13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Design, construction and safety – jetties and piers
16.2 Prescribed tidal works that are a The design and construction of the Not applicable.
jetty or a pier are designed and jetty or pier is consistent with the
constructed in a way to ensure it following standards:-
remains above the water at highest
astronomical tide. The proposal is not a jetty or a pier.
a) Subject to paragraph (b), either:-
(i) The level of the deck of a
jetty or pier is at least
300mm above the water at
highest astronomical tide; or
(ii) Piles or other markers
indicate the presence of the
jetty or pier when it is
inundated;
b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a).
16.3 Prescribed tidal works that are a (s 5(2) outcome) Not applicable.
jetty or pier and for a private purpose
and are on State tidal land are The design and construction of the
designed and constructed in a way to jetty or pier is consistent with the
ensure the jetty or pier is of a size following standards:- The proposal is not a jetty or a pier.
suitable for the use of a vessel while
still minimizing the amount of tidal (a) subject to paragraph (b):-
water occupied by the jetty or pier. (i) all parts of the deck of the
jetty or pier have a width of
at least 900mm and not
more than 3m and
(ii) All parts of the jetty or pier
are within a water allocation
area for the lot connected to
the jetty or pier;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a).
Performance Criteria Acceptable Solution Comments
Design, construction and safety – pipelines and other underground services