.2.1 Earthworks .................................................................................17
                6.2.2 Site Classification & Footings ....................................................17
                6.2.3 Drainage ....................................................................................17
       6.3      Further Investigation ..............................................................................17
7.0    IMPORTANT INFORMATION .................................................................... 18




                                           Golder Associates

Page 4

October 2007                           - iii -                     077682076(AB)


LIST OF TABLES

Table 1           Summary of Geotechnical Laboratory Classification Testing
Table 2           ASS Action Criteria
Table 3           Retaining Structure Design Parameters
Table 4           Presumptive CBR Values

LIST OF FIGURES

Figure 1          Site Plan
Figure 2          Extract of ASS Map
Figure 3          Section A-A

LIST OF APPENDICES

Appendix A        Reports of Boreholes
                  Explanation of Notes, Abbreviations & Terms Used on Borehole
                  and Test Pit Reports
                  Method of Soil Description Used on Borehole and Test Pit Reports
Appendix B        Geotechnical Laboratory Test Results
Appendix C        Table C1 Summary of ASS Field & Laboratory Analysis Results
                  Environmental Laboratory Test Results (Soil)
Appendix D        Important Information About Your Geo-environmental Report




                            Golder Associates

Page 5

October 2007                                    -1-                           077682076(AB)


1.0      INTRODUCTION

This report details the results of a preliminary acid sulfate soil (ASS) and geotechnical
investigation undertaken for a proposed residential development described as Precinct J at
Noosa Springs. The investigation was carried out for Starco Developments Pty Ltd.

We understand that the proposed development will comprise approximately 27 residential
allotments. The proposed residential developments will require realignment of golf tees for
the 18th hole of the Noosa Springs Golf Course. We anticipate that earthworks will comprise
mostly excavations for roads and underground services across the residential area, whilst
filling will likely be carried out for the new golf tees.

This report details the results of the investigation, including a preliminary assessment of the
extent of ASS, and includes preliminary recommendations relating to management of ASS,
groundwater and surface water. Preliminary geotechnical advice is also provided regarding
earthworks, building footings and retention systems.

2.0     SITE DESCRIPTION

As shown in the aerial image below, the site is located in the central eastern part of Noosa
Springs within the existing golf course area and covers an area of approximately 3.06 ha.
Access to the site is via a track leading west from a round-about on Links Drive. Figure No. 1
includes a contour and detail survey plan of the study area together with a more detailed aerial
image.




                                 Site




                                Photograph 1: Site Location




                                     Golder Associates

Page 6

October 2007                                     -2-                         077682076(AB)


As shown in Figure No. 1, which includes contours at 0.5 m intervals, the ground surface
generally slopes down towards the west to south-west at gradients of up to 5º (9%). Steeper
man-made slopes occur around features such as the golf tees and a lake adjacent to the
western boundary (where the eastern bank slopes at approximately 20º). Ground surface
elevations range from approximately RL 9 m AHD along the eastern boundary, down to
RL 1.5 m AHD in the low-lying south-western corner (area of proposed golf tees). The water
level in the lake on the western boundary was at RL 0.54 m AHD at the time of the survey.

A large part of the subject site is covered by a palm plantation, where rows of palm trees are
separated by areas of short grass. There are some stands of dense native vegetation, with
melaleuca observed in the low-lying south-western corner. The existing 18th fairway traverses
the south-western corner and underground services (power and sewerage pressure main)
traverse the southern part of the site.

3.0      METHOD OF INVESTIGATION

3.1      Preliminary Assessment

To assist with planning the level of detail required for this investigation a preliminary site
assessment was conducted, comprising:

•     a desktop study; and

•     a walk-over survey on 25 September 2007.

The desktop assessment comprised a review of available published reports and plans on
geology and ASS distribution. The findings from this preliminary assessment are presented in
Section 4.1.

3.2      Field Work

The fieldwork was planned in order to enable a preliminary assessment of geotechnical and
ASS matters for the proposed development. It should be noted that the ASS investigation
does not fully comply with the number of boreholes required by State Guidelines (Ref.
Section 5.2).

A total of eight boreholes (designated BH1 to BH8) were drilled across the site using a 4WD-
mounted flight auger rig. Six boreholes (BH1 to BH4, BH6 & BH7) were drilled to 3 m
depth, mainly across the proposed residential development area, whilst boreholes BH5 and
BH8 were extended to 6 m.

Dynamic cone penetrometer (DCP) testing was conducted adjacent to each borehole. One
undisturbed (U50) tube sample was recovered from 1.5 m to 1.75 m depth in borehole BH8
and was tested by pocket penetrometer (PP).




                                     Golder Associates

Page 7

October 2007                                   -3-                            077682076(AB)


Samples for ASS testing were recovered from boreholes BH5 and BH8 at 250 mm intervals to
3 m depth. ASS sampling protocols in the field were conducted to minimise oxidation prior
to laboratory testing and followed the Queensland Sampling Guidelines1 October 1998
(Revision 4.0) of the “Guidelines for sampling and analysis of lowland Acid Sulfate Soils
(ASS) in Queensland 1998” produced by the Queensland Acid Sulfate Soils Investigation
Team (QASSIT).

The approximate location of each borehole was recorded using a hand-held GPS unit having
an accuracy of ± 3 m. Borehole positions are shown in Figure No. 1. Reports of boreholes
are presented in Appendix A, along with explanatory notes. Easting and northing coordinates
recorded for each borehole location are shown on the reports, together with ground surface
elevations interpolated from survey data provided.

Borehole drilling fieldwork was conducted on 4 and 5 October 2007 in the presence of a
Senior Geotechnician from Golder.

3.3     Geotechnical Laboratory Testing

Geotechnical classification testing was carried out on samples recovered from the boreholes at
the Bokarina laboratory of Geotech (S.C.) Pty Ltd in accordance with the procedures
described in Australian Standard AS1289 “Method of testing soils for engineering purposes”.
The results are given in Appendix B and are summarised in Table 1, Section 4.4.

3.4     ASS Laboratory Testing

Tests to assess field pH and pH after oxidation (with 30% hydrogen peroxide solution
buffered to pH>4.5) were conducted as an initial screening procedure to help select samples
for laboratory analysis. A total of 24 pHF/pHFOX tests were conducted and the results are
shown in Table C1 (Appendix C)

Based upon our assessment of the pH test results, a total of 6 samples were sent to Australian
Laboratory Services (ALS) at Stafford for ASS testing comprising the Chromium suite of
tests in accordance with ASS Method 23 laboratory procedures. pH was also measured in
KCl suspension by the analytical laboratory on all samples submitted for testing.

The ASS laboratory test reports from ALS are given in Appendix C and the results are
summarised in Table C1. Observations and discussion on the laboratory findings are given in
Section 5.




1
 Guidelines for Sampling and Analysis of Lowland ASS in Queensland, Qld ASS Investigation Team
(QASSIT), Revision 4.0, October 1998.



                                     Golder Associates

Page 8

October 2007                                               -4-                    077682076(AB)


4.0         INVESTIGATION FINDINGS

4.1         Preliminary ASS Assessment

Available geological information2 indicates that the site is underlain by Quaternary age strata,
being across the boundary between sand dune and coastal swamp deposits.

As shown in Figure No. 2, Extract of ASS Map, published ASS information3 covers the
subject site, with classifications given as follows:

•       S – Low-lying south-western area. “Land where ASS occurs within 5 m of the surface”.

•       LP/LP5 – Remainder of site. Land with a low or negligible probability of ASS
        occurrence, including ground above RL 5 m AHD.

Following the desktop study, and prior to the fieldwork, a walk-over survey of the site was
conducted by a Senior Geotechnical Engineer from our Maroochydore office on 25
September 2007. The walk-over survey was carried out in the presence of Mr Alan Starkey,
who provided anecdotal evidence regarding the site.

As mentioned in Section 2.0, a large part of the site is gently sloping land, where sandy soils
are exposed at the ground surface. The low-lying south-western part is approximately level or
has been filled and includes areas of melaleuca vegetation, which frequently indicates ‘wet’
ground and an increased risk of ASS occurrence (below RL 5 m AHD). Surface water drains
from this low-lying area via a system of drains and lakes towards the south.

Our preliminary assessment generally concurs with the published data in that potential ASS
(PASS) are likely to occur at shallow depths from natural ground level across the south-
western part of the subject site. No surface indications of previous oxidation of ASS (ie.
actual ASS or AASS) were observed; ie. we did not see any areas of iron staining, jarosite or
scalded vegetation.

4.2         Subsurface Conditions

The subsurface conditions encountered in the boreholes drilled across the subject site are
summarised below under classifications of inferred origin. Section A-A, Figure No. 3, shows
a cross-section through the site, overlain with subsurface conditions encountered in selected
boreholes.




2
    1:100,000 Geological Map, GYMPIE SPECIAL, Sheet 9445 & Part 9545, DME, 1999
3
    1:100,000 Redcliffe to Teewah ASS Map 2, DNRM, 1999




                                               Golder Associates

Page 9

October 2007                                    -5-                           077682076(AB)


RESIDENTIAL DEVELOPMENT AREA

Across the proposed residential development area, five boreholes (BH1 to BH4 & BH6) were
drilled to depths of 3 m and one borehole (BH5) was drilled to 6 m. The 3 m deep boreholes
encountered mostly medium dense to dense natural silty sand and sand to the depth of the
investigation. Loose sand was encountered from the ground surface to 0.2 m depth in most of
these boreholes, however was recorded to 0.7 m depth in borehole BH6. Boreholes BH1 to
BH4 encountered dense to very dense indurated sand (‘coffee rock’) in layers of various
thickness, commencing at depths of between 0.9 m and 2.6 m.

Borehole BH5 was drilled in the low-lying south-western part of the residential development
area and encountered a different profile comprising silty sand and firm sandy/silty clay fill to
1.1 m depth. Given our understanding of the history of placement of fill within the subject
site, any fill materials would likely be classified as “uncontrolled” in accordance with
Australian Standard AS3798. With uncontrolled fill, between test locations, there is
significant uncertainty regarding the composition and degree of compaction of the fill,
together with the proficiency of site preparation (eg. topsoil stripping and subgrade
compaction).

The fill materials in borehole BH5 overlie inferred natural swamp deposits of loose to
medium dense clayey sand or soft sandy clay to 2.4 m depth then soft to firm silty ‘marine’
clay to 3.2 m depth. Below 3.2 m depth the silty clay becomes stiff to very stiff (inferred
residual) and extends to the depth of investigation (6 m).

GOLF TEE REALIGNMENT AREA

Two boreholes (BH7 and BH8) were drilled to depths of 3 m and 6 m, respectively, across the
proposed 18th hole golf tee realignment area. Borehole BH7 encountered mostly medium
dense (or denser) natural silty sand or sand to 2.8 m depth with a band of indurated sand from
2.2 m to 2.8 m depth, then stiff sandy clay to 3 m. Borehole BH8 was drilled in the low-lying
south-western area near BH5 and encountered a similar profile, being very loose natural
clayey sand from the ground surface to 0.9 m depth overlying soft sandy and silty clay
becoming stiff (or stiffer) below 2.6 m depth.

4.3     Groundwater

Groundwater seepage was generally encountered at depths of between 1 m and 1.5 m in the
boreholes during the investigation, except for boreholes BH6 and BH7 where seepage was
encountered at depths of 2.4 m and 2.2 m respectively. The groundwater level across the site
will be subject to variations dependent upon the intensity and duration of preceding rainfall
events and may rise close to the ground surface in places.




                                     Golder Associates

Page 10

    October 2007                                     -6-                           077682076(AB)


    4.4        Geotechnical Laboratory Testing

    The results of geotechnical laboratory classification testing carried out are given in Appendix
    B and are summarised in Table 1 below.

                Table 1: Summary of Geotechnical Laboratory Classification Testing

Borehole #       % <0.075 mm    Liquid Limit   Plastic Limit    Plasticity       Linear        Emerson
(Depth, m)        (Silt/Clay)       (%)            (%)         Index (%)       Shrinkage         Class
                                                                                  (%)           Number
BH1, 0.3-0.4          3              -               -              -              -               6
BH3, 0.4-0.5          9              -               -              -              -               8
BH4, 0.3-0.4          5              -               -              -              -               8
BH5, 0.2-0.3          64            53              16             37             14.5             -
BH6, 0.5-0.6          2              -               -              -              -               -




    Geotechnical laboratory testing generally confirms our field descriptions of the sands and
    clays encountered in the boreholes. Emerson class numbers of 6 to 8 indicate that the soils
    tested are non-dispersive.


    5.0        ACID SULFATE SOILS

    The development of Potential Acid Sulfate Soils (PASS) is commonly the result of marine
    and estuarine deposition of sulfate and iron bearing sediments in the presence of an abundant
    source of readily decomposable organic matter resulting in the deposition of pyrite. This
    pyrite is stable within the soil so long as anoxic conditions prevail. Oxidation of this material
    produces acidic conditions and oxidation typically occurs as the material is exposed above the
    water table by excavation.

    Previous experience and available guidelines indicate that PASS are normally restricted in
    extent to recent (Holocene to Pleistocene age) soil horizons deposited in a saline environment
    below RL 5 m AHD. The State Planning Policy SPP2/02 Planning and Managing
    Development Involving Acid Sulfate Soils applies to land, soil and sediment at or below RL
    5 m AHD where the natural ground level is less than 20 m AHD. Within such areas the SPP
    applies to development involving any of the following:

    •     Excavating or otherwise removing 100 m3 or more of soil or sediment; or

    •     Filling of land involving 500 m3or more of material with an average depth of 0.5 m or
          greater.


    The topography of western part of this site is consistent with the above criteria (Ref. Figure
    No. 1 for RL 5 m AHD contour). Furthermore, the proposed development will involve




                                           Golder Associates

Page 11

October 2007                                    -7-                            077682076(AB)


excavation and filling earthworks during subdivision (eg. civil works to form roads,
underground services and realign the golf tees). SPP2/02 is therefore applicable to this site
and an assessment of potential disturbance of ASS is required.

5.1       Investigation Aims

The aims of this investigation were to:

•     Conduct a preliminary ASS assessment, partly in accordance with SPP 2/02 and
      Queensland Sampling Guidelines;

•     Identify the presence or absence of ASS in the proposed disturbance area; and

•     Provide an indication of the likely location of ASS and treatment methods.

The results of the preliminary ASS investigation follow.

5.2       Soil Sampling


In accordance with SPP2/02 a borehole sampling program is to be defined based on the broad
scale information obtained from the desktop assessment (Section 4.1) and calculations of the
extent of the proposed disturbance. The Queensland Sampling Guidelines Section 4.2
indicate a minimum of 6 boreholes per hectare for sites of between 1 and 2 hectares (less than
half of the site is located below RL 5 m AHD). A total of six ASS boreholes would therefore
be required to satisfy the Guidelines.

Due to the preliminary nature of current project planning, a preliminary ASS investigation
was carried out comprising two boreholes (BH5 and BH8) within the lowest-lying south-
western part of the site (golf tee realignment area). Four additional boreholes will be required
to satisfy the required density of testing specified in the Queensland Sampling Guidelines and
these should be carried out once more detailed information is available regarding the proposed
development.

The depth of investigation, being 3 m, was established as at least 1 m below the anticipated
depths of disturbance, being up to 2 m for service trenching.

Soil sampling, handling and testing was conducted as described in Section 3.2.

5.3       Field pH (pHF) and Peroxide pH (pHFOX)


A typical consequence of the oxidation of pyrite in soils and the formation of sulfuric acid is a
drop in soil pH. Measuring field pH (pHF ) as soon as possible after sampling and then
measuring pH following oxidation (pHFOX ) of the soil in suspension with a strong oxidising
agent (hydrogen peroxide) provides a simple, relatively conservative test procedure to detect




                                      Golder Associates

Page 12

   October 2007                                           -8-                                 077682076(AB)


   soils which are not likely to be ASS. The test simulates extreme natural conditions and pH
   drops following this test may not be entirely attributable to pyrite oxidation.

   pHF was measured using a TPS MC81 meter with an intermediate junction electrode
   immersed in a 1:5 soil-water suspension. Soil pHF and pHFOX are summarised in Table C1 in
   Appendix C.

