Council archive · source document
Appendix 5. Geotechnical Engineering Report [As Published] · 132007.2399
October 2007 -18- 077682076(AB) In order to enable the provision of detailed geotechnical advice for the development of this site, it is recommended that further geotechnical investigation should be carried out at the civil/building works stage. Such further investigation should include additional boreholes, which could also be utilised to satisfy the ASS investigation requirements per State Guidelines. 7.0 IMPORTANT INFORMATION Your attention is drawn to the document - “Important Information About Your Geo- environmental Report”, which is included in Appendix D of this report. This document has been prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which Golder Associates is a member. The statements presented in this document are intended to advise you of what your realistic expectations of this report should be, and to present you with recommendations on how to minimise the risks associated with the groundworks for this project. The document is not intended to reduce the level of responsibility accepted by Golder Associates, but rather to ensure that all parties who may rely on this report are aware of the responsibilities each assumes in so doing. We would be pleased to answer any questions about this important information from the reader of this report. GOLDER ASSOCIATES PTY LTD Ashley Davey BE(Geéot.) MIEAust RPEQ 8159 Senior Geotechnical Engineer 41\2007\GEOTECHNICAL\077682076\00_CORRESPONDENCE\OUTIAB077682076R DOC ACDIDIQ/aed Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5. Geotechnical Engineering Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.