13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Design, construction and safety – pontoons
b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned in
paragraph (a).
18.3 Prescribed tidal works that are a (s 5(2) outcome) Compliant.
pontoon are designed and
constructed in a way to ensure any The design and construction of the
load applied to the pontoon by a pontoon is consistent with the
person or thing on the pontoon does following standards:- The structure is appropriately
not cause the pontoon to tip over or designed for its intended purpose
tilt to a degree causing the person or a) subject to paragraph (b):- and will be consistent with the
thing to fall off the pontoon. (i) for a pontoon constructed Australian Standards relevant to the
design and construction of the
within a marina – AS 3962 to
structure. The engineered plans show
the extent requirements
relevant loadings and these are also
stated in the Standard apply addressed in the engineer’s design
to relevant loading matters report.
for the design or
construction of the
pontoon; or
All access walkways extend at least
(ii) for a pontoon not
500mm onto the receiving flotation
constructed within a unit.
marina:-
(A) the pontoon’s access
walkway extends at
least 500mm onto the The pontoon is not used only for
rowing.
pontoon’s flotation
unit; and
(B) for a pontoon use only
for rowing – at least The live load for the flotation units is
75mm of the height of compliant with the requirement. The
the pontoon’s flotation engineer’s design report and
construction plans confirm relevant
unit remains above the
details.
water over which it is
constructed if a
distributed live load is
applied to half of the
surface of the
pontoon’s flotation unit
and all of the surface of
the pontoon’s access
walkways; and
(C) for a pontoon other
than a pontoon
mentioned in sub-
subparagraph (B) – the
top surface of the
pontoon’s flotation unit
See the original