   Some significant variations in soil field pH were noted across the site. The natural soils were
   generally found to range between moderately acidic and neutral with pHF values (natural
   state) typically between pH 4 to pH 7.

   5.4       Summary of Soil Analysis Results

   Table 2 shows the ASS action levels adopted by Queensland authorities based on three broad
   texture categories (QASSIT Guidelines - October 1998). These categories have been used to
   highlight significant results in Table C1, based on the Action Criteria for greater than
   1000 tonnes of disturbed soils.

                                       Table 2: ASS Action Criteria

         Type of Material                        Action Criteria                Action Criteria if more than
                                          1-1000 tonnes disturbed                  1000 tonnes disturbed
   Texture range            Approx     Sulfur trail          Acid trail        Sulfur trail          Acid trail
                                                                   +
  McDonald et al.            clay    %S oxidisable         mol H / tonne     % S oxidisable        mol H+ / tonne
       (1990)           Content      (oven-dry basis)     (oven-dry basis)   (oven-dry basis)     (oven-dry basis)
                             (%)     eg STOS or SPOS          eg, TPA          eg STOS SPOS           eg, TPA
                                                             (or TSA)                                (or TSA)
  Coarse Texture             ≤5           0.03                     18             0.03                  18
Sands to loamy sands
 Medium Texture             5 - 40        0.06                     36             0.03                  18
Sandy loams to light
         clays
   Fine Texture              ≥40           0.1                     62             0.03                  18
 Medium to heavy
clays and silty clays



   The actual volume of soils disturbed at this site will likely be greater than 1000 tonne and
   therefore the lowest action criteria (ie. 0.03% S and 18 mol H+/tonne) are applicable.

   The data quantifying the acid generating potential for soils sampled within the site have been
   collated and are summarised in Table C1, Appendix C, along with laboratory reports.

   Samples with pH drops of 2.0 or more pH units or pH < 3 after oxidisation are highlighted in
   Table C1. From the laboratory test results, SCR % and TAA values above the action levels are



                                              Golder Associates

Page 13

October 2007                                     -9-                           077682076(AB)


also highlighted. The following observations are made regarding the investigation results as
presented in Table C1:

•     67% of samples show pH after oxidation less than pH3, with 81% of those samples being
      described as grey or dark grey coloured silty/sandy clays or clayey sands of soft or loose
      consistency, respectively.

•     3 out of 6 samples selected for laboratory testing returned SCr results exceeding the
      Action Criteria (0.03%S), with a maximum value of 1.17%S recorded for the ‘marine’
      clay sample from 1.75 m depth in borehole BH8. The other 3 samples returned results
      less than the laboratory detection limit of 0.02%.

•     3 out of 6 samples tested for TAA returned results at or above the Action Criteria (18 mol
      H+/t) ranging between 21 mol H+/t and 66 mol H+/t.

•     1 sample (BH8, 1.75 m) returned a pHKCl value greater than 6.5 and was subsequently
      tested to determine retained acid neutralising capacity (ANC). The ANC was found to be
      262 mol H+/t and is due to the presence of broken shells as noted in the borehole report.
      These broken shells were noted to be mostly coarse, rather than fine grained.

5.5       ASS Extent and Severity

The results from this investigation indicate that ASS having a potential to generate sulfidic
leachate (ie. PASS) exist within the natural grey to dark grey coloured clayey sand and
sandy/silty clay soils in the low-lying south-western part of this site. Dark grey silty ‘marine’
clays in boreholes BH5 (2.4 m to 3.2 m depth) and BH8 (1.4 m to 2.6 m depth) are likely to
be high level PASS.

It should be noted that there is also existing acidity variably distributed throughout the fill
materials and natural soil profile.

Although one of the ‘marine’ clay soil samples tested has an acid neutralising capacity that
could significantly reduce or neutralise the potential acidity, it is our opinion that the ANC
should be excluded from calculations when assessing required liming rates for this site. This
is because the ANC in the soils is derived from broken shells that are generally very coarse,
hence the ANC from those shells is unlikely to be fully available in the field.

The SPP2/02 Guideline requires that the level of treatment for management of ASS is based
on treatment of all existing and potential acidity. The results of the laboratory testing have
been accumulated in an Acid-Base Account to give a Net Acidity Value for each sample in
units of mol H+/tonne as presented in Table C1. These values have been calculated from
sulfur trail potential acidity (SCr or SPOS) plus actual acidity (TAA) plus retained acidity
(SNAS), but does not include ANC.




                                       Golder Associates

Page 14

October 2007                                  - 10 -                          077682076(AB)


Liming rates calculated from the laboratory analyses are summarised in Table C1, Appendix
C, along with a summary of the soil type. As shown in Table C1, calculation of liming rates
required for full neutralisation of combined actual and potential acidity indicates a range in
treatment rates from <1 kg.CaCO3/m³ to 99 kg.CaCO3/m³. These rates have been calculated
by using the net acidity values, without ANC, for the various depth intervals, include a factor
of safety of 1.5 and a bulk density of 1.8 tonne/m³.

Liming rates of less than 10 kg.CaCO3/m³ should be anticipated for fill materials and pale
coloured residual soils, whilst rates in the order of 50 kg.CaCO3/m³ and 100 kg.CaCO3/m³
could be expected for dark coloured natural clayey sands and silty ‘marine’ clays.

Delineation of the various layers in the field during excavation, and corresponding required
lime treatment rates, would be based upon visual observations and pH testing. As an
example, the ‘marine’ clays that are high level ASS would be identified by their dark colour
and soft consistency, together with pHFOX values of generally less than 2. Field pHFOX
screening would be a relatively simple procedure during construction earthworks.

5.6     Preliminary Recommendations

As there are likely to be significant earthworks in areas of ASS, and such works will also
likely disturb existing groundwater, there will be a requirement for detailed management of
these issues. The volume of disturbance and the level of treatment required indicates that
management of ASS at this site could be classified as Category XH (extra high level)
treatment in accordance with SPP2/02 Guideline - Table 4.

SPP2/02 Guideline requires that for Category XH treatment an environmental management
plan (EMP) must be provided. Furthermore, Section 9.15 of SP2/02 Guideline stipulates that
“this plan should provide for ongoing management and monitoring of the effects of
disturbance of ASS through the construction and operation of the project and describe the
construction schedules and environmental management procedures. The project should also
be staged so that the potential effects on any area disturbed at anyone time is limited and
easily managed.”

Preliminary recommendations on strategies to be included in the EMP are discussed as
follows.

5.6.1    Treatment of Excavated Soil

It is anticipated that most soils excavated from the site below RL 5 m AHD will be used as fill
above the water table and must therefore be managed by full neutralisation of existing plus
potential acidity. It is proposed that fine agricultural lime thoroughly mixed with the soil is
used as the neutralising agent. Lime treatment should be carried out in accordance with
Queensland Acid Sulfate Soil Technical Manual, Soil Management Guidelines (Ver 3.8 Nov.
2002).




                                     Golder Associates

Page 15

October 2007                                    - 11 -                            077682076(AB)


In particular the following measures apply to the liming process:

•   Treatment should be carried out on prepared pads which may be the permanent
    placement area. The earthworks strategy should be formulated to provide a number of
    pads of appropriate size for practical spreading mixing and drying, so that adequate time
    is available to complete the treatment and validation testing before placing the next layer.

•   Treatment pads are to be contained by bunds with stormwater runoff directed to a
    collection sump. Bunds to be constructed from low permeability materials that are not
    ASS or have been fully lime treated.

•   The treatment pad should be stripped of topsoil and proof rolled to achieve a uniform
    density and reduced permeability, then a guard layer of neutralising agent should be
    spread across the soil surface prior to placement of the first layer of fill. The rate of
    neutralising agent applied should be based on 0.2 times the average total potential plus
    existing acidity for every 1m depth of fill placed. For preliminary purposes an
    application rate of 5 kg lime per m2 per vertical metre of fill thickness is suggested.

•   Treatment should be carried out by spreading the soil in maximum 300 mm loose
    thickness layers and moisture conditioning before spreading lime at the appropriate
    application rate. The ASS may require reworking several times to achieve adequate
    mixing of the neutralising agent and/or drying of the soil.

•   It is proposed that treatment levels are assigned on the basis of the results of a detailed
    ASS investigation. Liming rates from this preliminary investigation would be as follows:

    o    Existing fill/pale coloured soils               10 kg lime/m3

    o    Natural dark coloured clayey sands              50 kg lime/m3

    o    ‘Marine’ clay                                   100 kg lime/m3

    Lime treatment rates should be confirmed following further investigation, together with
    inspection and field testing by a suitably qualified and experienced environmental
    scientist during excavation.

•   Verification sampling and analysis is to be carried out on the treated soil using the
    Chromium suite method at a rate of 1 test per 250 m³ to confirm that appropriate amounts
    of the neutralising agent have been incorporated into the soil.

•   An accurate spatial tracking system should be developed to control the movement and
    final location of the treated soils so that initial testing (from this report) can be correlated
    to the verification of prescribed treatment.




                                      Golder Associates

Page 16

October 2007                                  - 12 -                         077682076(AB)


5.6.2    Stockpiles and Handling

Wherever practical the earthworks handling should involve transport directly from cut to
treatment/fill area and stockpiling of untreated ASS should be avoided. The recommended
maximum time period for which soils can be temporarily stockpiled without treatment is 18
hours for sands and 2 to 3 days for other soils.

Where it is necessary to stockpile untreated ASS for moderate periods (up to 3 weeks) the
following additional management measures must be followed:

•   Stockpiles are to be contained by bunds with stormwater runoff directed to a collection
    sump. Bunds are to be constructed from low permeability materials that are not ASS or
    have been fully lime treated.

•   A guard layer of neutralising agent should be spread across the soil surface prior to
    placement of the stockpile. The rate of neutralising agent applied should be based on 0.3
    times the average total potential plus existing acidity for every 1m height of soil in the
    stockpile.

•   The surface area of the stockpile is to be minimised by shaping and possibly capping or
    covering to prevent moisture loss and rainfall entry.

•   Keep the surface of the stockpile moist using a spray of water or neutralising solution
    with care to avoid over-wetting.

5.6.3    Excavation for Services

Assessment can be made on an individual basis of the extent of excavations and where these
potentially disturb the ASS. However, in general the residential development area may
involve excavations extending into underlying soils, which may have potential acidity.
Trenching works would need to be carried out under a management plan which for linear
excavations that typically would include:

•   Lime treatment, thoroughly mixed into the soil at the appropriate rate for full
    neutralisation of potential plus actual acidity.

•   As a general practice in trenching operations, stockpiles of excavated material should not
    be left exposed for longer than the minimum practical time before being replaced beneath
    the groundwater table before oxidation can occur. The QASSIT Soil Management
    Guidelines recommend reburial below the water table within 18 hours for coarse textured
    soil.

•   Minimise the extent of groundwater drawdown adjacent to the excavation by staging the
    excavation in short sections that are kept open for a limited duration (eg. 18 hours).




                                     Golder Associates

Page 17

October 2007                                   - 13 -                          077682076(AB)


5.6.4    Extrusion of ‘Marine’ Clays Adjacent Fill Areas

We anticipate that new fills will be constructed for the realigned golf tees in the south-western
part of the site. Investigations in those areas indicate soft clays up to approximately 1.5 m
thick. Provided that construction of new fill is staged and monitored, it is our opinion that
there should be a low probability of extrusion of ‘marine’ clays above the groundwater table.
Preloading of the site may be required together with settlement plate monitoring for any
building areas over soft clays. Preliminary geotechnical advice regarding filling of the site is
provided in Section 6.

5.6.5    Dewatering

All waters collected from groundwater or surface water inflow to excavations and runoff from
treatment areas should be collected in sumps and pumped to a treatment pond or tank for
monitoring and treatment to compliance with discharge criteria (if required) prior to release
from site.

6.0      GEOTECHNICAL ASSESSMENT

6.1     Subdivision Development

6.1.1   Earthworks

6.1.1.1 Site Preparation and Filling

Prior to any earthworks, organic rich topsoil must be stripped and removed from the
construction area. This material must not be used as fill to support any structural loads. Areas
of existing fill must also be excavated and re-placed in a controlled manner following the
guidelines below (eg. existing golf tees).

Dependent upon the natural ground conditions and prevailing weather at the time of
construction, areas of the exposed subgrade following surface stripping may comprise loose,
soft or saturated materials, particularly across the low-lying south-western part of the site. To
enable filling over such subgrades, it may be necessary to construct ‘bridging’ layers or over-
excavate and replace the unsuitable materials with select fill. Bridging layers can comprise a
combination of materials including geotextiles, clean gravel and rock ‘spalls’.

Following preparation of the subgrade, fill should be compacted at moisture contents within
the range of -2% to +0.5% of optimum moisture content for Standard Compaction.
Confirmatory testing must be carried out at regular intervals. A minimum of two tests per
300 mm vertical interval is recommended where structural fill heights are to exceed 300 mm.
Further details for control and testing of fill are given in Australian Standard AS 3798-2007
"Guidelines on Earthworks for Commercial and Residential Developments". Level 1
certification (as per AS3798) of earthworks is recommended for this site.




                                      Golder Associates

Page 18

October 2007                                     - 14 -                           077682076(AB)


Select fill should have a maximum particle size of 100 mm for an uncompacted layer
thickness of 200 mm and shall be compacted by repeated rolling to achieve a dry density ratio
of at least 95% of the Maximum Standard Dry Density for cohesive soils, or 70% Dry Density
Index for cohesionless soils.

In accordance with good construction practice, fill embankments should be ‘over built’ and
then trimmed back to the well compacted material.

6.1.1.2 Settlements & Preloading

For future fills in the order of 2 m height in the south-western part of the site (eg. new golf
tees), we estimate total settlements from consolidation of soft ‘marine’ clays in the order of
90 mm for 1.5 m of total clay thickness. This estimate is for a design life of 50 years and is
based upon estimates of compressibility coefficients based upon local experience. It should
be noted that this settlement does not include the effects of building loads.

In order to minimise differential settlements for civil structures (eg. pavements and services)
and buildings, dependent upon the locations of such structures, it may be necessary to preload
fill areas. Based upon our experience in the local area, preload durations of up to 6 months
may be required. Preload durations and potential future creep settlements may be reduced by
the placement of additional fill (ie. surcharge) above the design fill level. Preloading
settlements must be monitored by settlement plates installed in the new fill.

It is essential that global stability issues are considered at the edges of preloaded areas prior to
the commencement of earthworks. It may be necessary to implement staged construction in
order to reduce the risk of global instability to an acceptable level.

In order to more accurately define likely settlements, preloading and staged construction
requirements, further detailed geotechnical investigation is recommended (Ref. Section 6.3),
once detailed subdivision design is available

6.1.1.3 Excavations and Batter Slopes

Excavations for road construction and underground services should be achievable using
conventional earthmoving equipment. The assistance of ripper attachments may be required
for excavation of the dense to very dense indurated sand, which was encountered below much
of the residential development area.

Temporary batters in clay, clayey engineered fill and indurated sand may be formed at 1V:1H,
and temporary batters in non-indurated sand should be no steeper than 1V:1.5H. Flatter
batters may be required if groundwater seepage is encountered or if batters are not protected
from erosion by rainfall.




                                       Golder Associates

Page 19

October 2007                                           - 15 -                               077682076(AB)


Permanent batters should be formed no steeper than 1V:2.5H in sandy materials and 1V:2H in
clay (or engineered fill batters). Steeper cuts or fill batters should be retained.

6.1.2     Retaining Structures

Design for retaining structures could be carried out using a triangular pressure distribution
applicable to the wall type and based on the parameters listed in the table below. The values in
Table 3 assume that the walls are fully drained and no allowance is included for construction
loading, up-slope footing loadings, the effects of sloping ground, and backfill compaction
stresses.

