Original source · versioned page text
20220078 Wyandra St SWMP
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
OP WORKS
N N NOT FOR CONSTRUCTION
t
ran
24.70 24.79 24.70
Hyd
Fire
24.68 24.68 Fire H
PAVED GROUND
Sewer Manhole
ydran
Sewer t
25.46 Manho
41
A-3
25.41 le
25 102°02
.77 '00
24.7
3
26.35
TREE 0.1
20.115 " RP139776
50 805
5
.2
24 ROOF AREA
25
26.83
24.00 .69
TREE 0.151004 27.0 Sewer 24.00 Sewer
A-4
24.10 2
LIL 0.1 Line In Line In
7
27.07 dicative dicativ
.5
3
50905
.7
e Only
26
9
26.60
Only (N
25
n
.2
Kerb
26.22 (Not L
25
itume
25. 26.69 ot Loc ocate
d by
52 26.09 ated b Surve
5
27.
y Surv
.3
1 y)
7.7 86
26
2
2 ey)
STREET
.8
Telstr Back of
3
of B
24
.4
26
24.17
0
2
2
41
.7
.9
24.4
26.
26
25
26.41
Deck
Edge
4
.6
a
26
25 26. Pit
.84 45 Telstr
Pit
a
6
.4
23.57
25
23.57
4
.5
23.
24
67
00"
26
26.150
.50
Edge
12°02'
0
.5
9
26
.4
27.
of
27
Deck Stairs
NDRA
46
Bitum
23.
3
071
69
23.22 23.22
en
0.5
Ramp
0
23.3
23
23.27
IN C
.98
5
PO
.0
2
25
23.
.9
7
EET
23
3
23 .41
23
8
9
.5
REET
.65
.7
24
23
6
A STR
.1
26.1
26
Floor Level A-5
9
74
.0
8
23.
2
27
00
.1
27
RL26.19
23.
RA ST
24
23.00
40
.35
R
30.175 "
36
'00
WYAND
24.
1
.34
.1
25
23
192°02
25.25
.63
22.68 22.68
WYAND
Deck
24
A-2
Co
06
137
nc
25.
ret
59
23. 25.
19
RP160425
e
23.8
23.94
Dr
.23
96
BM (Screw in Kerb)
.
.57
ive
26
25
7
22 3
RL22.58 AHD 26.5
wa
22.59
25
5
y
26.85
.35
23.7
Stairs
23
Gully Pit .55 Gully
.2
8
24
.2
P
1
22.36 it
22.36
Garage Level
24
22.49
1
.35
A-1
.3
4
22
25
.6
RL25.33
24
0
26
.47
26.
3
.4
24.9
25
37
22.25 22.36 22.25
23
6
25
.6
.7
07
22
.15
25.
5
32 5.69
4
.0
24.80
23
7°0 0
13/07/2022
24.
9 4
3
2'0
.1
EA ID: 2557785
22.21
25
RPEQ: 26443
3
22.10
25.92
22.10
7
.2
22.97
.1
0"
25
26
23
.65 DO NOT SCALE, IF IN DOUBT ASK!
9 .7 5
24
48
22.12
.
22
.6
23.72
24
22.0
0 22.08 23 22.00
80
.06 23.97
Valve Valve
.
Po
24
08 Power
22. w 23.37
282°02 CAP SAFAR
pole
8
er CAP
.7
I
24
21.98
it 22.09 po
le Telstra P '00
16.090 "
24.7 25.20
21.98
STREE
T
Telstr
y P .98
3 8
ll it 24.4
25
.51 a Pit C 11/07/22 ISSUE FOR OPW BP NW
Gu 21
22 Gully
21.98
22.00 B 24/06/22 UPDATE ISSUE FOR MCU BP NW
25
Fire Hydrant 25. Pit
25 5
.00 22
Back 37
.1
.42 Fire H
.4
A 30/03/22 NOT USED
of Ker ydran BP NW
5
t
2 2.3
1
Edge b 22.31 Edge Rev Date Description By Chk
of Bitu 23.58 of Bit
umen
men 24.82
SAFARI
24.82
23
.46 Sewer Manhole SAFAR 23.46 Sewer
I STRE
Manho
le
STREET ET
24.95
24.8 24.85
5
[email protected]
37 MARY ST NOOSAVILLE, QLD
07 5211 1003
DEVELOPED CATCHMENT Client
PRE-DEVELOPED CATCHMENT FORDE PROPERTY
SITE AREA - 598m² Project Name
SITE AREA - 598m² RESIDENTIAL DUPLEX DEVELOPMENT
6 WYANDRA STREET
ROOF - 282.9m² NOOSA HEADS
ROOF - 172.5m² DRIVEWAY - 53.2m²
DRIVEWAY - 64.5m² OTHER PAVED - 113.6m² Title
OTHER PAVED - 67.4m² PERVIOUS - 148.3m² STORMWATER CATCHMENT PLAN
PERVIOUS - 293.6m²
IMPERVIOUS FRACTION - 75.2%
IMPERVIOUS FRACTION - 50.9%
Project No. Discipline Status
20220078 CIVIL OPW
Designed By Drawn By Scale
(at
BRP BRP 1:100 A1)
Drawing No. Revision
C35 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.