13. OBoat Hire - Prescribed Tidal Works Code

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                      Acceptable Solution                       Comments

Design, construction and safety – jetties and piers

16.2 Prescribed tidal works that are a    The design and construction of the        Not applicable.
jetty or a pier are designed and          jetty or pier is consistent with the
constructed in a way to ensure it         following standards:-
remains above the water at highest
astronomical tide.                                                                  The proposal is not a jetty or a pier.
                                          a)   Subject to paragraph (b), either:-
                                               (i) The level of the deck of a
                                                    jetty or pier is at least
                                                    300mm above the water at
                                                    highest astronomical tide; or
                                               (ii) Piles or other markers
                                                    indicate the presence of the
                                                    jetty or pier when it is
                                                    inundated;
                                          b) if a relevant planning scheme
                                               standard is more stringent than
                                               the standard mentioned in
                                               paragraph (a) – the relevant
                                               planning scheme standard, to the
                                               extent it is more stringent than
                                               the standard mentioned in
                                               paragraph (a).
16.3 Prescribed tidal works that are a    (s 5(2) outcome)                          Not applicable.
jetty or pier and for a private purpose
and are on State tidal land are           The design and construction of the
designed and constructed in a way to      jetty or pier is consistent with the
ensure the jetty or pier is of a size     following standards:-                     The proposal is not a jetty or a pier.
suitable for the use of a vessel while
still minimizing the amount of tidal      (a) subject to paragraph (b):-
water occupied by the jetty or pier.          (i) all parts of the deck of the
                                                   jetty or pier have a width of
                                                   at least 900mm and not
                                                   more than 3m and
                                              (ii) All parts of the jetty or pier
                                                   are within a water allocation
                                                   area for the lot connected to
                                                   the jetty or pier;
                                          (b) if a relevant planning scheme
                                              standard is more stringent than
                                              the standard mentioned in
                                              paragraph (a) – the relevant
                                              planning scheme standard, to the
                                              extent it is more stringent than
                                              the standard mentioned in
                                              paragraph (a).

Performance Criteria                      Acceptable Solution                       Comments

Design, construction and safety – pipelines and other underground services
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.