                        Table 3 – Retaining Structure Design Parameters

Retained Material             Unit         Friction             Lateral Earth Pressure Coefficient
                             Weight         Angle
                             (t/m3)       (Degrees)
                                                                Ka                   Ko            Kp

    Loose to Medium            1.9            30                0.33                 0.5           3.0
      Dense Sand

      Dense Sand               1.9            35                0.27                 0.4           3.6

        Stiff Clay             1.8            27                0.4                  0.6           2.6

    Compacted Fill              *              *                 *                    *              *

Note:
•    Variable dependent upon the type of material used and the degree of compaction achieved.




6.1.3     Preliminary Pavement Design

The design of pavements (flexible and rigid) is based upon the CBR value of the subgrade
material. The subgrade CBR may be obtained by i) laboratory soaked CBR tests, ii)
correlations with DCP tests, and iii) the Queensland Transport Pavement Design Manual –
1990 which provides presumptive insitu CBR values based on soil type and site conditions.

At this site, the subgrade material is expected to comprise mostly loose to medium dense and
dense silty sands and sands. Section 5.3.3, Table 5.5 of the Queensland Transport Pavement
Design Manual, suggests the CBR values in Table 4 below for various subgrade soil types and
site conditions.




                                            Golder Associates

Page 20

October 2007                                  - 16 -                         077682076(AB)


                            Table 4 – Presumptive CBR Values

Subgrade Type                                Drainage conditions      Presumptive CBR (%)
Silty SAND (SM)                                        Poor                      5
                                                       Good                      7
Dense SAND (SW, SP)                                    Poor                     10
                                                       Good                     15


For the proposed pavement areas we recommend that a preliminary design CBR of 7% be
adopted for design. The subgrade CBR must be confirmed by inspection and testing
following earthworks to subgrade level.

6.1.4   Drainage

Diversion drainage, in the form of earth bunds or swales, should be placed up slope of
construction areas in order to divert surface water away.

Permanent subsurface drainage should be installed in any areas identified during construction
or earthworks as having wet (as opposed to moist or dry) soil. Natural groundwater ‘springs’
may occur across the site, particularly at breaks-in-slope such as around the edge of the low-
lying south-western area.

Positive permanent drainage must be installed behind retaining walls to prevent the
development of hydrostatic pressures. Diversion drains may be required above the crest of
cut or fill embankments.

Stormwater collected from road surfaces should be directed by swales or pipes to engineer
designed dissipation/detention structures.

Perimeter, subsurface cut-off drains should be installed adjacent to new pavements in order to
intercept and divert subsurface seepage prior to entering the pavement subgrade.

6.1.5   Site Management & Erosion Potential

It is recommended that ‘good’ building practices are adopted so that moisture variations are
minimised in foundation/subgrade materials. In particular we recommend the following:

•   Site drainage should be designed to readily remove surface water and to prevent ponding
    of water on subgrade areas during construction and also adjacent to foundations and
    pavements once construction is completed.

•   Construction methods involving subgrade preparation for earthworks, foundation
    excavation and service trenching should be such that any clay soils are not subjected to




                                     Golder Associates

Page 21

October 2007                                  - 17 -                          077682076(AB)


      continued exposure, as this may result in excessive drying followed by moisture re-
      adjustment (with associated expansive movements) when areas are overlaid by
      pavements or slabs.

Laboratory testing indicates that the site soils have Emerson class numbers of 6 to 8, which
indicates that the soils tested are non-dispersive. Normal best practice erosion and sediment
control will be required during construction.

6.2      Residential (Building) Development

6.2.1   Earthworks

Earthworks for residential development should be carried out in accordance with the
recommendations provided in Section 6.1.

6.2.2    Site Classification & Footings

Based upon the subsurface conditions encountered in the boreholes, without any additional
cutting or filling, we anticipate site classifications are likely to be ‘S’ in accordance with
AS2870-1996 “Residential Slabs and Footings”. For the majority of the residential
development area. The final site classification will depend on the type and compaction of any
new fill together with the potential reactivity of the natural soil profile.

Increased site classifications (eg. ‘M’, ‘H’ or ‘P’) may be required, and/or support on deeper
piled footings, for any buildings constructed above soft clay areas.

In general, residential footings should generally penetrate through any uncontrolled fill or
unsuitable natural soils and found at least 100 mm into medium dense ( or denser) natural
sand. Conventional strip, pad or beam footings so founded could be designed using an
allowable bearing pressure of 100 kPa.

It should be noted that individual site investigations (‘soil tests’) will be required prior to
building for every allotment.

6.2.3    Drainage

Drainage for individual residential allotments should comply with the recommendations in
Section 6.1.4, where applicable.

6.3      Further Investigation

Based upon the results of this preliminary investigation, it is our opinion that the proposed
residential development is feasible, from a geotechnical viewpoint, by incorporating
conventional geotechnical measures (possibly including preloading fills and piling buildings).




                                     Golder Associates

Page 22

October 2007 -18- 077682076(AB)

 

In order to enable the provision of detailed geotechnical advice for the development of this
site, it is recommended that further geotechnical investigation should be carried out at the
civil/building works stage. Such further investigation should include additional boreholes,
which could also be utilised to satisfy the ASS investigation requirements per State
Guidelines.

7.0 IMPORTANT INFORMATION

Your attention is drawn to the document - “Important Information About Your Geo-
environmental Report”, which is included in Appendix D of this report. This document has
been prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which
Golder Associates is a member. The statements presented in this document are intended to
advise you of what your realistic expectations of this report should be, and to present you with
recommendations on how to minimise the risks associated with the groundworks for this
project. The document is not intended to reduce the level of responsibility accepted by
Golder Associates, but rather to ensure that all parties who may rely on this report are aware
of the responsibilities each assumes in so doing.

We would be pleased to answer any questions about this important information from the
reader of this report.

GOLDER ASSOCIATES PTY LTD

 

Ashley Davey BE(Geéot.) MIEAust RPEQ 8159
Senior Geotechnical Engineer

41\2007\GEOTECHNICAL\077682076\00_CORRESPONDENCE\OUTIAB077682076R DOC
ACDIDIQ/aed

Golder Associates

Page 23

 

LEGEND

    
   
  

TREE LINE
N i6th GREEN -

   

 

oo DENOTES BOREHOLE LOCATION

RL5 A A DENOTES SECTION LINE

kd) (REF. FIGURE NO.2)

(5th GREEN

    
 
    

=
aS
LAKE 3
>
LAKE
Weiter
Level
RLO54

(7th GREEN

YSP108098

/4th GREEN

&

  
 
 

 

Note: Baseplan supplied by JF&P Pty Ltd Dwg. No. M1806-09

 

 

 

 

 

 

‘CLIENT PROJECT
Starco Developments Pty Ltd Proposed Precinct J, Noosa Springs
| im DRAWN DATE TITLE
| Gold JM 30-10-07
: SITE PLAN
| Bisettes. ose aco* |" 30-10-07
sme 1:1500 (Approx.) a3 PE" 77682076 FIGURE Re 1

 

 

 

 

 

 

 

 

4J:\2007\Geotechnical\\077682076\ TASK\03_FIGURES_DRAWINGS\077682076 Figure 1 SITE PLAN.dwg Oct 31, 2007 — 12:15pm NOTE: THE * BESIDE THE TYPED INTTALS DENOTES THE ORIGINAL DRAWING ISSUE WAS SIGNED OR INTIALLED BY THAT RESPECTIVE PERSON.

Page 24

                                                                                                                                                                                                                                                     N




                                                                                                                                                                                                                                                                                                                                                                                     SUBJECT SITE
Information contained on this drawing is the copyright of Golder Associates Pty Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright . © Golder Associates Pty Ltd.




                                                                                                                                                                                                                                            Reproduced with permission of the Department of Natural Resources & Water
                                                                                                                                                                                                                                                                                       CLIENT                                                    PROJECT

                                                                                                                                                                                                                                                                                                Starco Developments Pty Ltd                                       Proposed Precinct J, Noosa Springs
                                                                                                                                                                                                                                                                                        DRAWN                       DATE                            TITLE
                                                                                                                                                                                                                                                                                                   ACD                       30/10/07
                                                                                                                                                                                                                                                                                        CHECKED                     DATE
                                                                                                                                                                                                                                                                                                                                                                       EXTRACT OF ASS MAP
                                                                                                                                                                                                                                                                                                   DJQ*                      31/10/07
                                                                                                                                                                                                                                                                                        SCALE                                                       PROJECT No                                 FIGURE No
                                                                                                                                                                                                                                                                                                         Not Defined                       A4                       077682076                                    2
                                                                                                                                                                                                                                            J:\2007\Geotechnical\077682076\TASK\03_FIGURES_DRAWINGS\Fig02.ppt   Note: The * typed beside the initials indicates that the original drawing was signed or checked by that respective person

Page 25

                                                                                                                                                                                                                                                                                                                                                                                               0                                                                           50                              100                              150       200                                                    250                                                      300

                                                                                                                                                                                                                                                                                                                                                                                         10                                                                                                                                                                                                                                                                                                10




                                                                                                                                                                                                                                                                                                                                                                                          8                                                                                                                                                                                                                                                                                                8


                                                                                                                                                                                                                                                                                                                                                                                                     BH 3

                                                                                                                                                                                                                                                                                                                                                                                                            L
                                                                                                                                                                                                                                                                                                                                                                                          6    DS
                                                                                                                                                                                                                                                                                                                                                                                                            MD                                                                                                                                                                                                                                                                             6
                                                                                                          Information contained on this drawing is the copyright of Golder Associates Pty. Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright. Copyright Golder Associates Pty. Ltd.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BH 4
                                                                                                                                                                                                                                                                                                                                                                                                            D
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          DS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Existing Ground Surface
                                                                                                                                                                                                                                                                                                                                                                                          4                                                                                                                                                                                                                                                                                                4


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   BH 5
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      D
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          MD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              DS

                                                                                                                                                                                                                                                                                                                                                                                          2                                                                                                                                                                                                                                                                                                2
                                                                                                                                                                                                                                                                                                                                                               REDUCED LEVEL (m - AHD)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          F
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     BH 8
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          L
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          S

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          L-MD                                              VL

                                                                                                                                                                                                                                                                                                                                                                                          0                                                                                                                                                                                                                                                                                                0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              DS          S-F
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               U50          PP=30 kPa
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            S

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              DS




                                                                                                                                                                                                                                                                                                                                                                                          -2                                                                                                                                                                                              St-VSt                                                                                           -2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              DS
GAP5_1_MDORE_COLOUR.GLB FENCE A3 NO PLAN J:\2007\GEOTECHNICAL\077682076\TASK\01_GINT\077682076BH.GPJ GAP5_1.GDT 30/10/2007 3:54:58 PM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            St-VSt

                                                                                                                                                                                                                                                                                                                                                                                          -4                                                                                                                                                                                                                                                                                               -4




                                                                                                                                                                                                                                                                                                                                                                                          -6                                                                                                                                                                                                                                                                                               -6




                                                                                                                                                                                                                                                                                                                                                                                          -8                                                                                                                                                                                                                                                                                               -8




                                                                                                                                                                                                                                                                                                                                                                                         -10                                                                                                                                                                                                                                                                                               -10

                                                                                                                                                                                                                                                                                                                                                                                               0                                                                           50                              100                              150       200                                                    250                                                      300

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DISTANCE (m)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                 OFFSET FROM
                                                                                                                                                                                                                                                                                                                                                                                                                     BASELINE         BH#
                                                                                                                                                                                                                                                                                                                                                                                                                                      (5.0)            CONSISTENCY,
                                                                                                                                                                                                                                                                                                                                                                                                                                                         DENSITY OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Silty SAND                    Silty CLAY                            Refer to Figure No. 1 for Borehole Locations
                                                                                                                                                                                                                                                                                                                                                                                                                                                     ROCK STRENGTH
                                                                                                                                                                                                                                                                                                                                                                                                                                              L
                                                                                                                                                                                                                                                                                                                                                                                                                  SPT "N"                                           LOW
                                                                                                                                                                                                                                                                                                                                                                                                          UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                                                                                                16
                                                                                                                                                                                                                                                                                                                                                                                                                                                            PASS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   SAND                          Sandy CLAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    MEDIUM
                                                                                                                                                                                                                                                                                                                                                                                                               SAMPLE
                                                                                                                                                                                                                                                                                                                                                                                                                            U63                                     HIGH
                                                                                                                                                                                                                                                                                                                                                                                                                                              PP=500 kPa
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   INDURATED SAND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CLIENT                                                             PROJECT
                                                                                                                                                                                                                                                                                                                                                                                                                                                   k=3.5x10-6m/s
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   REFER TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Starco Developments Pty Ltd                                                    Proposed Precinct J, Noosa Springs
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   EXPLANATION
                                                                                                                                                                                                                                                                                                                                                                                                                 WATER
                                                                                                                                                                                                                                                                                                                                                                                                              REFER TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   SHEET           FILL                                                                 DRAWN                             DATE                             TITLE
                                                                                                                                                                                                                                                                                                                                                                                                           EXPLANATION
                                                                                                                                                                                                                                                                                                                                                                                                                  SHEET
                                                                                                                                                                                                                                                                                                                                                                                                                                              sv=450 kPa           GAP Form No 6
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ACD                        30/10/2007                                                  SECTION A-A
                                                                                                                                                                                                                                                                                                                                                                                                           GAP Form No 6                      PID=5 ppm

                                                                                                                                                                                                                                                                                                                                                                                                                                              PM=460 kPa
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Clayey SAND                                                          CHECKED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      DJQ*                DATE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 31/10/2007
                                                                                                                                                                                                                                                                                                                                                                                                          SOIL
                                                                                                                                                                                                                                                                                                                                                                                                   (NON CORED)
                                                                                                                                                                                                                                                                                                                                                                                                       CORED       RQD %                               UNIT OR CLASS                                                                                    SCALE                                                              PROJECT No                                      FIGURE No
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Sandy Silty CLAY
                                                                                                                                                                                                                                                                                                                                                                                                                                 95           II
                                                                                                                                                                                                                                                                                                                                                                                                                                                    19 uL
                                                                                                                                                                                                                                                                                                                                                                                                                                                               PACKER TEST                                                                                              H 1:1000 V 1:100                           A3                           077682076                              3
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Note: The * beside the typed initials denotes the original drawing issue was signed or initialled by that respective person

Page 26

Appendix A

Reports of Boreholes
Explanation of Notes, Abbreviations & Terms Used on
Borehole and Test Pit Reports
Method of Soil Description Used on Borehole and Test Pit
Reports

Page 27

 

 

 

REPORT OF BOREHOLE: BH 1

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS_{_MDORE.GLB FULL PAGE J:\2007\GEOTECHNICAL\077682076\TASK\01_GINTI077682076BH.GPJ GAP5_1.GDT_30/10/2007 3:47:23 PM

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Starco Developments Pty Ltd COORDS: mE mN 56 WGS84 DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 6.5m DATUM: AHD DRILLER: Contract Drilling
LOCATION: Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 4/10/07
JOB NO: 077682076 HOLE DIA: 100 mm_ HOLE DEPTH: 3.00m CHECKED: hve DATE: Sejto/oe
Drilling Sampling Field Material Description
Su ° = 3
5 g SAMPLE OR # ° 3 w a DCP TEST (AS1289.6.3.2)
8 |e 3 gle IL |ATERIAL 5 Blows per 100 mm
8 ES fi ze FIELD TEST 3 zo & SOIL / ROCK M DESCRIPTION 3 Be pet
3
2 BE) 8 | Be Par #188 g [sat
0.0 S50 TSM] Silty SAND
| 020 fine to medium grained, dark grey, trace of root matter 1
6.30 SP| SAND
1 DS 0.30-0.40m | fine to medium grained, dark grey 1
0.5 4
‘| 070 1
5.80 Silty SAND
1 090 fine to medium grained, dark grey 7
5.60 Indurated SAND J
1.0 T fine to medium grained, dark grey, trace of silt el, 7
1,20 4
5.30 SAND
1 fine to medium grained, dark brown, trace of sitt = 4
2) E1184 160 = 4
3 7 490 indurated SAND 7
E fine to medium grained, dark grey 7
6 4 4
3 2044 4
z 4 4
3 4 4
5 4 =/s 4
g 4 4
| 25-4 4
€ d 4
2
5 4 4
ap | 3.00 a
i END OF [email protected] m d
3.5 om
40 4
45-4 4
5.0 4
55 om
604 cm

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP giNT FN. me

 

 

Page 28

GAPS_1_MDORE.GLB FULL PAGE J\2007\GEOTECHNICAL\077682076\TASK\01_GINTI077682076BH.GPJ_GAPS_1.GOT_30/10/2007_2:47:26 PM.

