Original source · versioned page text
13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Infrastructure, including, access, parking, sewerage and water services
d) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a), (b) or (c) – the
relevant planning scheme
standard, to the extent it is more
stringent than the standard
mentioned in paragraph (a), (b)
or (c).
12.8 Appropriate measures are taken The design and construction of the Not applicable.
for prescribed tidal works for a non- prescribed tidal works is consistent
private purpose to ensure an with the following standards:-
unsupportable live load is not applied
to the work by persons or vehicles. The proposed structure is for private
a) subject to paragraph (b),
use i.e. the facility is not open to
prescribed tidal work has erected
public access at all times.
or placed in position on or near
the work, a sign that:-
(i) is visible at all times; and
(ii) states the maximum live
load that may be applied to
the work, in terms of the
maximum number of
persons that may be on the
work at any given time or the
maximum number of
vehicles of a particular type
that may be on or moored at
the work at any given time;
b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
that mentioned in paragraph (a).
12.9 Prescribed tidal works, other The design and construction of the Not applicable.
than a prescribed deck for a private prescribed tidal works is consistent
purpose, are designed and with each relevant planning scheme
constructed to ensure the use of tidal standard.
water in a canal for a non-maritime The proposed structure is not in a
purpose is minimised. canal.
12.10 Prescribed tidal works that are (s 5(2) outcome) Not applicable.
a prescribed deck and for a private
purpose, are designed and The design and construction of the
constructed in a way that ensures the prescribed deck is consistent with the
use of tidal water in a canal for a non- following standards:- The proposal is not a deck.
maritime purpose is minimised.
a) subject to paragraph (c), a
boardwalk or independent deck
does not extend more than 3m
from the waterfront boundary of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.