 

 

€ j.Golder, . REPORT OF BOREHOLE: BH 2

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Starco Developments Pty Ltd COORDS: 508370 m E 7078345mN 56 WGS84 = DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 7m DATUM: AHD DRILLER: Contract Drilling
LOCATION: Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 5/10/07
JOB NO: 077682076 HOLE DIA: 100 mm HOLE DEPTH: 3.00 m CHECKED: hur DATE: Sepio (e+
Drilling Sampling Field Materia! Description
bu a 3
Eg zl), | 8 w le DCP TEST (AS1289.6.3.2)
Slee | xg SAMPLEOR wi? | & SOIL / ROCK MATERIAL DESCRIPTION 5 list Blows per 100 mm
Geel 2 | Be 8/88] 8 giz 065 ttm
Bee S| we pe 2/59] $8 g[se 2 OP
9.0 0.10 *[SM| Silty SAND 4
6.90 SP Mine to medium grained, dark grey, trace of root matter 7
| SAND _ 7
7 fine to medium grained, pale grey q
05 s|2 4
19} 19 : 7
5.90 Silty SAND
1 fine to medium grained, dark grey © 1
Pel a
g 8/157] 160 |_| Y
€ 5.40 Indurated SAND
= 7 fine to medium grained, dark grey, trace of silt : 7
i] 3
2] 204 4
a) 8 1
5 4 4
& 4 4
a 4 4
3 287) 260 J
4.40 SAND
1 fine to medium grained, dark grey and dark brown zla 1
ao | 300 ee J
mm | 400 END OF [email protected] m d
3.5 >
40 4
45 on
5.04 on
5.5 4
6.0 com
| Jot test -L------4 J-L4d- eee | J 4! P-L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore

 

 

 

Page 29

 

 

REPORT OF BOREHOLE: BH 3

 

 

 

 

 

 

 

 

 

 

 

 

 
   

 

GAP5_1_MDORE.GLB FULL PAGE J\2007\GEOTECHNICAL\077682076\TASK\O1_GINTI077682076BH.GP) GAPS5_1.GDT_30/10/2007_ 3:47:28 PM

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

SHEET: 1 OF 4
CLIENT: Starco Developments Pty Ltd COORDS: 508340 m E 7078450mN 56 WGS84_ ~— DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 6.5m DATUM: AHD DRILLER: Contract Drilling
LOCATION: — Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 5/10/07
JOB NO: 077682076 HOLE DIA: 100 mm_ HOLE DEPTH: 3.00m CHECKED: Ate _DATE: BojwfoP
Drilling Sampling Field Material Description
Sw 3 3
eS g 3 wif DCP TEST (AS1289.6.3.2)
3 ee %|z3 SAMPLE OR 3 : & SOIL / ROCK MATERIAL DESCRIPTION 2 BE Blows per 100 mm
Fiza, ] od Oo; so] oO 5 42
B [eg] S| Be Pam #]63| 8 giggh § 2 8 2%
0.0—T-s50 ® Silty SAND. 7
1 fine to medium grained, dark grey, trace of root matter | | 7
=
“| 0.80 | DS 0.40-0.60m 4
0.56.00 SAND 7
1 fine to medium grained, grey, trace of silt 7
1.0 co
4+ 430 4
| 520 Silty SAND 7
Q 3 15 fine to medium grained, dark grey J
Ee 4.60 4
2 4.90 Indurated SAND
= 1 fine to medium grained, dark grey, trace of silt z 7
8 | 20 4
5 4 4
5 4 4
3| 4 J
2
3 4 4
Oo | 254 ~|
an | 300 4
we | 3:50 END OF [email protected] m 4
3.5 >
4.0 -
45-4 4
5.0] 4
55
6.0 an
| Jollet -L-----_1ij 4 [oo ee | Joe t-te bb

 

 

 

 

 

 

 

 

 

GAP gINT FN. F01b
RL2

 

 

Page 30

GINTO77682076BH.GPJ GAPS_1.GDT 30/10/2007 3:47:30 PM

GAPS_1_MDORE.GLB FULL PAGE J\2007\GEOTECHNICAL\077882076\TASKIO1

 

REPORT OF BOREHOLE: BH 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Starco Developments Pty Ltd COORDS: 508315 m E 7078380 mN 56 WGS84__—s DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 4.5m DATUM: AHD DRILLER: Contract Drilling
LOCATION: Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 5/10/07
JOB NO: 077682076 HOLE DIA: 100 mm HOLE DEPTH: 3.00m CHECKED: Avs DATE: $o/te/oF
Drilling Sampling Field Material Description
Bu 9 3
eo a 3 w |e DCP TEST (AS1289.6.3.2)
8léhel sz SAMPLEQR [w/2 | & SOIL / ROCK MATERIAL DESCRIPTION Slee Blows per 100 mm
= pol a| 28 FIELDTEST 13 z,|2 e |@E
ZO! a6 9 5 lz4
2 \e8] $ | BE Par #/53| 3 ear 2 7 8 2 %
0.07 aa0 Silty SAND
1 fine to medium grained, dark grey 1
‘| 0.40 | DS 0.30-0.40m 7
4.40 SAND eT | 7
05 fine to medium grained, pale grey 7
too} ep EL 1
| 10 3.60 becoming grey 4
& 4 4
3 4 4
é 4w0f 0 ‘| Pp LoL 4
5 J 320 becoming dark grey, trace of silt J
g B] 15-4 7
g 4 4
i zfe
5 4 4
5 4 4
S| 20-4 4
§ 4 4
2
5 4 4
254 oa 4
J 1-90 indurated SAND
1 fine to medium grained, dark grey, trace of silt = 1
=
ag | 300 a" J
an END OF [email protected] m d
3.5 4
40 4
454 4
5.0 on
554 4
6.04 ~
Pp jot ites J LH ____ Jot Pod | _

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fol

 

 

 

Page 31

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAP5_1_MDORE.GLB FULL PAGE_J\2007\GEOTECHNICALN077682076\TASK\01_GINT\077682076BH.GPJ_GAPS_1.GDT_30/10/2007_3:47:33 PM.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Me etes
SHEET: 1 OF 1
CLIENT: Starco Developments Pty Ltd COORDS: 508271 mE 7078240mN 56 WGS84 DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 2.6m DATUM: AHD DRILLER: Contract Drilling
LOCATION: — Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 4/10/07
JOB NO: 077682076 HOLE DIA: 100 mm HOLE DEPTH: 6.00 m CHECKED: At® _ DATE: 30 jie jor
Drilling Sampling Field Material Description
Sw 9 8
Eg # 3 ws DCP TEST (AS1289.6.3.2)
S\éele| oe SAMPLEOR Jw) 2 | & SOIL / ROCK MATERIAL DESCRIPTION 5 lee Blows per 100 mm
2 (Go) G| £8 FIELDTEST |3|/z | @ aaa
IZ oo oO O;o 4
u |pe] S| Be PR #|88|2 gigae 8
OT ri SM] Silty SAND (FILL) [2]
2.40 CH fine to medium grained, dark grey, trace of roots 7
7 DS 0.20-0.30m Sandy CLAY (FILL) 7
4 high plasticity, pale grey, trace of fine grained sand 7
5 T o60 =}y 7
T1890 CH Silty CLAY (FILL) 1
1 high plasticity, pale grey and red J
1.0—- 110 4
eS 7.40 Clayey SAND 1
3 1 1.30 fine to medium grained, dark grey, trace of roots - 1
E [20 ‘Sandy Silty CLAY | 1
= medium to high plasticity, dark grey, fine to medium o 7
5 1.5 1.60 grained sand 7
g 0.90 Clayey SAND y | ]
5 4 fine to medium grained, dark grey z 7
8 7 2 7
S| 204 = 4
= 4 al 4
z 1 J
2
0 4 4
2.40 4
0.10 Silty CLAY
25-7 high plasticity, dark grey q
Kk 4
4 —s . 4
J ps2.802.90m  fg— é ]
=| 7
2 3.0 7 Ty
1 320 Pa |_| Augered out to 3.1m 1
~0.70 Lx |
4 i, 4
4 le 4
3.5 4
4 kk 4
1 DS 3.80-3.90m a, 7
40-4 a 4
4 1 —3 4
4 <— = 4
4 Ix | 4
45 4 z 4
4 g 4
4 a 4
1 DS 4.70-4.80m 1
50 4
5.54 >
| 6.00 _
6873.50 END OF [email protected] m |
| Jottest -L-----_44 —jt eee [Iie 4d J_-L__L_d
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. roe

 

 

Page 32

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bee...
SHEET: 1 OF 1
CLIENT: Starco Developments Pty Ltd COORDS: 508418 m E 7078180 mN 56 WGS84 = DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 7m DATUM: AHD DRILLER: Contract Drilling
LOCATION: — Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 5/10/07
JOB NO: 077682076 HOLE DIA: 100 mm HOLE DEPTH: 3.00m CHECKED: DATE: 38/@/{oh
Drilling Sampling Field Material Description
Foam 2 3
EQ uw 3 w a DCP TEST (AS1289.6.3.2)
Blt el og SAMPLEQR jul | § SOIL / ROCK MATERIAL DESCRIPTION 5 loz Blows per 100 mm
Glee el as 3/82 3 Slag 5 0 tt
2 lee) S| Se RTH zZ|oS| 3 $[sa
0.0700 = TSM] Silty SAND
1 fine to medium grained, grey, trace of roots 7
9.30 4
6.70 SAND 4
1 fine to mediurn grained, pale grey Jd
087 DS 0.50-0.60m :
4 o 4
10 = 4
4 sL 4
2 15 4
Tao} |] ee 7
J 530 becoming brown 4
20 4
4 o 4
Teo) BT LL 1
vs 460 [becoming dark brown, trace of silt
a] 25
3 4 4
=| 4 = ]
a J 4
3
= BL. 1 300 . |
5 3 | 4.00 END OF [email protected] m "T
Al lel !
| lal | |
| [eles 4
zl J J
g
é 7 4
g 40-4 4
a ~ q
g 1 1
g 7 4
2 4 4
3 454 on
g 1 |
é
§ 1 4
Ee]. 5.0 4
8 4 4
& 4 4
Z
5 4 4
E 4 4
2 | 4
8 5.5 : 1
y 4 4
& 4 4
5 6.0 7 7
3
g 4 4
: 1
= J_oL_ 5 -Li ts ae Jj 4__t__ Pt
‘ $:
& This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
6 geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 33

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Starco Developments Pty Ltd COORDS: 508312 m E 7078187 mN 56 WGS84_ —— DRILL RIG: Edson CP1
PROJECT: Precinct J SURFACE RL: 4m DATUM: AHD DRILLER: Contract Drilling
LOCATION: Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 5/10/07
JOB NO: 077682076 HOLE DIA: 100 mm HOLE DEPTH: 3.00m CHECKED: Aro DATE: o/tefod
Drilling Sampling Field Material Description
z >
Ou a - oO
=o SAMPLE OR wy © 3 w iS DCP TEST (AS1289.6.3.2)
BlEE a | ee Fietptest |S1= 1 SOIL / ROCK MATERIAL DESCRIPTION p [Be Blows per 700 mm
Ee) B| Es 85013 ele, 5
2 lee] S| BE RM #188/8 g Bar pe 2 %
0.0406 Silty SAND 4
| 020 fine to medium grained, dark grey, trace of roots 7
| 3:80 [becomingdarkgrey  =—=—“‘“‘S~*S*‘“‘™S™*~*~*™ | 1
| g 4
0.50
05-1350 SAND ro 7
1 fine to medium grained, pale grey 7
J = 4
1.04 4
| ° 4
3 1544 4
Taf TE EL 7
7 230 becoming grey 4
4 s 4
20 = om
| 220 ]
ea 180 indurated SAND 1
3 7 fine to medium grained, dark grey, trace of silt 7
E
a | 255 =/8 4
= 4 4
E ‘| 280 J
5 4.20 Sandy CLAY 3).
z 81.4 | 300 medium plasticity, dark grey =)? 7
g 3 we | 400 END OF [email protected] m T
5 2/4] 1
sg 8 7 7
5| 5 | a
t 3.5 4
5 1 1
@| 4 4
g J 4
é sol 1
g 4 4
é 1 ]
9 45 4
é | 1
6 4 4
z 7 4
6 4 4
= 4 4
5 4 4
a | -
2 5.5 : :
5 4 4
y 4 4
= 4 4
3 6.0 _
ry 7) 4
3 4 4
z 4 4
8 4 4
FL IL _tes -L---- ~~ — tee } J t__] J__L__L_
: 5
& This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
o geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. For

 

 

Page 34

 

Ors.

REPORT OF BOREHOLE: BH 8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS5_1_MDORE.GLB FULL PAGE J\2007\GEOTECHNICAL\077682076\TASK\01_GINTIO77682076BH.GPJ_GAPS_1.GDT_30/10/2007_3:47:40 PM.

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Starco Developments Pty Lid COORDS: 508255 m E 7078200 mN 56 WGS84 DRILL RIG: Edson CP1
PROJECT: SURFACE RL: 1m DATUM: AHD DRILLER: Contract Drilling
LOCATION: Noosa Springs INCLINATION: -90° LOGGED: PGH DATE: 4/10/07
JOB NO: HOLE DIA: 100 mm HOLE DEPTH: 6.00 m CHECKED: A-Ve __DATE: Bajio/e
Drilling Field Material Description
Bu 2 = B
Eo w 3 w |Z DCP TEST (AS1289.6.3.2)
o |<2 ° oe |e
SEE & ze 3 z= & SOIL / ROCK MATERIAL DESCRIPTION p [Be Blows per 100 mm
= [eal] & oO] sealo g lege
w lee] s | Be #188 /8 gia §
0.0 =TSC] Clayey SAND
] fine to medium grained, dark grey 1
4 4 4
05 > 4
] [becomingpalegrey =—S=C=~Csé‘sS*‘“‘;™SC~* 71
| ‘Sandy CLAY | 7
1.0 1 medium plasticity, grey, fine to medium grained sand y
| z 4
=
v- 156 Silty CLAY 1
s | high plasticity, dark grey, trace of broken shells J
= 7 o 7
z 4 4
3 4 4
@
2) 20 4
5
8 7 4
5 4 4
5 4 4
é 4 4
2 | 25-] 4
ey; [Becoming pale grey, orange brown and red ]
2 3.0 4
3.55 4
40 4
4 x 1
4 2 4
4 6 4
45 4
5.05 4
55-4 4
| END OF [email protected] m a”
| Jotilggt -L-----_-ti_ a | Jot —~-t—-L__-L_4

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. rep

 

 

 

 

 

 

 

 

 

 

Page 35

 

 

e EXPLANATION OF NOTES, ABBREVIATIONS & TERMS
= Golder
Associates USED ON BOREHOLE AND TEST PIT REPORTS

 

DRILLING/EXCAVATION METHOD

AS* Auger Screwing RD Rotary blade or drag bit HQ Diamond Core - 63 mm

AD* Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm

"vy V-Bit RAB Rotary Air Blast NQ Diamond Core - 47 mm

‘T TC-Bit, e.g. ADT RC Reverse Circulation BH Tractor Mounted Backhoe
HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator
DTC _ Diatube Coring CT Cable Tool Rig EE Existing Excavation

WB Washbore or Bailer JET Jetting HAND Excavated by Hand Methods

 

PENETRATION/EXCAVATION RESISTANCE
L Low resistance. Rapid penetration possible with little effort from the equipment used.
M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used.

H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires
significant effort from the equipment.

R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to
the digging implement or machine.

These assessments are subjective and are dependent on many factors including the equipment power, weight, condition
of excavation or drilling tools, and the experience of the operator.

 

WATER
3 Water level at date shown <J Partial water loss
Cc Water infiow <q Complete water loss
GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling
OBSERVED water, surface seepage or cave in of the borehole/test pit.

GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be
ENCOUNTERED present in less permeable strata. Inflow may have been observed had the borehole/test pit
been left open for a longer period.

 

 

 

 

 

 

 

SAMPLING AND TESTING

SPT Standard Penetration Test to AS1289.6.3.1-1993

4,7,11 N=18 4,7,11 = Blows per 150mm. _N = Blows per 300mm penetration following 150mm seating

30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported

RW Penetration occurred under the rod weight only

HW Penetration occurred under the hammer and rod weight only

HB Hammer double bouncing on anvil

DS Disturbed sample

BDS Bulk disturbed sample

G Gas Sample

w Water Sample

FP Field permeability test over section noted

FV Field vane shear test expressed as uncorrected shear strength (sy = peak value, s, = residual value)

PID Photoionisation Detector reading in ppm

PM Pressuremeter test over section noted

PP Pocket penetrometer test expressed as instrument reading in kPa

U63 Thin walled tube sample - number indicates nominal sample diameter in millimetres

Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects)
R=0 No visible evidence of contamination R=A No non-natural odours identified
R=1 Slight evidence of visible contamination R=B Slight non-natural odours identified
R=2 Visible contamination R=C Moderate non-natural odours identified
R=3 Significant visible contamination R=D Strong non-natural odours identified

ROCK CORE RECOVERY

TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%)

= Length of core recovered x100 - > Length of cylindrical core recovered x100 - Axial lengths of core > 100mm x100
Length of core run Length of core run Length of core run

 

 

GAP Form No. 6
RL4

Page 36

 

METHOD OF SOIL DESCRIPTION

 

 

 

 

 

 

 

 

 

 

 

 

Golder
Associates USED ON BOREHOLE AND TEST PIT REPORTS
FILL + _—_} CLAY (CL, Cl or CH)
Fe 29) GRAVEL (GP or GW) x* 4 ORGANIC SOILS (OL or OH or Pt)
o°q ly dy
Po oe _
“=| SAND (SP or SW) a COBBLES or BOULDERS
° o
Do.

 

 

 

 

 

yx] SILT (ML or MH)

 

 

 

Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay.

 

CLASSIFICATION AND INFERRED STRATIGRAPHY
Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in
AS1726 — 1993, Appendix A. The material properties are assessed in the field by visual/tactile methods.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Particle Size Plasticity Properties
Major Division | Sub Division Particle Size 40
BOULDERS > 200 mm cH
COBBLES 63 to 200 mm = 3 cow Sitety tn eye
Coarse 20 to 63 mm = oy clay
GRAVEL Medium 6.0 to 20 mm 3 20
Fine 2.0 to 6.0 mm 2 ign i it
Coarse 0.6 to 2.0mm 2 *
SAND Medium 0.2 to 0.6 mm a 10 A | eee
Fine 0.075 to 0.2 mm ST ‘en
SILT 0.002 to 0.075 mm 9 +
0 40 20 30 40 50 60 70 80
CLAY < 0.002 mm Liquid Limit (%)
MOISTURE CONDITION AS1726 - 1993
Symbol Term Description
D Dry Sands and gravels are free flowing. Clays & Silts may be brittle or friable and powdery.
M Moist Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere.
WwW Wet Soils exude free water. Sands and gravels tend to cohere.
CONSISTENCY AND DENSITY AS1726 - 1993
Symbol Term Undrained Shear Symbol Term Density Index % SPT “N’ #
Strength
VS Very Soft 0 to 12 kPa VL Very Loose Less than 15 0 to4
Ss Soft 12 to 25 kPa L Loose 15 to 35 4to 10
F Firm 25 to 50 kPa MD Medium Dense 35 to 65 10 to 30
St Stiff 50 to 100 kPa D Dense 65 to 85 30 to 50
vst Very Stiff 100 to 200 kPa VD Very Dense Above 85 Above 50
H Hard Above 200 kPa

 

 

 

 

 

 

 

 

 

In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of
the material.

# SPT correlations are not stated in AS1726 — 1993, and may be subject to corrections for overburden pressure and
equipment type.

 

 

GAP Form No. 5
RL7

Page 37

Appendix B

Geotechnical Laboratory Test Results

Page 38

 

Geotech (8.C.) Pty Ltd

ACN 074 982 979 ABN 39 074 982 979

 

Geotechnical Testing Authority

3 Bearing Ave

Warana Qld 4575

PO Box 2

Buddina Qld 4575

Telephone: (07) 5493 1733
Facsimile: (07) 5493 6019
Email: [email protected]

 

Particle Size Distribution Report

 

 

Client:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Golder Associates Pty. Ltd. Report Number: G7003 - 295
Client Address: P.O. Box 5569 Maroochydore BC Qld. 4558
Job Number: G7003 Report Date: 30/10/2007
Project: Lab. Testing Project No:077682076 Order Number:
Location Development fro Starco P/L, Noosa Springs Page i of £
Lab No: 75314 Sample Location
Date Sampled: 04/10/2007 Bore 1
Date Tested: 29/10/2007 Depth 0.3 - 0.4m
Sampled By: Client
Sample Method:
Material Source: Site
For Use As: - Lot Number: -
Remarks: : Spec Number: -
A.S. Sieve Sizes Specification Percent Passing {Specification
Minimum Maximum
Test Method: AS1289.3.6.1
75.0mm
i i i i 63.0mm
; + : : 53.0mm
: ; i * 37.5mm
oH i
L i [ i 26.5mm
! i 19.0mm
; ; 7 i 16.0mm
ae f 13.2mm
ae : 7 : 9.5mm
j ; : ' 6.7mm
: 4 i 4.75mm
: i 7 : 2.36mm
: 1 { 1.18mm
; i H 0.600mm
H : t 0.425mm
SS t 0.300mm
On7S 1190 assonsui 0x0 045 0600 0.150mm
0.075mm
Approved Signatory |Form Number
NATA This document is issued in accordance with NATA's accreditation

a

WORLD RECOGNIsED
ACCREDITATION

 

requirements.Accredited for compliance with ISO/IEC 17025.This
document shall not be reproduced except in full.

 

ar 23 REP APSD-1-4
Mel Burnett

NATA Accred No:1551

 

°@ N.A.T.A. Accredited Soil Laboratory «@e Roadworks & Subdivision Testing *@* Aggregate & Quarry Product Testing *@* Earthworks Supervision @+

 

 

Page 39

Geotech (S.C.} Pry Btel  acn 074 982979 ABN 39 074 982 979

 

Geotechnical Testing Authority

3 Bearing Ave
Warana Qld 4575
PO Box 2
Buddina Q!d 4575

Telephone: (07) 5493 1733
Facsimile: (07) 5493 6019
Email: [email protected]

 

Particle Size Distribution Report

 

 

Client:

 

For Use As:

 

Remarks:

 

 

Golder Associates Pty. Ltd. Report Number: G7003 - 296
Client Address: P.O. Box 5569 Maroochydore BC Qid. 4558
Job Number: G7003 Report Date: 30/10/2007
Project: Lab. Testing Project No:077682076 Order Number:
Location Development fro Starco P/L, Noosa Springs Page 1 of 1
Lab No: 75315 Sample Location
Date Sampled: 04/10/2007 Bore 3
Date Tested: 29/10/2007 Depth 0.4 - 0.5m
Sampled By: Client
Sample Method:
Material Source: Site

Lot Number: -

Spec Number: -

 

  

A.S. es

 

inimum
Test Method: AS1289.3,.6.1

75.0mm
63.0mm
53.0mm
37.5mm
26.5mm
19.0mm
16.0mm
13.2mm
9.5mm
6.7mm
4.75mi
2.36m
1.18m
0.600m
0.425m
0.300m
0.150m
0.075m:

Percent Passing

 

jaximum

 

on
NATA.
a

WORLD RECOGNISED
ACCREDITATION

 

 

This document is issued in accordance with NATA's accreditation
requirements.Accredited for compliance with ISO/IEC 17025.This
document shall not be reproduced except in full.

 

Approved Signatory |Form Number

WN 2) REP APSD-1-4

Mel Burnett
NATA Accred No:1551

 

°@ N.A.T.A. Accredited Soil Laboratory «@» Roadworks & Subdivision Testing ¢@+ Aggregate & Quarry Product Testing «@« Earthworks Supervision @>

 

 

Page 40

 

Geotech (S.C.} Pty ted = acno74 982 979 ABN 39 074 982 979

 

Geotechnical Testing Authority

3 Bearing Ave

Warana Qld 4575

PO Box 2

Buddina Qld 4575

Telephone: (07) 5493 1733
Facsimile: (07) 5493 6019
Email: [email protected]

 

Particle Size Distribution Report

 

 

 

Client: Golder Associates Pty. Ltd. Report Number: G7003 - 297
Client Address: P.O. Box 5569 Maroochydore BC Qld. 4558

Job Number: G7003 Report Date: 30/10/2007
Project: Lab. Testing Project No:077682076 Order Number:

Location Development fro Starco P/L , Noosa Springs Page 1 of 1

Lab No: 75316 Sample Location

Date Sampled: 04/10/2007 Bore 4

Date Tested: 29/10/2007 Depth 0.3 - 0.4m

Sampled By: Client

Sample Method:

Material Source: Site

For Use As:

Remarks:

Lot Number: -

Spec Number: -

 

 

A.S. Sieve Sizes Specification

Minimum

Test Method: AS1289.3.6.1

Percent Passing {Specification
Maximum

 

75.0mm

 

 

po 63.0mm

 

 

vi

 

53.0mm

 

 

37.5mm

 

 

 

 

Co 26.5mm

 

19.0mm

 

 

16.0mm

 

 

13.2mm

 

 

 

9.5mm

 

 

Percent Passint%)

6.7mm

 

4.75mm

 

 

 

2.36mm

 

 

1.18mm

 

0.600mm

 

 

 

 

 

0.425mm

 

 

 

 

 

 

i H i : 0.300mm
me 04s fr) 148 0.150mm

 

0.075mm

 

 

 

 

 

 

 

 

 

 

@)

WORLO RECOGNISED
ACCREDITATION

‘This document is issued in accordance with NATA's accreditation
requirements.Accredited for compliance with ISO/IEC 17025.This
document shall not be reproduced except in full.

 

Approved Signatory }Form Number

REP APSD-1-4
Mel Burnett

NATA Accred No:1551

 

 

[email protected]. Accredited Soil Laboratory *@+ Roadworks & Subdivision Testing «@»* Aggregate & Quarry Product Testing »@* Earthworks Supervision @>

 

 

Page 41

Geotech (S.C.) Pag Ltd acnozs82979 Asn 39074 982 979

 

Geotechnical Testing Authority

3 Bearing Ave

Warana Qld 4575

PO Box 2

Buddina Qld 4575

Telephone: (07) 5493 1733
Facsimile: (07) 5493 6019
Email: [email protected]

 

Quality of Materials Report

 

 

Client:
Client Address:
Job Number:

Golder Associates Pty. Ltd.
P.O. Box 5569 Maroochydore BC Qid. 4558

G7003

Report Number: G7003 - 299

Report Date: 30/10/2007

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project: Lab. Testing Project No:077682076 Order Number: -
Location Development fro Starco P/L , Noosa Springs Page 1 of 1
Lab No: 75317 Sample Location
Date Sampled: 04/10/2007 Bore 5
Date Tested: 29/10/2007 Depth 0.2 - 0.3m
Sampled By: Client
Sample Method:
Materia! Source: Site Spec Description: -
For Use As: - Lot Number: -
Remarks: : Spec Number: :
A.S. Sieve Sizes Specification Percent Specification
Minimum Passing Maximum
Test Method: AS1289.3.6.1
75.00 mm
53.00 mm
37.50 mm
26.50 mm
19.00 mm
13.2 mm
9.50 mm
6.7 mm
4.75 mm
2.36 mm
1.18 mm
0.600 mm
0.425 mm
0.300 mm
0.150 mm
0.075 mm 64
Atterberg Tests Test Method Specification Result Specification
Minimum Maximum
Liquid Limit (%) AS1289.3.1.2 53
Plastic Limit (%) AS1289.3.2.1 _16
Plasticity Index AS1289.3.3.1 37
Linear Shrinkage (%) AS1289.3.4.1 14.5
P.I. x % Passing 0.425 mm
™. Approved Signatory Form Number
This document is issued in accordance with NATA's
NATA accreditation requirements.Accredited for compliance KRY OD
Vv with ISO/IEC 17025.This document shall not be REP AQUAL-1-5
womis necoaness reproduced except in full. Mel Burnett
accneprrarion NATA Accred No:1551

 

¢@ N.A.T.A. Accredited Soil Laboratory «@» Roadworks & Subdivision Testing »@* Aggregate & Quarry Product Testing ¢@+ Earthworks Supervision @+

 

Page 42

Geotech (S.C.} Pty Httel = acn074 982979 ABN 39 074 982 979

CT-yealig-Tal

Geotechnical Testing Authority

3 Bearing Ave

Warana Qld 4575

PO Box 2

Buddina Qld 4575

Telephone: (07) 5493 1733
Facsimile: (07) 5493 6019
Email: [email protected]

 

Particle Size Distribution Report

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Client: Golder Associates Pty. Ltd. Report Number: G7003 - 298
Client Address: P.O. Box 5569 Maroochydore BC Qid. 4558
Job Number: G7003 Report Date: 30/10/2007
Project: Lab. Testing Project No:077682076 Order Number:
Location Development fro Starco P/L , Noosa Springs Page 1 of 1
Lab No: 75318 Sample Location
Date Sampled: 04/10/2007 Bore 6
Date Tested: 29/10/2007 Depth 0.5 - 0.6m
Sampled By: Client
Sample Method:
Material Source: Site
For Use As: - Lot Number: -
Remarks: - Spec Number: -
AS. Sieve Sizes Specification Percent Passing Specification
Minimum Maximum
Test Method: AS1289.3.6.1
75.0mm
i i 63.0mm
at 1 53.0mm
ar i 37.5mm
*L Li 26.5mm
™ t : 19.0mm
1 16.0mm
5 13.2mm
i } 9.5mm
i r 6.7mm
4.75mm
2.36mm
? 1.18mm
if 0.600mm
i 0.425mm
ot TT : 0.300mm
0075 0150 0x0 1550 Sen 00 ANB 2% 0. 150mm
0.075mm

 

 

 

 

 

 

 

 

 

 

@

WORLD RECOGNISED
ACCREDITATION

 

This document is issued in accordance with NATA's accreditation
requirements.Accredited for compliance with ISO/IEC 17025.This
‘document shall not be reproduced except in full.

 

Approved Signatory |Form Number

REP APSD-1-4
Mel Burnett

NATA Accred No:1551

 

 

°@ N.A.T.A. Accredited Soil Laboratory «@* Roadworks & Subdivision Testing »@» Aggregate & Quarry Product Testing «@* Earthworks Supervision @«

 

 

Page 43

Geotech (8.C.) Ptay Lted cn ozs 982979 Asn 39 074 982 979 3 Bearing Ave
Warana Qld 4575

| y i PO Box 2
a a "cc Buddina Qld 4575

a : e Telephone: (07) 5493 1733
Geotechnical Testing Authority Facsimile: (07) 5493 6019
Email: [email protected]

Kawana Laboratory
Author: Mel Burnett
Project No: G7003

Certificate Number: G7003-289
Date Tested: 30 October, 2007

30 October, 2007

Golder Associates
P O Box 5569
Maroochydore Qid 4558
Dear Sir,
RE: Certificate of Laboratory Testing — Development Noosa Springs
1.0 Laboratory Work

Determination of the Emerson Class No. of a Soil (Test Procedure AS1289.3.8.1)
2.0 Laboratory Results

All results are contained in Table 1 below.

 

 

 

 

 

Table 1
Sample No. 75314 75315 75316
Location Bore 1 Bore 3 Bore 4
Depth (m) 0.3-0.4 0.4-0.5 0.3-0.4
Emerson Class No: 6 8 8
Type of Water Distilled Distilled Distilled

 

 

 

 

 

 

We trust the above meets your requirements, however, should you have any queries, please do not hesitate
to contact Mel Burnett at our Kawana laboratory.

Yours faithfully,

Wt A

This Laboratory is accredited by the National Association of
MLN. Burnett NATA Testing Authorities, Australia. The test(s) reported herein have
Director Ww been performed in accordance with its scope of accreditation.
GEOTECH (SC) PTY LTD wort necoouses “THiS document shall not be reproduced, except in full.

ACCREDITATION

°@ N.A.T.A. Accredited Soil Laboratory «@* Roadworks & Subdivision Testing «@° Aggregate & Quarry Product Testing ¢@* Earthworks Supervision @+

Page 44

Appendix C

Table C1 Summary of ASS Field & Laboratory Analysis
Results
Environmental Laboratory Test Results (Soil)

Page 45

October 2007                                                                                                                                       Starco/Subdivision/Noosa Springs                                                                                                                      077682076



                                                                                 TABLE C1 - SUMMARY OF ACID SULFATE SOIL FIELD AND LABORATORY ANALYSIS RESULTS

                                                                               Quick Screening Test                         Lab pH              Sulfur Trail                              Acid trail                   Acid Neutralising Capacity      Retained   Acid - Base        Required
PointID   Depth                       Description                        pHF          pHFOX1     Reaction Remark        pHKCl pHOX       SKCL       SP       SPOS2    Scr²       a-S       TAA2 TPA2 TSA       Ca-A       Mg-A a-CaA+a-MgA ANC-E        SNAS       Account3          Lime Rate 4
           (m)                                                                                                                                      (%S)              (%S)     (mH+/t)        (mol H+/tonne)   (%Ca)    (%Mg)    mol H+/t   mol H+/t   mol H+/t    mol H+/t     kg CaCO3/t kg CaCO3/m3
BH5        0.25    Sandy CLAY (FILL) pale grey                           5.0            3.4           1
           0.50                                                          5.2            3.2           1                   4.9                                        <0.02       0          21                                                                        21           1.6          3
           0.75    Silty CLAY (FILL) pale grey and red                   5.1            3.1           1
           1.00                                                          4.4            2.6           1
           1.25    Clayey SAND dark grey, trace of roots                 4.3            2.2           1
           1.50    Sandy Silty CLAY, dark grey                           4.3            2.1           1
           1.75    Clayey SAND, dark grey                                4.4            1.9           1                   4.7                                        <0.02       0          58                                                                        58           4.4          8
           2.00                                                          4.7            2.0           1
           2.25                                                          5.0            1.3           2                   4.7                                         0.45      281         66                                                                       347          26.0          47
           2.50    Silty Clay, dark grey                                 6.0            1.4           3
           2.75                                                          6.5            2.4           3
           3.00                                                          6.6            2.9           5
BH8        0.25    Clayey SAND, dark grey                                5.8            3.8           1
           0.50                                                          4.8            3.4           1                                                              <0.02       0           9                                                                       <10           <1           <1
           0.75    becoming pale grey                                    5.1            2.6           1                   5.4
           1.00    Sandy CLAY, grey                                      5.6            2.2           1
           1.25                                                          6.1            1.9           2
           1.50    Silty CLAY, dark grey, trace shells                   6.3            1.7           2
           1.75                                                          6.4            1.3           4                   7.5                                         1.17      730         <2                                                262                    730          54.8          99
           2.00                                                          6.9            4.2           3
           2.25                                                          6.8            1.3           3
           2.50                                                          6.8            3.5           3
           2.75    becoming pale grey                                    6.8            3.0           3
           3.00                                                          6.8            1.9           5                   5.1                                         0.04       25         11                                                                        36           2.7          5
          Notes:
                   1. Shaded pHFOX results are those where there is a drop of 2.0 or more pH units (light shade) or where the pH FOX is less than 3.0 (darker shade) after oxidisation.
                   2. Shaded TAA, TPA, & S CR results are those exceeding the QASSIT action levels of 18 mol H +/t or 0.03 %S.
                   3. Acid-Base Account = Total Acidity (ie. Potential + Actual + Retained), not including ANC, but not less than TSA
                   4. Required Lime Rate is calculated from the net Acid-Base Account with a factor of safety = 1.5 and bulk density of 1.8 t/m³




                                                                                                                                                           Golder Associates

Page 46

 

ALS Environmental

 

 

 

 

 

 

 

CERTIFICATE OF ANALYSIS

Client ! GOLDER ASSOCIATES Laboratory : Environmental Division Brisbane Page : 10f5
Contact : MR DANIEL JOYCE Contact : Tim Kilmister Work Order : EB0711624
Address : PO BOX 5569 MAROOCHYDORE SOUTH Address : 32 Shand Street Stafford QLD Australia 4053
QLD AUSTRALIA 4558
E-mail : [email protected] E-mail : [email protected]
Telephone : 6443 3511 Telephone | +61-7-3243 7222
Facsimile : 5443 6645 Facsimile : 461-7-3243 7218
Project : 077682076 STARCO SUBDIV NOOSA Quote number : EN/002/05 Date received : 10 Oct 2007
Order number : MQ4752 Date issued 2 19 Oct 2007
C-O-C number : « Not provided - No. of samples - Received : 6
Site : + Not provided - Analysed : 6

i

ALSE - Excellence in Analytical Testing

     

 

   

This document has been electronically signed by those names that appear on this report and are the authorised signatories. Electronic
signing has been carried out in compliance with procedures specified in 21 CFR Part 11.

Signatory Position Department
Jessica Garwood Supervisor - Acid Sulphate Soils Inorganics - NATA 825 (818 - Brisbane)

NATA Accredited Laboratory
m™ “

This document is issued in
NA I A accordance with NATA's

accreditation requirements.

Accredited for compliance with

WORLD AEGOGHISED
ACCREDITATION ISO/IEC 17028.

Page 47

 

 

 

 

 

 

 

 

 

 

 

Page Number :20f5

Client : GOLDER ASSOCIATES L
Work Order : EBO711624 aL’ Sruironmenke
Comments

This report for the ALSE reference EB0711624 supersedes any previous reports with this reference. Results apply to the samples as submitted. All pages of this report have been checked and
approved for release.

This report contains the following information:

e Analytical Results for Samples Submitted
e@ Surrogate Recovery Data

The analytical procedures used by ALS Environmental have been developed from established internationally-recognized procedures such as those published by the US EPA, APHA, AS and NEPM. In
house developed procedures are employed in the absence of documented standards or by client request. The following report provides brief descriptions of the analytical procedures employed for
results reported herein. Reference methods from which ALSE methods are based are provided in parenthesis.

When moisture determination has been performed, results are reported on a dry weight basis. When a reported ‘less than’ result is higher than the LOR, this may be due to primary sample
extracts/digestion dilution and/or insuffient sample amount for analysis. Surrogate Recovery Limits are static and based on USEPA SW846 or ALS-QWI/EN38 (in the absence of specified USEPA
limits). Where LOR of reported resutt differ from standard LOR, this may be due to high moisture, reduced sample amount or matrix interference. When date(s) and/or time(s) are shown bracketed,
these have been assumed by the laboratory for process purposes. Abbreviations: CAS number = Chemical Abstract Services number, LOR = Limit of Reporting. * Indicates failed Surrogate
Recoveries. :

Specific comments for Work Order EB0711624

Liming rate is calculated and reported on a dry weight basis assuming use of fine agricultural lime (CaCO3) and using a safety factor of 1.5 to allow for non-homogeneous mixing and poor reactivity
of lime. For conversion of Liming Rate from ‘kg/t dry weight’ to ‘kg/m in-situ soil’, multiply ‘reported results’ x ‘wet bulk density of soil in t’m3’.
Retained Acidity not required because pH KC! greater than or equal to 4.5

Page 48

 

 

 

 

 

 

 

 

 

Page Number 1 30f5

Client ‘ GOLDER ASSOCIATES {ALS
Work Order :_EB0711624 ale Sragrareuenkad

         
    
  
   
   
 
  

  
     
 

~BH8.

     

   
  
   
    

Client Sample ID : BHS: 2 BHB : BH5 ‘BH8

 

    
   
     
  

    

Analytical Results osm 4.75m |) 228m 075m 4:75m
Sample Matrix Type / Description : SOIL SOIL SOIL SOIL SOIL
Sample Date / Time : 8 Oct 2007 8 Oct 2007 8 Oct 2007 8 Oct 2007 8 Oct 2007

    

15:00 15:00 15:00 15:00 15:00

Laboratory Sample ID :

Analyte CAS number LOR Units

    

    
  

     
 

EB0711624-001 £B0711624-002 EB0711624-003 EB0711624-004 EB0711624-005

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EA033-A: Actual Acidity oe 2088 ee 4 : : 3 : 3
pH KCI (23A) pH Unit : 49 47 47 5A 75
Titratable Actual Acidity (23F) 2 moleH+/t 21 58 66 9g <2
sulfidic - Titratable Actual Acidity 0.02 % pyrite S 0.03 0.09 0.10 <0,02 <0.02
(8-23F) :
EA033-B: Potential Acidity” i ae : / oo a Se

Chromium Reducible Sulfur (22B) 0.02 %*S~ : <0,02 <0.02 0.45 <0,02 1.17
acidity - Chromium Reducible Sulfur 10 mole H+/t <10 <10 281 <10 730
(@-22B) 5
EA033-C: Acid Neutralising Capacity See ee : : : be

Acid Neutralising Capacity (19A1) ‘ 0.01 % CaCO3 — : _ _ = 1.31
acidity - Acid Neutralising Capacity . 10 mole H+/t —_ —_ _ —_ 262
(@-19A1) QU a

sulfidic - Acid Neutralising Capacity 0.01 % pyrite S —_ — _ _ 0.42
(s-19A1) ee
EA033-E: Acid Base Accounting DL eee ge : :

ANC Fineness Factor . 0.5 1.5 1,5 15 1.5 1,5
Net Acidity (sulfur units) =” 0.02 %S 0.03 0.09 0.56 <0,02 0.89
Net Acidity (acidity units) 10 mole H+/t 21 58 347 <10 555
Liming Rate 1 kg CaCO3/t 2 4 26 <1 42

 

 

 

NTL

A Carapivel! Brothers Limited Company

Page 49

Client Sample ID :

Page Number :40f5

Client : GOLDER ASSOCIATES
Work Order 2 EBO711624
Analytical Results

   

£A033-A: Actual Acidity -

 

Sample Matrix Type / Description :
Sample Date / Time :

CAS number

“04

Laboratory Sample ID :

  
 

pH Unit

 

'BHE
3m
SOIL
8 Oct 2007
15:00

 

EB0711624-006

 

SL Erevlrarmmnieal

   

  
 
  

   
  
 
 

   
 
 
 

 

   

 

 

 

 

      
   

 

 

 

    

 

 

 

 

 

 

 

 
     

 

 

 

    

 

 

pH KCI (23)
Titratable Actual Acidity (23F) 2 mole H+/t
sulfidic - Titratable Actual Acidity 0.02 % pyrite S <0.02
(s-23F)
£A033-B: Potential Acidity _ oo : a
"Chromium Reducible Sulfur (22B) 0.02 %S 0.04
acidity - Chromium Reducible Sulfur 10 mole H+/t 25
{@-22B)
EA033-E: Acid Base Accounting ae
ANC Fineness Factor 0.5
Net Acidity (sulfur units) 0.02 %S 0.06
Net Acidity (acidity units) 10 mole H+/t 36
Liming Rate 1 kg CaCO3it 3

   

 

 

 

el
A Campbell Brothers Limited Gempsny

Page 50

Page Number :5o0fs

 

 

Client : GOLDER ASSOCIATES
Work Order : EBO711624 ALS Eratraraenivel
Surrogate Control Limits

@ No surrogates present on this report.

er
Report version: COANA 3.02 A Campbeit Brothers Limiter Company

Page 51

ALS Latbaratary Group
ANALYTICAL CHEMISTRY & TESTING SERVICES

 

Environmenta! Division

 

 

 

QUALITY CONTROL REPORT

 

Work Order

Client
Contact

Address

E-mail
Telephone
Facsimile

Project

Site

C-O-C number
Sampler
‘Order number

Quete number

: EBO711624 Page 1 0f5
: GOLDER ASSOCIATES Laboratory ; Environmental Division Brisbane
: MR DANIEL JOYCE Contact : Tim Kilmister
: P.O BOX 5569 MAROOCHYDORE SOUTH QLD AUSTRALIA Address : 32 Shand Street Stafford QLD Australia 4053
4558
: [email protected] E-mail : [email protected]
: +61 07 5443 3511 Telephone : : +61-7-3243 7222
: +61 07 5443 6645 Facsimile 1 +61-7-3243 7218
: 077682076 STARCO SUBDIV NOOSA SPRINGS QC Level : NEPM 1999 Schedule B(3) and ALS QCS3 requirement
+ ee Date Samples Received : 10-OCT-2007
= DuJ Issue Date : 19-OCT-2007
: MQ4752
No. of samples received 6
: EN/002/05 No. of samples analysed :6

 

 

 

 

This report supersedes any previous report(s) with this reference. Results apply to the sample(s) as submitted. All pages of this report have been checked and approved for

release.

This Quality Control Report contains the following information:
® Laboratory Duplicate (DUP) Report; Relative Percentage Difference (RPD) and Acceptance Limits
@ = Method Blank (MB) and Laboratory Control Spike (LCS) Report; Recovery and Acceptance Limits

@ = Matrix Spike (MS) Report; Recovery and Acceptance Limits

 

NATA Accredited Laboratory 825

This document is issued in
accordance with NATA
accreditation requirements.

Accredited for compliance with

ISOMEC 17025.

 

Signatories
This document has been electronically signed by the authorized signatories indicated below. Electronic signing has been
carried out in compliance with procedures specified in 21 CFR Part 11.

Signatories Position Accreditation Category

Jessica Garwood Supervisor - Acid Sulphate Soils Inorganics

Environmental Oluision Brisbane
Pad ofthe ALS Lateratary Graup

32 Shand Street Stafford QLD Australia 4053
Tel. +81-7-3243 7222 Fax. +61-7-3243 7218 www.alsglobal.com

A Campbell Bro

 

crs Limited Company

 

Page 52

Page 1 20f5

 

Work Order : EBO711624
Client ; GOLDER ASSOCIATES
Project : 077682076 STARCO SUBDIV NOOSA SPRINGS

meena aetna NNN NNN NNN CCCI

General Comments

The analytical procedures used by the Environmental Division have been developed from established internationally recognized procedures such as those published by the USEPA, APHA, AS and NEPM. In house
developed procedures are employed in the absence of documented standards or by client request.

Where moisture determination has been preformed, results are reported on a dry weight basis.
Where a reported less than (<) result is higher than the LOR, this may be due to primary sample extract/digestate dilution and/or insuffient sample for analysis.

Where the LOR of a reported result differs from standard LOR, this may be due to high moisture content, insufficient sample (reduced weight employed) or matrix interference.

Key: Anonymous = Refers to samples which are not specifically part of this work order but formed part of the QC process fot
CAS Number = Chemistry Abstract Services number
LOR = Limit of reporting
RPD = Relative Percentage Difference
# = Indicates failed QC

 

Page 53

Page : 30fS

   

Work Order ; €BO711624
Client : GOLDER ASSOCIATES
Project : 077682076 STARCO SUBDIV NOOSA SPRINGS ALS

 

Laboratory Duplicate (DUP) Report

The quality control term Laboratory Duplicate refers to a randomly selected intralaboratory split. Laboratory duplicates provide information regarding method precision and sample heterogeneity. The permitted ranges
for the Relative Percent Deviation (RPD) of Laboratory Duplicates are specified in ALS Method QWI-EN/38 and are dependent on the magnitude of results in comparison to the level of reporting: Result < 10 times LOR-
No Limit; Result between 10 and 20 times LOR:- 0% - 50%; Result > 20 times LOR:- 0% - 20%,

 

 

 

 

 

 

 

 

 

 

 

 

   
 
   
   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-Matrix: SOIL Laboratory Duplicate (DUP} Report
Laboratory sample ID Client sample 1D Ie CAS Number: LOR | Unit Original Result Duplicate Result I RPD {%) Ll Recovery Limits {%)
Niet ecret eens ee ie Cy : : 4
EB0711624-001 BH5 0.5m
mole H+ /t 0% - 50%
EA033: pH KCI (23A)
SG Be ee tia} Acid e 6 “3 Boe
EB0711624-001 BH5 0.5m £A033:; Chromium Reducible Sulfur (228) —[ 0027 | %S <0,02 i <0.02 ' 0.0 i =
EA033: acidity - Chromium Reducible Sulfur —| 10 | mole H+ /t <10 <10 6 00 -
(@-22B) | i :

 

 

 

 

A Campbell

Page 54

Page : 40f5

   

Work Order . EBO711624
Client : GOLDER ASSOCIATES ‘
Project ; 077682076 STARCO SUBDIV NOOSA SPRINGS ALS

neteetnaaemmenemmmntantaaannneeeneeetnemenmitnittnctNNRNNNERINeitnentNnnnaeeenmmnicnnnusninusunumeuaeemnetCementnaneTatnt
Method Blank (MB) and Laboratory Control Spike (LCS) Report

The quality control term Method / Laboratory Blank refers to an analyte free matrix to which all reagents are added in the same volumes or proportions as used in standard sample preparation. The purpose of this QC
parameter is to monitor potential laboratory contamination. The quality control term Laboratory Control Sample (LCS) refers to a ceriified reference material, or a known interference free matrix spiked with target
analytes. The purpose of this QC parameter is to monitor method precision and accuracy independent of sample matrix. Dynamic Recovery Limits are based on statistical evaluation of processed Les.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-Matrix: SOIL Method Blank (M8) Report Laboratory Control Spike {LCS) Report
"Spike Spite Recover, | Recovery Limite 9)
Method: Compound CAS Number LOR Unit a Result Concentration ics ~ Low High
RRL ees ee OOLG : 5 :
EA033: Titratable Actual Acidity (23F) — 2 mole H+/t | <2 | — ~~ — —
EA033: sulfidic - Titratable Actual Acidity (s-23F) —_ 0.02 % pyrite . <0.02 C _— — —_ —
Ube ga Nate vats e oe

 

  
  

 

hromium Reducible Sulfur (22B)
cidity - Chromium Reducible Sulfur (a-22B)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A heh e zs gj ro § O3 y 883 is Ss
EA033: Acid Neutralising Capacity (19A1) —_ 0.01 % CaCO3 <0.01 _ | —_— — —
EA033: acidity - Acid Neutralising Capacity (a-19A1) —f 10 mole H+ /t <10 — — — —
EA033: sulfidic - Acid Neutralising Capacity (s-19A1) = 0.01 % pyrite S <0.01 —_ —_— — —

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 55

Page : 5o0f5

 

Work Order : EB0711624
Client ; GOLDER ASSOCIATES
Project : 077682076 STARCO SUBDIV NOOSA SPRINGS

 

Matrix Spike (MS) Report

The quality control term Matrix Spike (MS) refers to an intralaboratory split sample spiked with a representative set of target analytes. The purpose of this QC parameter is to monitor potential matrix effects on analyte
recoveries. Static Recovery Limits as per laboratory Data Quality Objectives (DQOs). Ideal recovery ranges stated may be waived in the event of sample matrix interference.

@ No Matrix Spike (MS) Results are required to be reported.

 

Page 56

 

ALS Laboratory Group
ANALYTICAL CHEMISTRY & TESTING SERVICES

 

 

 

 

 

 

 

 

Environmental Division

 

 

 

INTERPRETIVE QUALITY CONTROL REPORT

 

Work Order :EB0711624

Client : GOLDER ASSOCIATES

Contact : MR DANIEL JOYCE

Address : PO BOX 5569 MAROOCHYDORE SOUTH QLD AUSTRALIA 4558
E-mail : [email protected]

Telephone > +61 07 5443 3511

Facsimile : +61 07 5443 6645

Project : 077682076 STARCO SUBDIV NOOSA SPRINGS
Site —

C-O-C number i

Sampler : DJJ

Order number :MQ4752

Quote number : EN/002/05

Page

Laboratory
Contact
Address
E-mail
Telephone
Facsimile

QC Level

Date Samples Received
Issue Date

No. of samples received
No. of samples analysed

21 0f6

: Environmental Division Brisbane
: Tim Kilmister

: 32 Shand Street Stafford QLD Australia 4053
: [email protected]

: +61-7-3243 7222

: +61-7-3243 7218

: NEPM 1999 Schedule B(3) and ALS QCS3 requirement

: 10-OCT-2007
: 19-OCT-2007

:6
:6

 

This report supersedes any previous report(s) with this reference. Results apply to the sample(s) as submitted. All pages of this report have been checked and approved for release.

This Interpretive Quality Control Report contains the following information:
@ Analysis Holding Time Compliance
® Quality Control Parameter Frequency Compliance
@ Brief Method Summaries
@ Summary of Outliers

NTT LLC T TTT tN TERR STreTteRRttETRt TT

€nulronmental Division Brisbane
Pad ofthe ALS Laberatery Greup
32 Shand Street Slafford QLD Australia 4053
‘Tel. +84-7-8283 7222 Fax. +61-7-3243 7218 wwwalsylobal.com

A Campbell Brothers Limited Company

 

Page 57

Page 1 20ff

 

 

 

 

 

 

 

 

 

 

Work Order ; £B0711624 kd
Client : GOLDER ASSOCIATES _
Project : 077682076 STARCO SUBDIV NOOSA SPRINGS ALS

 

Analysis Holding Time Compliance

The following report summarises extraction / preparation and analysis times and compares with recommended holding times. Dates reported represent first date of extraction or analysis and precludes subsequent
dilutions and reruns. Information is also provided re the sample container (preservative) from which the analysis aliquot was taken. Elapsed period to analysis represents number of days from sampling where no
extraction / digestion is involved or period from extraction / digestion where this is present. For composite samples, sampling date is assumed to be that of the oldest sample contributing to the composite. Sample date
for laboratory produced leachates is assumed as the completion date of the leaching process. Outliers for holding time are based on USEPA SW 846, APHA, AS and NEPM (1998). A listing of breaches is provided in
the Summary of Outliers.

Holding times for feachate methods (excluding elutriates) vary according to the analytes being determined on the resulting solution. For non-volatile analytes, the holding time compliance assessment compares the
leach date with the shortest analyte holding time for the equivalent soil method. These soil holding times are: Organics (14 days); Mercury (28 days) & other metals (180 days). A recorded breach therefore does not
guarantee a breach for all non-volatile parameters.

Evaluation: x = Holding time breach ; “ = Within holding time.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

Matrix: SOIL
° ee ee Sample Date | Extraction / Preparation “Analysis
Container / Client Sample ID(s) Date extracted | Due for extraction | Evaluation Date analysed Due for anatysis Evaluation
ee ae on ’
Snap Lock Bag |
BHS - 0.5m, BHS5 - 1.75m, 08-OCT-2007 | 10-OCT-2007 | 09-OCT-2007 Kx 15-OCT-2007 | 13-JAN-2008 vo
BH5 - 2.25m, BH8 - 0.75m, |
BH8 - 1.75m, BH8 - 3m
A Bie reo) 4 Eee
Snap Lock Bag | | |
BHS - 0.5m, BH5 - 1.75m, 08-OCT-2007 | 10-OCT-2007 i 09-OCT-2007 | x 18-OCT-2007 | 13-JAN-2008 |
BHS - 2.25, BH - 0.75m, i '
BHB - 1.75m, BH8 - 3m - | L
AG roe 920} oH OF-F er) :
Snap Lock Bag i
BHS - 0.5m, BH5 - 1.75m, 08-OCT-2007 | 10-OCT-2007 | 09-OCT-2007 ' x 15-OCT-2007 | 13-JAN-2008 v
BH5 - 2.25m, BH8 - 0.75m, | |
BH8 - 1.75m, BH8 - 3m _
AG i 108 3 ere erakee le)
Snap Lock Bag ~ | ~~ P
BH5 - 0.5m, BHS - 1.75m, 08-OCT-2007 | 10-OCT-2007 | 09-OCT-2007 % 45-OCT-2007 | 13-JAN-2008 ov
BHS5 - 2.25m, BH8 - 0.75m,
BH8 - 1,75m, BH8 - 3m |
a0 aoe : g / o
Snap Lock Bag —_ —_ /
BHS - 0.5m, BHS5 - 1.75m, 08-OCT-2007 | 10-OCT-2007 | 09-OCT-2007 | % 15-OCT-2007 | 13-JAN-2008 ov
BHS - 2.25m, BH8 - 0.75m, i |
BH8 - 1.75m, BH8 - 3m

 

 

 

Page 58

Page : 30f6

 

 

 

 

 

 

 

 

 

 

 

Work Order : EBO711624 q
Client : GOLDER ASSOCIATES oe
Project : 077682076 STARCO SUBDIV NOOSA SPRINGS ALS

 

Quality Control Parameter Frequency Compliance

The following report summarises the frequency of laboratory QC samples analysed within the analytical lot(s) in which the submitted sample(s) was(where) processed, Actual rate should be greater than or equal to
the expected rate. A listing of breaches is provided in the Summary of Outliers.

  
 
  
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Matrix: SOIL Evaluation: * = Quality Control frequency not within specification ; v = Quality Control frequency within specification.
nel Sore Tope Se ot ae 8) "T Quality Control Specification ~
Analytical Methods
5 ieee :
Chromium Suite for Acid Sulphate Soils - ~ EA033 4 PM 1999 Schedule B(3) and ALS QCS3 requirement
uae eg ee ; :
Chromium Suite for Acid Sulphate Soils EA033 1 " 6

 

NEPM 1999 Schedule B(3) and ALS QCS3 requirement

|

 

 

 

 

Page 59

Page > 40f6

 

 

 

 

 

 

 

 

 

 

 

Work Order : EBO711624
Client : GOLDER ASSOCIATES
Project , 077682076 STARCO SUBDIV NOOSA SPRINGS ALS

 

Brief Method Summaries

The analytical procedures used by the Environmental Division have been developed from established internationally recognized procedures such as those published by the US EPA, APHA, AS and NEPM. in house
developed procedures are employed in the absence of documented standards or by client request. The following report provides brief descriptions of the analytical procedures employed for results reported in the
Certificate of Analysis. Sources from which ALS methods have been developed are provided within the Method Descriptions,

eiho) : ee Be Upeee iene ie : "
Chromium Suite for Acid Sulphate Soils EA033 SOIL Ahern et al 2004. This method covers the determination of Chromium Reducible Sulfur (SCR); pHKCI; titratable
actual acidity (TAA); acid neutralising capacity by back titration (ANC); and net acid soluble sulfur (SNAS) which
incorporates peroxide sulfur. It applies to soils and sediments (including sands) derived from coastal regions.
Liming Rate is based on results for samples as submitted and incorporates a minimum safety factor of 1.5.

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

aration Meliod 2 } te

Drying at 85 degrees, bagging and ENO20PR In house
labelling (ASS)

 

 

Page 60

Page 1 50f6

Work Order ; EBO711624
Client : GOLDER ASSOCIATES
Project : 077682076 STARCO SUBDIV NOOSA SPRINGS

 

‘atten eee ninntanmenernneianeeentnnteetninttttnttinnnnnaetemennntnmnint

Summary of Outliers
Outliers : Quality Control Samples

The following report highlights outliers flagged in the Quality Control (QC) Report. Surrogate recovery limits are static and based on USEPA SW846 or ALS-QWI/EN/38 (in the absence of specific USEPA limits).
"Anonymous" Client Sample {Ds refer to samples which are not specifically part of this work order but formed part of the QC process lot, This report displays QC Outliers (breaches) only,

Duplicates, Method Blanks, Laboratory Control Samples and Matrix Spikes

@ For ail matrices, no Method Blank value outliers occur,

@ For ail matrices, no Duplicate outliers occur.

® For all matrices, no Laboratory Control outliers occur.

@ For all matrices, no Matrix Spike outliers occur.

Regular Sample Surrogates
@ For all regular sample matrices, no surrogate recovery outliers occur.

Outliers : Analysis Holding Time Compliance
This report displays Holding Time breaches only. Only the respective Extraction / Preparation and/or Analysis component is/are displayed.

Matrix: SOIL

Container / Client Sample ID(s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ree Ore

Snap Lock Bag
BHS - 0.5m, BH65 - 1.75m,
BHS - 2.25m, BH8 - 0.75m,
BH8 - 1.75m, BH8-3m
roa 25a oh) ei EVENS EB

SnapLockBag tt tsti—i—sS
BH5 - 0.5m, BHS - 1.75m,
BHS - 2.25m, BH8 - 0.75m,
BH8 - 1.75m, BH8 - 3m
AG ‘ E

Snap Lock Bag
BH5 - 0.5m, BHS5 - 1.75m,
BHS - 2.25m, BH8 - 0.75m,
BH8 - 1.75m, BH8 - 3m
Nie asst .

Snap Lock Bag ~
BHS - 0.5m, BH5 - 1.75m,
BHS5 - 2.25m, BH8 - 0.75m,
BHB - 1.75m, BH8 - 3m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ae Mellie cas ayer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Days

|
i_overdue

 
  
 

 

 

10-OCT-2007

10-OCT-2007

09-OCT-2007

 

| 09-OCT-2007
i

Due for analysis

  
  
 
 
    
  

       

Days
overdue

  

 

 

  

 

 

 

 

1

 

;
t
| se-ocr.2007 | 09-OCT-2007

 

 

 

 

 

 

|
10-OCT-2007 | 09-OCT-2007
|

 

 

 

 

 

Page 61

Page : 6 of6

Work Order : EBO711624

Client : GOLDER ASSOCIATES

Project : 077682076 STARCO SUBDIV NOOSA SPRINGS

 

Matrix: SOIL

 

 

 

 

 

p 5 Extraction / Preparation Analysis:
Container / Client Sample ID(s) Date extracted Due for extraction | Date analysed Due for analysis
; Days

Days
| L_ overdue overdue

 

 

Acid Base Acconuth
Snap Lock Bag
BHS - 0.5m, BHS - 1.75m, 10-OCT-2007
BHS - 2.25m, BHB - 0.75m,
BH8 - 1.75m, BH8 - 3m

 

 

 

 

09-OCT-2007 1

 

 

Outliers : Frequency of Quality Control Samples

The following report highlights breaches in the Frequency of Quality Control Samples.

@ No Quality Control Sample Frequency Outliers exist.

 

Page 62

  
 

 

ALS Laboratory Group
A AL CHEMISTRY & TESTING SERVICES

 

Environmental Division
SAMPLE RECEIPT NOTIFICATION (SRN)

Comprehensive Report

 

 

 

 

 

 

Work Order : EB0711624

Client : GOLDER ASSOCIATES Laboratory : Environmental Division Brisbane

Contact : MR DANIEL JOYCE Contact : Tim Kilmister

Address : PO BOX 5569 MAROOCHYDORE Address : 32 Shand Street Stafford QLD Australia
SOUTH QLD AUSTRALIA 4558. 4053

E-mail : [email protected] E-mail : [email protected]

Telephone : +61 07 5443 3511 Telephone : +61-7-3243 7222

Facsimile : +61 07 5443 6645 Facsimile + +61-7-3243 7218

Project : 077682076 STARCO SUBDIV NOOSA Page > 10f2
SPRINGS

Order number : MQ4752

C-O-C number le Quote number : £S20050035 (EN/002/05)

Site io

Sampler : DJS QC Level :NEPM 1999 Schedule B(3) and ALS

QCS3 requirement

Dates

Date Samples Received : 10-OCT-2007 issue Date + 10-OCT-2007 11:24

Client Requested Due Date : 19-OCT-2007 Scheduled Reporting Date : 49-OCT-2007

Delivery Details

Mode of Delivery : Carrier Temperature : 4.6 C - Ice present

No. of coolers/boxes : 1 MEDIUM No. of samples received 76

Sercurity Seal : Intact. No. of samples analysed 26

General Comments

®@ = This report contains the following information:

- Sample Container(s)/Preservation Non-Compliances

- Summary of Sample(s) and Requested Analysis

- Requested Deliverables
Samples received in appropriately pretreated and preserved containers.
Breaches in recommended extraction / analysis holding times may occur.
The recommended holding time for Acid Sulphate analysis is 24 hours from the time of sampling.
Please direct any turn around / technical queries to the laboratory contact designated above.
Please direct any queries related to sample condition / numbering / breakages to Maggie Kahi.
Analytical work for this work order will be conducted at ALSE Brisbane.
Sample Disposal - Aqueous (14 days), Solid (90 days) from date of completion of work order.

 

Environmental Biuision Brisbane
Patol the ALS Leboratory Group
32 Shand Street Stafford QLD Australia 4063
Tel, +61-7-3243 7222 Fax +61-7-3242 7218 www.alsglobal.com

AG:

  

Page 63

Issue Date : 10-OCT-2007 11:24

 

Page :20f2
Work Order ; EBO711624
Client : GOLDER ASSOCIATES

 

Sample Container(s)/Preservation Non-Compliances

All comparisons are made against pretreatment/preservation AS, APHA, USEPA standards.

@ Nosample container / preservation non-compliance exist.

 

Summary of Sample(s) and Requested Analysis

 

Some items described below may be part of a laboratory
process neccessary for the execution of client requested
tasks. Packages may contain additional analyses, such as
the determination of moisture content and preparation
tasks, that are included in the package.

When date(s) and/or time(s) are shown bracketed, these
have been assumed by the laboratory for process purposes.

 

 

 

 

 

 

 

 

a
3

3

2

a

2

s

5

a

zB

S

2

2

g

84

Matrix: SOIL 3?
aS

; .

Laboratory sample Client sampling Client sample ID 2 5
1D date /time aS
EB0711624-001 08-OCT-2007 15:00 BHS 0.5m v
EB0711624-002 08-OCT-2007 15:00. BHS 1.75m ¥
EB0711624-003 08-OCT-2007 45:00 © BH5S 2.25m v
EB0711624-004 08-OCT-2007 15:00 BH8 0.75m v
£B0711624-005 08-OCT-2007 15:00 BH8 1.75m v
£B0711624-006 08-OCT-2007 15:00 | BH8 3m v

 

 

 

 

Requested Deliverables

MR DANIEL JOYCE
- A4- AU Certificate of Analysis - NEPM format Email [email protected]
- A4- AU Interpretive Quality Control Report Email [email protected]
- A4-AU Quality Control Report - NATA Email [email protected]
- A4- AU Sample Receipt Notification Email [email protected]
- Default - Chain of Custody Email [email protected]
~ EDI Format - GHDNEW Email [email protected]

THE ACCOUNTS PAYABLE (MRCHYDRE)
- A4-AU Tax Invoice Email [email protected]

 

 

Page 64

Forward to: ALS Environmental
32 Shand Street Stafford QLD

 

      
  
 

   

077682076

  
  
 

   

MQ4752 Project No.:

   
 
   

Starco/Subdiv/Noosa spring

 
 
 

EN/002/05

 
  
   
 
   
   
  
 

Contact Name:

Full SPOCAS Suite

  

Full Chromium Suite
SPOCAS (No ANC, No Spas)

  
 
  

No. of
Bags

   
  
 
 

 

       

TESTING REQUEST FORM

GOLDER ASSOCIATES PTY LTD

Unit 1 Dalton Centre Phone: (: (07) 54433511
Newspaper Place 3 (07) 54436645
Maroochydore Qld 4558

Fax

     
  

    

   
  

  

Ske
PHxc,p TAA

TAA + Spas

   

   
  
  

PHxc Only
TAA + TPA + TSA Only
FIELD SCREEN (pH; + pHa)
HOLD FOR FUTURE TESTS

   
   
  

 

\ Basco a stoz007 _t
2 pas as soit ar on007 -
S[pus 2s soil Pt vioz007 .
4 pS soit TT sorz007
Spee sot roo
BES Ls | sol TT 8t02007 1
Checked by: “22,4, Please Return Signed Copy By Faogimile: /
Date Sent from Golder Lab: 9/10/2007 Environmental Division Date Received By ALS: jo we a Signature: zt -
Brisbane Dom
Work Order

EBO0711624

IL

Telephone : + 61-7-3243 7222

Page 65

Appendix D

Important Information About Your Geo-Environmental Report

Page 66

 

Geo-environmental studies are commissioned to gain
information about environmental conditions on and
beneath the surface of a site. The more comprehensive
the study, the more reliable the assessment is likely to be.
But remember, any such assessment is to a greater or
lesser extent based on professional opinions about
conditions that cannot be seen or tested. Accordingly, no
matter how much data is accumulated, risks created by
unanticipated conditions will always remain. Have
realistic expectations. Work with your Geo-
environmental consultant to manage known and
unknown risks. Part of that process should already have
been accomplished, through the risk allocation
provisions you and your Geo-environmental professional
discussed and included in your contract's general terms
and conditions. This document is intended to explain
some of the concepts that may be included in your
agreement, and to pass along information and
suggestions to help you manage your risk.

Beware of Change; Keep Your Geo-
environmental Professional Advised
The design of a Geo-environmental study considers a
variety of factors that are subject to change. Changes
can undermine the applicability of a report's findings,
conclusions, and recommendations. Advise your Geo-
environmental professional about any changes you
become aware of them. Geo-environmental
professionals cannot accept responsibility or liability for
problems that occur because a report fails to consider
conditions that did not exist when the study was
designed. Ask your Geo-environmental professional
about the types of changes you should be particularly
alert to. Some of the most common include:
e modification of the proposed development or
ownership group,
«sale or other property transfer,
replacement of or additions to the financing entity,
amendment of existing regulations or introduction of
new ones, or
changes in the use or condition of adjacent property

Should you become aware of any change, do not rely on
an existing Geo-environmental report. Advise your
Geo-environmental professional immediately; follow the
professional's advice.

Recognize the Impact of Time

A Geo-environmental professional's _ findings,
recommendations, and conclusions cannot remain valid
indefinitely. The more time that passes, the more likely
it is that important latent changes may occur. Do not rely
on a Geo-environmental report if too much time has
elapsed since it was completed. Ask your environmental
professional to define “too much time." In the case of
Phase I Environmental Site Assessments (ESAs), for
example, more than 180 days after submission is
generally considered "too much."

Prepare To Deal with Unanticipated
Conditions

The findings. recommendations, and conclusions of a
Phase I ESA report typically are based on a review of
historical information, interviews, a site “walkover,” and
other forms of noninvasive research. When site
subsurface conditions are not sampled in any way, the
risk of unanticipated conditions is higher than it would
otherwise be.

While borings, installation of monitoring wells, and
similar invasive test methods can help reduce the risk of
unanticipated conditions, do not overvalue the
effectiveness of testing. Testing provides information
about actual conditions only at the precise locations
where samples are taken, and only when they are taken.
Your Geo-environmental professional has applied that
specific information to develop a general opinion about
environmental conditions. Actual conditions in areas
not sampled may differ (sometimes sharply) from those
predicted in a report. For example, a site may contain
an unregistered underground storage tank that shows no
surface trace of its existence. Even conditions in areas
that were tested can change, sometimes suddenly, due to
any number of events, not the least of which include
occurrences at adjacent sites. Recognize, too, that even
some conditions in tested areas may go undiscovered,
because. the tests or analytical methods used were
designed to detect only those conditions assumed to
exist.

Manage your risks by retaining your Geo-environmental
professional to work with you as the project proceeds.
Establish a contingency fund or other means to enable
your Geo-environmental professional to respond rapidly,
jn order to limit the impact of unforeseen conditions. To
help prevent any misunderstanding, identify those
Page 1 of 3

GAP - Form No.34
RL

Page 67

empowered to authorize changes and the administrative
procedures that should be followed.

Do Not Permit Any Other Party To Rely on
the Report

Geo-environmental professionals design their studies and
prepare their reports to meet the specific needs of the
clients who retain them, in light of the risk management
methods that the client and Geo-environmental
professional agree to, and the statutory, regulatory, or
other requirements that apply. The study designed for a
‘developer may differ sharply from one designed for a
lender, insurer, public agency .. or even another
developer. Unless the report specifically states
otherwise, it was developed for you and only you. Do
not unilaterally permit any other party to rely on it. The
report and the study underlying it may not be adequate
for another party's needs, and you could be held liable
for shortcomings your Geo-environmental professional
was powerless to prevent or anticipate. Inform your
Geo-environmental professional when you know or
expect that someone else - a third-party will want to use
or rely on the report. Do not permit third-party use or
reliance until you first confer with the Geo-
environmental professional who prepared the report.
Additional testing, analysis, or study may be required
and, in any event, appropriate terms and conditions
should be agreed to so both you and your Geo-
environmental professional are protected from third-
party risks. Any party who relies on a Geo-
environmental report without the express written
permission of the professional who prepared it and the
client for whom it was prepared may be solely liable for
any problems that arise.

Avoid Misinterpretation of the Report

Design professionals and other parties may want to rely
on the report in developing plans and specifications.
They need to be advised, in writing, that their needs may
not have been considered when the study's scope was
developed, and, even if their needs were considered, they
might misinterpret Geo-environmental _ findings,
conclusions, and recommendations. Commission your
Geo-environmental professional to explain pertinent
elements of the report to others who are permitted to rely
on it, and to review any plans, specifications or other
instruments of professional service that incorporate any
of the  report’s “findings, conclusions, or
recommendations. Your Geo-environmental
professional has the best understanding of the issues
involved, including the fundamental assumptions that
determined the study's scope.

Give Contractors Access to the Report

Reduce the risk of delays, claims, and disputes by giving
contractors access to the full report, providing that it is
accompanied by a letter of transmittal that can protect
you by making it unquestionably clear that: 1) the study
was not conducted and the report was not prepared for
purposes of bid development, and 2) the findings,
conclusions, and recommendations included in the report

are based on a variety of opinions, inferences, and
assumptions and are subject to interpretation. Use the
letter to also advise contractors to consult with your Geo-
environmental professional to obtain clarifications,
interpretations, and guidance (a fee may be required for
this service), and that-in any event-they should conduct
additional studies to obtain the specific type and extent
of information each prefers for preparing a bid or cost
estimate. Providing access to the full report, with the
appropriate caveats, helps prevent formation of
adversarial attitudes and claims of concealed or differing
conditions. If a contractor elects to ignore the warnings
and advice in the-letter of transmittal, it would do so at
its own risk. Your Geo-environmental professional
should be able to help you prepare an effective letter.

Do Not Separate Documentation from the
Report

Geo-environmental reports often include supplementary
documentation, such as maps and copies of regulatory
files, permits, registrations, citations, and
correspondence with regulatory agencies. If subsurface
explorations were performed, the report may contain
final boring logs and copies of laboratory data. If
remediation activities occurred on site, the report may
include: copies of daily field reports, waste manifests,
and information about the disturbance of subsurface
materials, the type and thickness of any fill placed on
site, and fill placement practices, among other types of
documentation. Do not separate supplementary
documentation from the report. Do not, and do not
permit any other party to redraw or modify any of the
supplementary documentation for incorporation into
other professionals’ instruments of service.

Understand the Role of Standards

Unless they are incorporated into statutes or regulations,
standard practices and standard guides developed by the
American Society for Testing and Materials (ASTM) and
other recognized standards-developing organizations
(SDOs) are little more than aspirational methods agreed
to by a consensus of a committee. The committees that
develop standards may not comprise those best qualified
to establish methods and, no matter what, no standard
method can possibly consider the infinite client and
project-specific variables that fly in the face of the
theoretical “standard conditions" to which standard
practices and standard guides apply. In fact, these
variables can be so pronounced that Geo-environmental
professionals who comply with every directive of an
ASTM or other standard procedure could run foul of
local custom and practice, thus violating the standard of
care.

Accordingly, when Geo-environmental professionals
indicate in their reports that they have performed a
service “in general compliance" with one standard or
another, it means they have applied professional
judgement in creating and implementing a scope of
service designed for the specific client and project
involved, and which follows some of the general
precepts laid out in the referenced standard. To the

Page 2 of 3
GAP —~ Form No. 34

Page 68

extent that a report indicates "general compliance" with a
standard, you may wish to speak with your Geo-
environmental professional to learn more about what was
and was not done. Do not assume a given standard was
followed to the letter. Research indicates that that
seldom is the case.

Realize That Recommendations May Not Be
Final

The technical recommendations included in a Geo-
environmental report are based on assumptions about
actual conditions, and so are preliminary or tentative.
Final recommendations can be prepared only by
observing actual conditions as they are exposed. For that
reason, you should retain your Geo-environmental
professional to observe construction and/or remediation
activities on site, to permit rapid response to
unanticipated conditions. The Geo-environmental
professional who prepared the report cannot assume
responsibility or liability for the  report’s
recommendations if that professional is not retained to
observe relevant site operations.

Understand That Geotechnical Issues Have
Not Been Addressed

Unless geotechnical engineering was specifically
included in the scope of professional service, a report is
not likely to relate any findings, conclusions, or
recommendations about the suitability of subsurface
materials for construction purposes, especially when site
remediation has been accomplished through the removal,
replacement, encapsulation, or chemical treatment of on-
site soils. The equipment, techniques, and testing used
by geotechnical engineers differ markedly from those
used by Geo-environmental professionals; _ their
education, training, and experience are also significantly
different. If you plan to build on the subject site, but
have not yet had a geotechnical engineering study
conducted, your Geo-environmental professional should
be able to provide guidance about the next steps you
should take. The same firm may provide the services
you need.

Read Responsibility Provisions Closely
Geo-environmental studies cannot be exact; they are
based on professional judgement and _ opinion.
Nonetheless, some clients, contractors, and others
assume Geo-environmental reports are or certainly
should be unerringly precise. Such assumptions have
created unrealistic expectations that have led to wholly
unwarranted claims and disputes. To help prevent such
problems, Geo-environmental professionals have
developed a number of report provisions and contract
terms that explain who is responsible for what, and how
risks are to be allocated. Some people mistake these for
"exculpatory clauses," that is, provisions whose purpose
is to transfer one party's rightful responsibilities and
liabilities to someone else. Read the responsibility
provisions included in a report and in the contract you
and your Geo-environmental professional agreed to.
They are important.

Rely on Your Geo-environmental
Professional for Additional Assistance
Membership in ASFE exposes Geo-environmental
professionals to a wide array of risk management
techniques that can be of genuine benefit for everyone
involved with a Geo-environmental project. Confer with
your ASFE-member Geo-environmental professional for
more information.

Page 3 of 3
GAP - Form No. 34

Used in these records

About this file

File size
6.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix 5. Geotechnical Engineering Report [As Published].pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.